Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 233 Erie St Chicago Il Remove the existing absorbtion chiller, and replace with two daikin 175 ton chillers, self contained, water cooled, r134a. The chillers are located in the 25th floor machine room. Work to include all controls, piping, pumps, valves, and accessories. Date: February 10, 2016 Contractor: Streeterville Center Condominium Association Permit type: Permit - easy permit process | Permit id: 100634833 |