SCORE

STEPHEN DANNER

ABOUT STEPHEN DANNER

Stephen Danner specializes in:

Stephen Danner offers services:

Based on the information received from , associated with Stephen Danner over the past .

If you are considering hiring Stephen Danner for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Stephen Danner has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
164 W Newton St Roxbury Ma 02118
Renovate 1st and 2nd stories install interior partition walls. (per drawings) new electrical (design build) new plumbing (design build) install owners finishes. Renovate the existing basement storage and mechanical space to occupiable living space. Note. Drawing gcod and far exception
Date:  February 16, 2010
Value:   $284,186
Contractor: Stephen Danner

Client: Gartrell Kenneth D | Permit type: Renovations -interio | Current use: 1-2fam | Permit id: Alt13651 | Parcel: 402772000
2010/02/16284186100164 W Newton St Roxbury Ma 02118Stephen Danner
SCORE
100
164 W Newton St Roxbury Ma 02118
Interior framming drywall bathroom renovation and kitchen install. Plumbing mechanical and electrical.
Date:  February 25, 2010
Value:   $50,000
Contractor: Stephen Danner

Client: Gartrell Kennet | Permit type: Renovations -interio | Current use: 1-2fam | Permit id: Sf16148 | Parcel: 402772000
2010/02/2550000100164 W Newton St Roxbury Ma 02118Stephen Danner
SCORE
100
90 Beacon St Boston Ma 02108
Install new epdm roof install matching copper gutter at building rear tie in existing slate to gutter at building rear ; contact stephen (781)726-1373
Date:  April 7, 2010
Value:   $4,000
Contractor: Stephen Danner

Client: 90 Beacon St Condo Assoc | Permit type: Roofing | Current use: Multi | Permit id: Sf20886 | Parcel: 502553000
2010/04/07400010090 Beacon St Boston Ma 02108Stephen Danner
SCORE
100
40 Dartmouth St Boston Ma 02116
Install new epdm roof fix flashing at building rear (no flashing will change) contact for stephen (781) 726-1373
Date:  April 7, 2010
Value:   $7,200
Contractor: Stephen Danner

Client: Mc Cabe Joseph | Permit type: Roofing | Current use: 1unit | Permit id: Sf20888 | Parcel: 400314000
2010/04/07720010040 Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
164 W Newton St Roxbury Ma 02118
Add additional lvl to support roof and skylights. Remove rear window and add french door. Submitted: 2 sets stamped engineer plans.
Date:  April 28, 2010
Value:   $25,000
Contractor: Stephen Danner

Client: Gartrell Kenneth D | Permit type: Interior/exterior wo | Current use: 1-2fam | Permit id: Alt18364 | Parcel: 402772000
2010/04/2825000100164 W Newton St Roxbury Ma 02118Stephen Danner
SCORE
100
134 Cushing Av Boston Ma 02125
Remove existing epdm roof install . 060 epdm roofing fully adhere all perimeter metal pich pocket at roof pipes and conduit
Date:  June 10, 2010
Value:   $14,400
Contractor: Stephen Danner

Client: P And R Properties | Permit type: Renovations - exteri | Current use: 1-3fam | Permit id: Sf29425 | Parcel: 1301473000
2010/06/1014400100134 Cushing Av Boston Ma 02125Stephen Danner
SCORE
100
100 Stuart St Boston Ma 02116
23rdfl;unit c and d;interior renovations to these two units
Date:  January 31, 2011
Value:   $42,500
Contractor: Stephen Danner

Permit type: Renovations -interio | Current use: Comm | Permit id: Sf62299
2011/01/3142500100100 Stuart St Boston Ma 02116Stephen Danner
SCORE
100
173b Norfolk Av Roxbury Ma 02119
Interior demo and partition framming exterior painting and parking lot repairs
Date:  March 30, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: 99 Langdon Trust | Permit type: Interior/exterior wo | Current use: Comm | Permit id: Sf70115 | Parcel: 800560000
2011/03/3025000100173b Norfolk Av Roxbury Ma 02119Stephen Danner
SCORE
100
100 Stuart St Boston Ma 02116
Remove closit wall remove wall in bedroom for future mill work relocate electrical.
Date:  May 25, 2011
Value:   $3,500
Contractor: Stephen Danner

Permit type: Demolition - interio | Current use: 7more | Permit id: Sf78609
2011/05/253500100100 Stuart St Boston Ma 02116Stephen Danner
SCORE
100
203 W Springfield St Roxbury Ma 02118
Install rear gutter fix existing roofing seams lead flashing reattach drip pans replace existing alum. Gutter w copper clean all gutters.
Date:  May 25, 2011
Value:   $5,430
Contractor: Stephen Danner

Client: Lawrence Lewis | Permit type: Roofing | Current use: 1-2fam | Permit id: Sf78607 | Parcel: 402554000
2011/05/255430100203 W Springfield St Roxbury Ma 02118Stephen Danner
SCORE
100
77 Worcester St Roxbury Ma 02118
Reseem existing epdm roof (repairs) all details and seems cut and point chemneys at rear of building
Date:  September 1, 2011
Value:   $7,150
Contractor: Stephen Danner

Client: 77 Worcester St Condominium | Permit type: Roofing | Current use: 1-3fam | Permit id: Sf93786 | Parcel: 900563000
2011/09/01715010077 Worcester St Roxbury Ma 02118Stephen Danner
SCORE
100
42 Rutland Sq Roxbury Ma 02118
Renovate bathroom kitchen sheetrock repairs paint and sand floors no exterior work
Date:  September 1, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: Quamina | Permit type: Renovations -interio | Current use: 1-3fam | Permit id: Sf93788 | Parcel: 402700000
2011/09/012500010042 Rutland Sq Roxbury Ma 02118Stephen Danner
SCORE
100
150 Huntington Av Boston Ma 02115
Emergency services due to broken sprinkler pipe
Date:  September 1, 2011
Value:   $20,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Renovations -interio | Current use: 7more | Permit id: Sf93790 | Parcel: 400864000
2011/09/0120000100150 Huntington Av Boston Ma 02115Stephen Danner
SCORE
100
100 Waltham St Roxbury Ma 02118
Relocaye existing gas line and electrical roof feed remove drywall and raplace. Install new empd roofing system reponit rear masonary
Date:  September 7, 2011
Value:   $40,000
Contractor: Stephen Danner

Client: 100 Waltham St Condo Assc | Permit type: Interior/exterior wo | Current use: 1-3fam | Permit id: Sf94537 | Parcel: 306879000
2011/09/0740000100100 Waltham St Roxbury Ma 02118Stephen Danner
SCORE
100
265-275 Dartmouth St Boston Ma 02116
Re-lay newbury st side patio repoint front stairs repoint basement valut
Date:  October 25, 2011
Value:   $25,000
Contractor: Stephen Danner

Permit type: Renovations - exteri | Current use: 7more | Permit id: Sf102630
2011/10/2525000100265-275 Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
4 E Concord St Roxbury Ma 02118
Add storage at front closet remove wall to basement & install hand rail install new oak stair treads
Date:  October 25, 2011
Value:   $2,500
Contractor: Stephen Danner

Client: Jurasic Michael | Permit type: Renovations -interio | Current use: 1-2fam | Permit id: Sf102623 | Parcel: 801388080
2011/10/2525001004 E Concord St Roxbury Ma 02118Stephen Danner
SCORE
100
562 Massachusetts Av Roxbury Ma 02118
Install copper shelf at top floor bay replace 3 windows at same
Date:  November 14, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: Lynch Michael P | Permit type: Renovations - exteri | Current use: 1-4fam | Permit id: Sf105520 | Parcel: 900820006
2011/11/143500100562 Massachusetts Av Roxbury Ma 02118Stephen Danner
SCORE
100
717-719 Atlantic Av Boston Ma 02111
Replace missing gutter install scupper at roof over flow
Date:  November 18, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: 717 Atlantic Ave Condo Assoc | Permit type: Demolition - exterio | Current use: Comm | Permit id: Sf106562 | Parcel: 304310000
2011/11/183500100717-719 Atlantic Av Boston Ma 02111Stephen Danner
SCORE
100
150 Huntington Av Boston Ma 02115
Demo-remove existing library mailroom and front desk. Install new kitchen at libray install new millwork at front desk and libray install new fire alarm control room install new mail boxes. All mep and fire alarm to be permitted by contracted lic sub-contractor - all work to be interior only - not v
Date:  March 16, 2012
Value:   $150,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Interior/exterior wo | Current use: Comm | Permit id: Sf125301 | Parcel: 400864000
2012/03/16150000100150 Huntington Av Boston Ma 02115Stephen Danner
SCORE
100
198-202 Warren Av Roxbury Ma 02118
Replace rear wall sheet rock and ins
Date:  September 12, 2012
Value:   $1,000
Contractor: Stephen Danner

Client: Perroncello-200w J. | Permit type: Renovations -interio | Current use: 1-4fam | Permit id: Sf182853 | Parcel: 400513000
2012/09/121000100198-202 Warren Av Roxbury Ma 02118Stephen Danner
SCORE
100
127-129a Newbury St Boston Ma 02116
Interior demo interior ns framming all new paint refinish existing flooring electrical plumbing and mechanical design duib. Add fire alarm to existing building system.
Date:  December 11, 2012
Value:   $50,000
Contractor: Stephen Danner

Client: Jamestown 127-129 Newbury Lp | Permit type: Renovations -interio | Current use: Mixed | Permit id: Sf207010 | Parcel: 501335000
2012/12/1150000100127-129a Newbury St Boston Ma 02116Stephen Danner
SCORE
100
220 Newbury St Boston Ma 02116
Tenant retail fitup on first floor; all interior non-structural walls plumbing electrical mechanical design build also tenant fire alarm added to existing system.
Date:  December 11, 2012
Value:   $80,000
Contractor: Stephen Danner

Client: Jamestown 220 Newbury Lp | Permit type: Renovations -interio | Current use: Mixed | Permit id: Sf206563 | Parcel: 503223000
2012/12/1180000100220 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
265-275 Dartmouth St Boston Ma 02116
Replace floor joist and sheathing per drawings. Work at 144 newbury st retial per plan
Date:  February 14, 2013
Value:   $20,000
Contractor: Stephen Danner

Permit type: Fast track applicati | Current use: Comm | Permit id: Alt215777
2013/02/1420000100265-275 Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
800 Boylston St Boston Ma 02199
Vineyard vines- install new rear fire rated assembily at common hall strock room. Install outlets as requiried paint and finish
Date:  February 27, 2013
Value:   $10,000
Contractor: Stephen Danner

Client: Bp Prucenter Acquisition Llc | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf223397 | Parcel: 401037100
2013/02/2710000100800 Boylston St Boston Ma 02199Stephen Danner
SCORE
100
220 Newbury St Boston Ma 02116
Six units &; retail - long form #891 2002 sf206563 issued 12 11 2012 coo for retail space - garden level only
Date:  March 4, 2013
Value:   $80,000
Contractor: Stephen Danner

Client: Jamestown 220 Newbury Lp | Permit type: Renovations -interio | Current use: Mixed | Permit id: Coo224001 | Parcel: 503223000
2013/03/0480000100220 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
150 Huntington Av Boston Ma 02115
Remove and replace roof top chiller (no work visable from public way)
Date:  March 12, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Renovations - exteri | Current use: Comm | Permit id: Sf226337 | Parcel: 400864000
2013/03/12100000100150 Huntington Av Boston Ma 02115Stephen Danner
SCORE
100
130 Newbury St Boston Ma 02116
Const interior non-load bearing walls sheetrock painting new flooring electrical (lighting)and millwork install
Date:  May 17, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Rotenberg Jon Trsts | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf245303 | Parcel: 501318000
2013/05/17100000100130 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
62 W Rutland Sq Roxbury Ma 02118
3rd floor apt.-demo replace drywall install cabinets replace bathroom fixtures and install crowne molding and paint
Date:  May 22, 2013
Value:   $9,880
Contractor: Stephen Danner

Client: Greater Boston Properties | Permit type: Renovations -interio | Current use: 1-3fam | Permit id: Sf246513 | Parcel: 402433000
2013/05/22988010062 W Rutland Sq Roxbury Ma 02118Stephen Danner
SCORE
100
33-39 Farnsworth St Boston Ma 02210
Demo exiting non-structual partition walls electrical demo safe
Date:  October 23, 2013
Value:   $19,550
Contractor: Stephen Danner

Client: W2005 Bwh Realt | Permit type: Demolition - interio | Current use: Comm | Permit id: Sf298306 | Parcel: 602660001
2013/10/231955010033-39 Farnsworth St Boston Ma 02210Stephen Danner
SCORE
100
374-382 Congress St Boston Ma 02210
Frame door way at acess to roof install new carpet install new act scrape prime and paint wall walls.
Date:  October 23, 2013
Value:   $21,470
Contractor: Stephen Danner

Client: Ag/nd Fort Poi | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf298302 | Parcel: 602646010
2013/10/2321470100374-382 Congress St Boston Ma 02210Stephen Danner
SCORE
100
374-382 Congress St Boston Ma 02210
Install new structual steel per drawings. Remove existing brick
Date:  January 31, 2014
Value:   $15,000
Contractor: Stephen Danner

Client: Ag/nd Fort Point Llc | Permit type: Demolition - interio | Current use: Comm | Permit id: Alt312287 | Parcel: 602646000
2014/01/3115000100374-382 Congress St Boston Ma 02210Stephen Danner
SCORE
100
332-334 Congress St Boston Ma 02210
Remove all interior non-load walls
Date:  January 31, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: Ag/nd Fort Point Llc | Permit type: Demolition - interio | Current use: Comm | Permit id: Sf323654 | Parcel: 602667000
2014/01/3112000100332-334 Congress St Boston Ma 02210Stephen Danner
SCORE
100
562 Massachusetts Av Roxbury Ma 02118
Add new dormer at rear of building; build roof deck per drawings
Date:  March 6, 2014
Value:   $20,000
Contractor: Stephen Danner

Client: 562 Mass Ave Condo Trust | Permit type: Renovations -interio | Current use: 1-4fam | Permit id: Alt305851 | Parcel: 900820000
2014/03/0620000100562 Massachusetts Av Roxbury Ma 02118Stephen Danner
SCORE
100
66-86 Lincoln St Boston Ma 02111
Demo retail fittup for gym space. Mep design build alt381735 filed for change of use
Date:  July 21, 2014
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Renovations -interio | Current use: Mixed | Permit id: Sf386540 | Parcel: 304304100
2014/07/218500010066-86 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
1 Waltham St Roxbury Ma 02118
Relocaye existing gas line and electrical roof feed remove drywall and raplace. Install new empd roofing system reponit rear masonary
Date:  September 7, 2011
Value:   $40,000
Contractor: Stephen Danner

Permit type: Interior/exterior wo | Permit status: Expired | Current use: 1-3fam | Permit id: Sf94537 | Parcel: 0306879000
2011/09/07400001001 Waltham St Roxbury Ma 02118Stephen Danner
SCORE
100
717 719 Atlantic Av Boston Ma 02111
Replace missing gutter install scupper at roof over flow
Date:  November 18, 2011
Value:   $3,500
Contractor: Stephen Danner

Permit type: Demolition - exterior | Permit status: Expired | Current use: Comm | Permit id: Sf106562 | Parcel: 0304310000
2011/11/183500100717 719 Atlantic Av Boston Ma 02111Stephen Danner
SCORE
100
265 275 Dartmouth St Boston Ma 02116
Re-lay newbury st side patio repoint front stairs repoint basement valut
Date:  October 25, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: Copley Condominium Trust | Permit type: Renovations - exterior | Permit status: Expired | Current use: 7more | Permit id: Sf102630 | Parcel: 0501312000
2011/10/2525000100265 275 Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
172 Dorchester St Boston Ma 02127
Install temp structure for others to complete work. (mason) sister lvls to existing per drawing. Sister clips to front stair way.; pour concrete footings and add cmu per drawing
Date:  July 29, 2010
Value:   $20,000
Contractor: Stephen Danner

Permit type: Interior/exterior wo | Permit status: Expired | Current use: 1-3fam | Permit id: Alt27746 | Parcel: 0701116002
2010/07/2920000100172 Dorchester St Boston Ma 02127Stephen Danner
SCORE
100
172 Dorchester St Boston Ma 02127
Remove existing decking on roof repair epdm roofing install new decking. Install new flooring in front common hallway repair handrails paint. Remove existing walls in rear hallway install new drywall tape mud and sand. Install neww finishes in basement unit. Ie draywall paint lighting and hvac. All mep work to be design build.
Date:  May 28, 2010
Value:   $25,000
Contractor: Stephen Danner

Permit type: Renovations -interio | Permit status: Expired | Current use: 1-3fam | Permit id: Sf27745 | Parcel: 0701116000
2010/05/2825000100172 Dorchester St Boston Ma 02127Stephen Danner
SCORE
100
198 202 Warren Av Roxbury Ma 02118
Replace rear wall sheet rock and ins
Date:  September 12, 2012
Value:   $1,000
Contractor: Stephen Danner

Permit type: Renovations -interio | Permit status: Expired | Current use: 1-4fam | Permit id: Sf182853 | Parcel: 0400513000
2012/09/121000100198 202 Warren Av Roxbury Ma 02118Stephen Danner
SCORE
100
127 129a Newbury St Boston Ma 02116
Interior demo interior ns framming all new paint refinish existing flooring electrical plumbing and mechanical design duib. Add fire alarm to existing building system.
Date:  December 11, 2012
Value:   $50,000
Contractor: Stephen Danner

Client: Jamestown 127-129 Newbury Lp | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Sf207010 | Parcel: 0501335000
2012/12/1150000100127 129a Newbury St Boston Ma 02116Stephen Danner
SCORE
100
265 275 Dartmouth St Boston Ma 02116
Replace floor joist and sheathing per drawings. Work at 144 newbury st retial per plan
Date:  February 14, 2013
Value:   $20,000
Contractor: Stephen Danner

Client: Copley Condominium Trust | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt215777 | Parcel: 0501312000
2013/02/1420000100265 275 Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
33 39 Farnsworth St Boston Ma 02210
Demo exiting non-structual partition walls electrical demo safe
Date:  October 23, 2013
Value:   $19,550
Contractor: Stephen Danner

Client: W2005 Bwh Realt | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf298306 | Parcel: 0602660001
2013/10/231955010033 39 Farnsworth St Boston Ma 02210Stephen Danner
SCORE
100
374 382 Congress St Boston Ma 02210
Frame door way at acess to roof install new carpet install new act scrape prime and paint wall walls.
Date:  October 23, 2013
Value:   $21,470
Contractor: Stephen Danner

Client: Agnd Fort Point Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf298302 | Parcel: 0602646010
2013/10/2321470100374 382 Congress St Boston Ma 02210Stephen Danner
SCORE
100
374 382 Congress St Boston Ma 02210
Install new structual steel per drawings. Remove existing brick
Date:  January 31, 2014
Value:   $15,000
Contractor: Stephen Danner

Client: Agnd Fort Point Llc | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Alt312287 | Parcel: 0602646000
2014/01/3115000100374 382 Congress St Boston Ma 02210Stephen Danner
SCORE
100
332 334 Congress St Boston Ma 02210
Remove all interior non-load walls
Date:  January 31, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: Agnd Fort Point Llc | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf323654 | Parcel: 0602667000
2014/01/3112000100332 334 Congress St Boston Ma 02210Stephen Danner
SCORE
100
97 Forbes St Jamaica Plain Ma 02130
Change closet doors 2nd floor bedrooms remove sections of existing deck rework front entrance masonary stairs
Date:  July 6, 2015
Value:   $2,500
Contractor: Stephen Danner

Permit type: Renovations -interio | Permit status: Open | Current use: 1-2fam | Permit id: Sf491298 | Parcel: 1900144000
2015/07/06250010097 Forbes St Jamaica Plain Ma 02130Stephen Danner
SCORE
100
66 86 Lincoln St Boston Ma 02111
Change use from retail store to gym/assembly use. Renovate.
Date:  October 6, 2015
Value:   $150,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Change occupancy | Permit status: Open | Current use: Comm | Permit id: Alt381735 | Parcel: 0304304100
2015/10/0615000010066 86 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
66 86 Lincoln St Boston Ma 02111
Residential commercial ;retail wireless communication; and assembly gym certificate of occupancy for the ufc gym sf386 7/21/14 &; alt381735 10/6/15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Coo533471 | Parcel: 0304304100
2015/10/098500010066 86 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
66 86 Lincoln St Boston Ma 02111
Residential units temporary certificate of occupancy for the ufc gym.; tco;pending finale inspection on;alt381735 to expire on 2/1/16. Sf386 7/21/14 &; alt381735 10/6/15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Coo437005 | Parcel: 0304304100
2015/10/098500010066 86 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
87 Forbes St Jamaica Plain Ma 02130
Erect one family dwelling on existing lot as per drawings. ;
Date:  November 4, 2015
Value:   $250,000
Contractor: Stephen Danner

Permit type: Erect | Permit status: Open | Current use: 1-2fam | Permit id: Ert516833 | Parcel: 1900143000
2015/11/0425000010087 Forbes St Jamaica Plain Ma 02130Stephen Danner
SCORE
100
66 86 Lincoln St Boston Ma 02111
Demo retail fittup for gym space. Mep design build alt381735 filed for change of use
Date:  July 21, 2014
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Sf386540 | Parcel: 0304304100
2014/07/218500010066 86 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
172 Dorchester St Boston Ma 02127
Rebuild existing roof deck to the drawing supplied by choo &; company
Date:  December 15, 2011
Value:   $12,000
Contractor: Stephen Danner

Permit type: Interior/exterior wo | Permit status: Expired | Current use: 1-3fam | Permit id: A85993 | Parcel: 0701116002
2011/12/1512000100172 Dorchester St Boston Ma 02127Stephen Danner
SCORE
100
66 86 Lincoln St Boston Ma 02111
Change use from retail store to gym/assembly use. Renovate.
Date:  January 29, 2015
Contractor: Stephen Danner

Permit type: Boa zoning | Permit status: Open | Current use: Comm | Permit id: Boa407160 | Parcel: 0304304100
2015/01/29010066 86 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
98 W Concord St Roxbury Ma 02118
Demo existing kitchen install new resessed can lights rewire kitchen refinish floors
Date:  December 30, 2014
Value:   $20,000
Contractor: Stephen Danner

Permit type: Renovations -interio | Permit status: Expired | Current use: 1-3fam | Permit id: Sf438369 | Parcel: 0900604000
2014/12/302000010098 W Concord St Roxbury Ma 02118Stephen Danner
SCORE
100
198 202 Warren Av Boston Ma 02118
Replace rear wall sheet rock and ins
Date:  September 12, 2012
Value:   $1,000
Contractor: Stephen Danner

Client: Perroncello-200w J. | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-4fam | Permit id: Sf182853 | Parcel: 0400513000
2012/09/121000100198 202 Warren Av Boston Ma 02118Stephen Danner
SCORE
100
311315 Belgrade Av Roslindale Ma 02131
Change occupancy from law office;to ;retail (mercantile) with 2 offices and;storage - no work to be done
Date:  January 13, 2017
Contractor: Stephen Danner

Client: Sevigny Paul J | Permit type: Change occupancy | Permit status: Open | Current use: Comm | Permit id: Alt665121 | Parcel: 2001396001
2017/01/130100311315 Belgrade Av Roslindale Ma 02131Stephen Danner
SCORE
100
138 Chandler St Boston Ma 02116
New copper gutter new copper drain pipe new composite slate at rear mansard
Date:  December 16, 2016
Value:   $14,000
Contractor: Stephen Danner

Client: One 38 Chandler St Condo Tr | Permit type: Roofing | Permit status: Open | Current use: 1-2fam | Permit id: Sf666413 | Parcel: 0400035000
2016/12/1614000100138 Chandler St Boston Ma 02116Stephen Danner
SCORE
100
6686 Lincoln St Boston Ma 02111
Residential commercial ;retail wireless communication; and assembly gym certificate of occupancy for the ufc gym sf386 7 21 14 &; alt381735 10 6 15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Coo533471 | Parcel: 0304304100
2015/10/09850001006686 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
51 Gray St Boston Ma 02116
Short form bldg permit
Date:  October 18, 2011
Value:   $7,950
Contractor: Stephen Danner

Client: Kahan Jeffrey | Permit type: Roofing | Permit status: Expired | Current use: 1-2fam | Permit id: Sf101459 | Parcel: 0500884000
2011/10/18795010051 Gray St Boston Ma 02116Stephen Danner
SCORE
100
43 Fort Av Boston Ma 02119
Remove existing roof and replace new replace clap board where rott
Date:  September 30, 2016
Value:   $10,500
Contractor: Stephen Danner

Client: Distant Cherrita | Permit type: Roofing | Permit status: Open | Current use: 1-2fam | Permit id: Sf642807 | Parcel: 1100618000
2016/09/301050010043 Fort Av Boston Ma 02119Stephen Danner
SCORE
100
2 Newbury St Boston Ma 02116
Six units &; retail - long form #891/2002 sf206563 issued 12/11/2012 coo for retail space - garden level only
Date:  March 4, 2013
Value:   $80,000
Contractor: Stephen Danner

Client: Jamestown 2 Newbury Lp | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Coo224001 | Parcel: 0503223000
2013/03/04800001002 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
2 Newbury St Boston Ma 02116
Tenant retail fitup on first floor; all interior non-structural walls plumbing electrical mechanical design build also tenant fire alarm added to existing system.
Date:  December 11, 2012
Value:   $80,000
Contractor: Stephen Danner

Client: Jamestown 2 Newbury Lp | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Sf206563 | Parcel: 0503223000
2012/12/11800001002 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
373375 Border St East Boston Ma 02128
Install; rear porch same size as existing
Date:  October 28, 2016
Value:   $5,000
Contractor: Stephen Danner

Permit type: Interior/exterior work | Permit status: Open | Current use: 1-2fam | Permit id: Sf650421 | Parcel: 0103644000
2016/10/285000100373375 Border St East Boston Ma 02128Stephen Danner
SCORE
100
4 E Concord St Boston Ma 02118
Add storage at front closet remove wall to basement & install hand rail install new oak stair treads
Date:  October 25, 2011
Value:   $2,500
Contractor: Stephen Danner

Client: Jurasic Michael | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf102623 | Parcel: 0801388080
2011/10/2525001004 E Concord St Boston Ma 02118Stephen Danner
SCORE
100
56 Bennett St Brighton Ma 02135
Install new asphalth shingles over existing spot point chimney on driveway side.
Date:  September 1, 2011
Value:   $10,700
Contractor: Stephen Danner

Client: Strauss Adele H | Permit type: Roofing | Current use: 1-2fam | Permit id: Sf93785 | Parcel: 2147483647
2011/09/011070010056 Bennett St Brighton Ma 02135Stephen Danner
SCORE
100
465 Columbus Av Boston Ma 02116
Remove existing drop (act) ceiling at the sales floor. Exposed deck to remain this will expose the horizontal fire separation of precast concrete slab which has a minimum fire rating of 2 hrs. (please see attached letter from architect and table 508. 4 of the ibc) cost reflects on sf350520
Date:  June 27, 2014
Contractor: Stephen Danner

Permit type: Demolition - interior | Current use: Mixed | Permit id: Sf378212
2014/06/270100465 Columbus Av Boston Ma 02116Stephen Danner
SCORE
100
16a16 Grove St Boston Ma 02114
Remove and replace existing epdm roof replace with tapered insulation mechanical fastened fully adhered w . 0 epdm
Date:  August 23, 2016
Value:   $10,500
Contractor: Stephen Danner

Permit type: Roofing | Permit status: Open | Current use: Multi | Permit id: Sf629174
2016/08/231050010016a16 Grove St Boston Ma 02114Stephen Danner
SCORE
100
Dartmouth St Boston Ma 02116
Install new epdm roof fix flashing at building rear (no flashing will change) contact for stephen (781) 726-1373
Date:  April 7, 2010
Value:   $7,200
Contractor: Stephen Danner

Client: Mccabe Joseph V Jr | Permit type: Roofing | Permit status: Expired | Current use: 1unit | Permit id: Sf20888 | Parcel: 0400314000
2010/04/077200100Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
562 Massachusetts Av Boston Ma 02118
Install copper shelf at top floor bay replace 3 windows at same
Date:  November 14, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: Iannessa Elizabeth | Permit type: Renovations - exterior | Permit status: Expired | Current use: 1-4fam | Permit id: Sf105520 | Parcel: 0900820006
2011/11/143500100562 Massachusetts Av Boston Ma 02118Stephen Danner
SCORE
100
173b Norfolk Av Boston Ma 02119
Interior demo and partition framming exterior painting and parking lot repairs
Date:  March 30, 2011
Value:   $25,000
Contractor: Stephen Danner

Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Sf70115 | Parcel: 0800560000
2011/03/3025000100173b Norfolk Av Boston Ma 02119Stephen Danner
SCORE
100
164 W Newton St Boston Ma 02118
Renovate 1st and 2nd stories install interior partition walls. (per drawings) new electrical (design build) new plumbing (design build) install owners finishes. Renovate the existing basement storage and mechanical space to occupiable living space. Note. Drawing gcod and far exception
Date:  February 16, 2010
Value:   $284,186
Contractor: Stephen Danner

Client: One 64 W Newton St Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Alt13651 | Parcel: 0402772000
2010/02/16284186100164 W Newton St Boston Ma 02118Stephen Danner
SCORE
100
98 W Concord St Boston Ma 02118
Swap to locations of closet doors at second floor. Remove walls 1st floor closet
Date:  June 6, 2016
Value:   $10,000
Contractor: Stephen Danner

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-3fam | Permit id: Sf599206
2016/06/061000010098 W Concord St Boston Ma 02118Stephen Danner
SCORE
100
287 Marlborough St Boston Ma 02116
Remove 1st floor ceiling to install treaded rod thought joist patch tape and mud ceiling. Install reinforcements to rear bay
Date:  November 21, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: Two 87 Marlborough St Condo | Permit type: Renovations -interior nsc | Current use: 1-3fam | Permit id: Sf429139 | Parcel: 503434000
2014/11/2112000100287 Marlborough St Boston Ma 02116Stephen Danner
SCORE
100
374382 Congress St Boston Ma 02210
Frame door way at acess to roof install new carpet install new act scrape prime and paint wall walls.
Date:  October 23, 2013
Value:   $21,470
Contractor: Stephen Danner

Client: T-C Fort Point Creative | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf298302 | Parcel: 0602646010
2013/10/2321470100374382 Congress St Boston Ma 02210Stephen Danner
SCORE
100
1 Huntington Av Boston Ma 02115
Emergency services due to broken sprinkler pipe
Date:  September 1, 2011
Value:   $20,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 7more | Permit id: Sf93790 | Parcel: 0400864000
2011/09/01200001001 Huntington Av Boston Ma 02115Stephen Danner
SCORE
100
134 Cushing Av Dorchester Ma 02125
Remove existing epdm roof install . 0 epdm roofing fully adhere all perimeter metal pich pocket at roof pipes and conduit
Date:  June 10, 2010
Value:   $14,400
Contractor: Stephen Danner

Client: One-34 Cushing Av Condo Tr | Permit type: Renovations - exterior | Permit status: Expired | Current use: 1-3fam | Permit id: Sf29425 | Parcel: 1301473000
2010/06/1014400100134 Cushing Av Dorchester Ma 02125Stephen Danner
SCORE
100
265275 Dartmouth St Boston Ma 02116
Replace floor joist and sheathing per drawings. Work at 144 newbury st retial per plan
Date:  February 14, 2013
Value:   $20,000
Contractor: Stephen Danner

Client: Jamestown 265-275 Dartmouth | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt215777 | Parcel: 0501312000
2013/02/1420000100265275 Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
311 Commonwealth Av Boston Ma 02115
Remove esxisting floor kitchen interior doors & molding. Install new kitchen floors paint and plaster. Install new stackable washer and dryer
Date:  December 13, 2011
Value:   $50,000
Contractor: Stephen Danner

Client: Taplin Mary-Ellen | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf110228 | Parcel: 503575035
2011/12/1350000100311 Commonwealth Av Boston Ma 02115Stephen Danner
SCORE
100
177 Newbury St Boston Ma 02116
Retail- mercantile (3); dwelling units c o-for retail- only alt 91681 issued ;8 1 11
Date:  November 14, 2011
Contractor: Stephen Danner

Client: Jamestown 177 Newbury St Lp | Permit status: Expired | Current use: Comm | Permit id: Coo103342 | Parcel: 0501374000
2011/11/140100177 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
465 Columbus Av Boston Ma 02116
Renovate existing convenience store all mep design build
Date:  April 7, 2014
Value:   $50,000
Contractor: Stephen Danner

Permit type: Renovations -interior nsc | Current use: Mixed | Permit id: Sf350520
2014/04/0750000100465 Columbus Av Boston Ma 02116Stephen Danner
SCORE
100
1 Post Office Sq Boston Ma 02109
Install mezzine over bathroom ceiling for storage purposes sprinkler
Date:  June 12, 2013
Value:   $2,500
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: A226340 | Parcel: 304160000
2013/06/1225001001 Post Office Sq Boston Ma 02109Stephen Danner
SCORE
100
6686 Lincoln St Boston Ma 02111
Change use from retail store to gym assembly use. Renovate.
Date:  October 6, 2015
Value:   $150,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Change occupancy | Permit status: Expired | Current use: Comm | Permit id: Alt381735 | Parcel: 0304304100
2015/10/061500001006686 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
164 W Newton St Boston Ma 02118
Add additional lvl to support roof and skylights. Remove rear window and add french door. Submitted: 2 sets stamped engineer plans.
Date:  April 28, 2010
Value:   $25,000
Contractor: Stephen Danner

Client: One 64 W Newton St Condo Tr | Permit type: Interior/exterior work | Permit status: Expired | Current use: 1-2fam | Permit id: Alt18364 | Parcel: 0402772000
2010/04/2825000100164 W Newton St Boston Ma 02118Stephen Danner
SCORE
100
24 Pleasant St Charlestown Ma 02129
Demo interior walls existing rear deck existing kitchen & bathrooms. Revo bathroom install new kitchen new wall framming & new rear deck. All design build mechanical plumbing and electrical
Date:  July 20, 2011
Value:   $80,000
Contractor: Stephen Danner

Client: Martindale Terrance A | Permit type: Interior/exterior work | Current use: 1-2fam | Permit id: Sf86671 | Parcel: 203195000
2011/07/208000010024 Pleasant St Charlestown Ma 02129Stephen Danner
SCORE
100
97 Forbes St Boston Ma 02130
Change closet doors 2nd floor bedrooms remove sections of existing deck rework front entrance masonary stairs
Date:  July 6, 2015
Value:   $2,500
Contractor: Stephen Danner

Client: Bancroft Katharine | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf491298 | Parcel: 1900144000
2015/07/06250010097 Forbes St Boston Ma 02130Stephen Danner
SCORE
100
265275 Dartmouth St Boston Ma 02116
Re-lay newbury st side patio repoint front stairs repoint basement valut
Date:  October 25, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: Copley Condominium Trust | Permit type: Renovations - exterior | Permit status: Expired | Current use: 7more | Permit id: Sf102630 | Parcel: 0501312000
2011/10/2525000100265275 Dartmouth St Boston Ma 02116Stephen Danner
SCORE
100
113 Marlborough St Boston Ma 02116
Single family alt 79292 issued 6 17 2011
Date:  February 2, 2012
Contractor: Stephen Danner

Client: Sunshine Gabriel | Permit status: Expired | Current use: 1-2fam | Permit id: Coo105670 | Parcel: 0502711000
2012/02/020100113 Marlborough St Boston Ma 02116Stephen Danner
SCORE
100
1 Newbury St Boston Ma 02116
Const interior non-load bearing walls sheetrock painting new flooring electrical (lighting)and millwork install
Date:  May 17, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Rotenberg Jon Trsts | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf245303 | Parcel: 0501318000
2013/05/171000001001 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
151 Tremont St Boston Ma 02111
Install new cooling tower at roof top and all assicioated piping and ducting
Date:  January 4, 2013
Value:   $150,000
Contractor: Stephen Danner

Client: Tremont On The Common | Permit type: Renovations -interior nsc | Current use: 1-4fam | Permit id: Sf211623 | Parcel: 304850000
2013/01/04150000100151 Tremont St Boston Ma 02111Stephen Danner
SCORE
100
311 Commonwealth Av Boston Ma 02115
Unit #20-renovate bathroom move closet doorway finish floors add millwork new paint
Date:  March 1, 2011
Value:   $35,000
Contractor: Stephen Danner

Client: Creedon Jennife | Permit type: Renovations -interior nsc | Current use: 7more | Permit id: Sf65788 | Parcel: 503575010
2011/03/0135000100311 Commonwealth Av Boston Ma 02115Stephen Danner
SCORE
100
465 Columbus Av Boston Ma 02116
Prep for new build. Separate shop front.
Date:  June 27, 2014
Value:   $1,000
Contractor: Stephen Danner

Permit type: Renovations -interior nsc | Current use: Mixed | Permit id: Sf378920
2014/06/271000100465 Columbus Av Boston Ma 02116Stephen Danner
SCORE
100
1 Stuart St Boston Ma 02116
Remove closit wall remove wall in bedroom for future mill work relocate electrical.
Date:  May 25, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: One Hundred Stuart St | Permit type: Demolition - interior | Permit status: Expired | Current use: 7more | Permit id: Sf78609
2011/05/2535001001 Stuart St Boston Ma 02116Stephen Danner
SCORE
100
203 W Springfield St Boston Ma 02118
Install rear gutter fix existing roofing seams lead flashing reattach drip pans replace existing alum. Gutter w/ copper clean all gutters.
Date:  May 25, 2011
Value:   $5,430
Contractor: Stephen Danner

Client: Two 03 West Springfield St | Permit type: Roofing | Permit status: Expired | Current use: 1-2fam | Permit id: Sf78607 | Parcel: 0402554000
2011/05/255430100203 W Springfield St Boston Ma 02118Stephen Danner
SCORE
100
6686 Lincoln St Boston Ma 02111
Demo retail fittup for gym space. Mep design build alt381735 filed for change of use
Date:  July 21, 2014
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Sf386540 | Parcel: 0304304100
2014/07/21850001006686 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
179 Newbury St Boston Ma 02116
(1) apt (1) store (2) art galleries c o-for (1); store -only alt 23413 issued 1015 2010 sf 22905 issued 4 23 2011
Date:  April 6, 2011
Contractor: Stephen Danner

Client: Jamestown 179 Newbury St Lp | Permit status: Expired | Current use: Comm | Permit id: Coo65807 | Parcel: 0501375000
2011/04/060100179 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
332334 Congress St Boston Ma 02210
Remove all interior non-load walls
Date:  January 31, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: T-C Fort Point Creative | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf323654 | Parcel: 0602667000
2014/01/3112000100332334 Congress St Boston Ma 02210Stephen Danner
SCORE
100
177 Newbury St Boston Ma 02116
Renovations to the basement and first floor of an existing mercantile space that will remain mercantile. Renovations will include fixtures and finishes. No exterior renovations. Re-work sprinkler system line.
Date:  September 12, 2011
Value:   $200,000
Contractor: Stephen Danner

Client: Jamestown 177 Newbury St Lp | Permit type: Fast track application | Current use: Comm | Permit id: Alt91681 | Parcel: 501374000
2011/09/12200000100177 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
42 Rutland Sq Boston Ma 02118
Renovate bathroom kitchen sheetrock repairs paint and sand floors no exterior work
Date:  September 1, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: Quamina Benjamin Andre | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-3fam | Permit id: Sf93788 | Parcel: 0402700000
2011/09/012500010042 Rutland Sq Boston Ma 02118Stephen Danner
SCORE
100
179 Newbury St Boston Ma 02116
(1) apt (1) store (2) art galleries c o-for (1); store-only alt 23413 issued 10 15 10 sf 22905 issued 4 23 10 1st. Temporary certificate-expires - 1 21 2011- 2nd temp. Cert expires 2 21 11 -pending completion of permit
Date:  October 25, 2010
Contractor: Stephen Danner

Client: Jamestown 179 Newbury St Lp | Permit status: Expired | Current use: Comm | Permit id: Coo48205 | Parcel: 0501375000
2010/10/250100179 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
69 Montgomery St Boston Ma 02116
Exterior repairs maintance replace side gutter
Date:  November 18, 2011
Value:   $5,800
Contractor: Stephen Danner

Client: Lee Wong J.&s. | Permit type: Demolition - exterior | Permit status: Expired | Current use: 1-2fam | Permit id: Sf105525 | Parcel: 0400323000
2011/11/18580010069 Montgomery St Boston Ma 02116Stephen Danner
SCORE
100
98 W Concord St Boston Ma 02118
Demo existing kitchen install new resessed can lights rewire kitchen refinish floors
Date:  December 30, 2014
Value:   $20,000
Contractor: Stephen Danner

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-3fam | Permit id: Sf438369 | Parcel: 0900604000
2014/12/302000010098 W Concord St Boston Ma 02118Stephen Danner
SCORE
100
373375 Border St East Boston Ma 02128
Demo interior (non-load bearing walls) relocate kitchen location renovate bathroom (basement 1st floor top floor) remove existing window and install new doors (to outside)
Date:  June 27, 2016
Value:   $10,000
Contractor: Stephen Danner

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf604917 | Parcel: 0103644000
2016/06/2710000100373375 Border St East Boston Ma 02128Stephen Danner
SCORE
100
6686 Lincoln St Boston Ma 02111
Residential units temporary certificate of occupancy for the ufc gym.; tco;pending finale inspection on;alt381735 to expire on 2 1 16. Sf386 7 21 14 &; alt381735 10 6 15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Coo437005 | Parcel: 0304304100
2015/10/09850001006686 Lincoln St Boston Ma 02111Stephen Danner
SCORE
100
77 Worcester St Boston Ma 02118
Reseem existing epdm roof (repairs) all details and seems cut and point chemneys at rear of building
Date:  September 1, 2011
Value:   $7,150
Contractor: Stephen Danner

Client: Seventy7 Worcester Street | Permit type: Roofing | Permit status: Expired | Current use: 1-3fam | Permit id: Sf93786 | Parcel: 0900563000
2011/09/01715010077 Worcester St Boston Ma 02118Stephen Danner
SCORE
100
1 Post Office Sq Boston Ma 02109
Remove all interior partition walls strip sheetrock at preimeter walls & ceilings to studs remove existing flooring to slab remove existing lighting (panel to remain)remove existing plumbing fixtures. Heating fire alarm systems to remain.
Date:  February 10, 2012
Value:   $30,000
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Demolition - interior | Current use: Comm | Permit id: Sf118942 | Parcel: 304160000
2012/02/10300001001 Post Office Sq Boston Ma 02109Stephen Danner
SCORE
100
Beacon St Boston Ma 02108
Install new epdm roof install matching copper gutter at building rear tie in existing slate to gutter at building rear ; contact stephen (781)726-1373
Date:  April 7, 2010
Value:   $4,000
Contractor: Stephen Danner

Client: Ninety Beacon St Condo Assn | Permit type: Roofing | Permit status: Expired | Current use: Multi | Permit id: Sf20886 | Parcel: 0502553000
2010/04/074000100Beacon St Boston Ma 02108Stephen Danner
SCORE
100
198202 Warren Av Boston Ma 02118
Replace rear wall sheet rock and ins
Date:  September 12, 2012
Value:   $1,000
Contractor: Stephen Danner

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-4fam | Permit id: Sf182853 | Parcel: 0400513000
2012/09/121000100198202 Warren Av Boston Ma 02118Stephen Danner
SCORE
100
172 Dorchester St South Boston Ma 02127
Remove existing decking on roof repair epdm roofing install new decking. Install new flooring in front common hallway repair handrails paint. Remove existing walls in rear hallway install new drywall tape mud and sand. Install neww finishes in basement unit. Ie draywall paint lighting and hvac. All mep work to be design build.
Date:  May 28, 2010
Value:   $25,000
Contractor: Stephen Danner

Client: 172 Dorchester St Condominium | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-3fam | Permit id: Sf27745 | Parcel: 0701116000
2010/05/2825000100172 Dorchester St South Boston Ma 02127Stephen Danner
SCORE
100
127129a Newbury St Boston Ma 02116
Interior demo interior ns framming all new paint refinish existing flooring electrical plumbing and mechanical design duib. Add fire alarm to existing building system.
Date:  December 11, 2012
Value:   $50,000
Contractor: Stephen Danner

Client: Jamestown 127-129 Newbury St | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Mixed | Permit id: Sf207010 | Parcel: 0501335000
2012/12/1150000100127129a Newbury St Boston Ma 02116Stephen Danner
SCORE
100
562 Massachusetts Av Boston Ma 02118
Add new dormer at rear of building; build roof deck per drawings
Date:  March 6, 2014
Value:   $20,000
Contractor: Stephen Danner

Client: Five 62 Mass Av Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-4fam | Permit id: Alt305851 | Parcel: 0900820000
2014/03/0620000100562 Massachusetts Av Boston Ma 02118Stephen Danner
SCORE
100
179 Newbury St Boston Ma 02116
Change use on building to non-separated mixed use. Change basement first and second floor to use group m. Change third floor to use group b. Existing use basement-m first and second a-3 and r-3 third floor. Added new stairs from basement to first floor land lord to framming opening under separate permit. Change store front to the specification supplied in the drawings. (application in with land marks). Add additional structural work as per drawings;fire rated stair enclosure and ada compliant lift. Mep fa and fp.
Date:  October 15, 2010
Value:   $17,000
Contractor: Stephen Danner

Client: Jamestown 179 Newbury St Lp | Permit type: Change occupancy | Permit status: Expired | Current use: Comm | Permit id: Alt23413 | Parcel: 0501375000
2010/10/1517000100179 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
234 Clarendon St Boston Ma 02116
Remove walls and rework ceiling on the third and fourth floors only
Date:  October 25, 2010
Value:   $3,000
Contractor: Stephen Danner

Client: Jamestown 234-236 Clarendon St | Permit type: Demolition - interior | Current use: Comm | Permit id: Sf48526 | Parcel: 501359000
2010/10/253000100234 Clarendon St Boston Ma 02116Stephen Danner
SCORE
100
3339 Farnsworth St Boston Ma 02210
Demo exiting non-structual partition walls electrical demo safe
Date:  October 23, 2013
Value:   $19,550
Contractor: Stephen Danner

Client: Cfs Seaport Llc | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf298306 | Parcel: 0602660001
2013/10/23195501003339 Farnsworth St Boston Ma 02210Stephen Danner
SCORE
100
374382 Congress St Boston Ma 02210
Install new structual steel per drawings. Remove existing brick
Date:  January 31, 2014
Value:   $15,000
Contractor: Stephen Danner

Client: T-C Fort Point Creative | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Alt312287 | Parcel: 0602646010
2014/01/3115000100374382 Congress St Boston Ma 02210Stephen Danner
SCORE
100
164 W Newton St Boston Ma 02118
Interior framming drywall bathroom renovation and kitchen install. Plumbing mechanical and electrical.
Date:  February 25, 2010
Value:   $50,000
Contractor: Stephen Danner

Client: One 64 W Newton St Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf16148 | Parcel: 0402772000
2010/02/2550000100164 W Newton St Boston Ma 02118Stephen Danner
SCORE
100
8 Sorrento St Allston Ma 02134
Remove existing asphalt roof install ne water barrier at roof edge new drip edge relpace damaged boards install new architectural shingles
Date:  June 1, 2010
Value:   $6,200
Contractor: Stephen Danner

Client: Barbato Charles A Ts | Permit type: Renovations - exterior | Current use: 1-2fam | Permit id: Sf28004 | Parcel: 2147483647
2010/06/0162001008 Sorrento St Allston Ma 02134Stephen Danner
SCORE
100
191 Commonwealth Av Boston Ma 02116
Demo per plan. Add bathroom per plan renovate both existing bathrooms per plan. Update kitchen per plan. Add closit in bedrooms as per plan.
Date:  January 7, 2010
Value:   $80,000
Contractor: Stephen Danner

Client: Wellman Bradfor | Permit type: Renovations -interior nsc | Current use: 7more | Permit id: Sf10257 | Parcel: 502952018
2010/01/0780000100191 Commonwealth Av Boston Ma 02116Stephen Danner
SCORE
100
24 Brimmer St Boston Ma 02108
Install new epdm roof new copper trim to match existing new gutters to match existing prime and paint front bay.
Date:  May 28, 2010
Value:   $6,000
Contractor: Stephen Danner

Client: Carroll Harold J | Permit type: Renovations - exterior | Current use: 1-2fam | Permit id: Sf27748 | Parcel: 502422000
2010/05/28600010024 Brimmer St Boston Ma 02108Stephen Danner
SCORE
100
87 Forbes St Boston Ma 02130
Amendment to revise ert516833 (mj) to the changes represented in the drawings based off the revision by the bra "ndod" (these drawings to replace ert616833)
Date:  July 8, 2016
Contractor: Stephen Danner

Permit type: Other | Permit status: Expired | Current use: 1-2fam | Permit id: A599548 | Parcel: 1900143000
2016/07/08010087 Forbes St Boston Ma 02130Stephen Danner
SCORE
100
1 Huntington Av Boston Ma 02115
Remove and replace roof top chiller (no work visable from public way)
Date:  March 12, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Renovations - exterior | Permit status: Expired | Current use: Comm | Permit id: Sf226337 | Parcel: 0400864000
2013/03/121000001001 Huntington Av Boston Ma 02115Stephen Danner
SCORE
100
172 Newbury St Boston Ma 02116
Rework existing fire alarm system
Date:  April 18, 2013
Value:   $5,000
Contractor: Stephen Danner

Client: Jamestown 172 Newbury St Lp | Permit type: Fire alarm | Current use: Comm | Permit id: Efa236493 | Parcel: 501402000
2013/04/185000100172 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
8 Boylston St Boston Ma 02199
Vineyard vines- install new rear fire rated assembily at common hall/strock room. Install outlets as requiried paint and finish
Date:  February 27, 2013
Value:   $10,000
Contractor: Stephen Danner

Client: Bp Prucenter Acquisition Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf223397 | Parcel: 0401037100
2013/02/27100001008 Boylston St Boston Ma 02199Stephen Danner
SCORE
100
107 Saint Botolph St Boston Ma 02115
Finish 2 bathrooms paint all walls refinish floors design build electrical and mechanical. Install new indows
Date:  January 4, 2013
Value:   $30,000
Contractor: Stephen Danner

Client: 107 St Botolph St Condo | Permit type: Renovations -interior nsc | Current use: 1-3fam | Permit id: Sf211620 | Parcel: 400883000
2013/01/0430000100107 Saint Botolph St Boston Ma 02115Stephen Danner
SCORE
100
62 W Rutland Sq Boston Ma 02118
3rd floor apt.-demo replace drywall install cabinets replace bathroom fixtures and install crowne molding and paint
Date:  May 22, 2013
Value:   $9,880
Contractor: Stephen Danner

Client: Greater Boston Properties | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-3fam | Permit id: Sf246513 | Parcel: 0402433000
2013/05/22988010062 W Rutland Sq Boston Ma 02118Stephen Danner
SCORE
100
1 Waltham St Boston Ma 02118
Relocaye existing gas line and electrical roof feed remove drywall and raplace. Install new empd roofing system reponit rear masonary
Date:  September 7, 2011
Value:   $40,000
Contractor: Stephen Danner

Client: One Hundred Waltham Street | Permit type: Interior/exterior work | Permit status: Expired | Current use: 1-3fam | Permit id: Sf94537 | Parcel: 0306879000
2011/09/07400001001 Waltham St Boston Ma 02118Stephen Danner
SCORE
100
113 Marlborough St Boston Ma 02116
Remove existing masonry wall between 113 and 115 instal fire rated door opeaning per the drawings remove interior walls at 113 and 115. Construct new interior partition walls fire rated corridor tape mud and paint limts of work 4th floor.
Date:  June 17, 2011
Value:   $50,000
Contractor: Stephen Danner

Client: Sunshine Gabriel | Permit type: Renovations -interior nsc | Current use: 1-2fam | Permit id: Alt79292 | Parcel: 502711000
2011/06/1750000100113 Marlborough St Boston Ma 02116Stephen Danner
SCORE
100
172 Newbury St Boston Ma 02116
Office retail &; accessory garage hair slon day spa and accessory massage c o-for retail-;1st. Fl. - ;only; alt 213966 issued 1 22 2012 ;
Date:  April 23, 2013
Value:   $95,000
Contractor: Stephen Danner

Client: Jamestown 172 Newbury St Lp | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo235127 | Parcel: 0501402000
2013/04/2395000100172 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
717719 Atlantic Av Boston Ma 02111
Replace missing gutter install scupper at roof over flow
Date:  November 18, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: Seven 17 Atlantic Avenue | Permit type: Demolition - exterior | Permit status: Expired | Current use: Comm | Permit id: Sf106562 | Parcel: 0304310000
2011/11/183500100717719 Atlantic Av Boston Ma 02111Stephen Danner
SCORE
100
1 Post Office Sq Boston Ma 02109
Legal occupancy:; offices stores bank garage car rental barbershop &; restaurant coo for the 1st floor restaurant (tossed) alt120837; issued: 6 18 2012 &; a226340 issued:;6 12 13;&; alt227420 issued: 3 15 2013
Date:  June 27, 2013
Value:   $542,300
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Coo255102 | Parcel: 0304160000
2013/06/275423001001 Post Office Sq Boston Ma 02109Stephen Danner
SCORE
100
1 Huntington Av Boston Ma 02115
Demo-remove existing library mailroom and front desk. Install new kitchen at libray install new millwork at front desk and libray install new fire alarm control room install new mail boxes. All mep and fire alarm to be permitted by contracted/lic sub-contractor - all work to be interior only - not visible from a public view - fire permit to be secured by afa
Date:  March 16, 2012
Value:   $150,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Sf125301 | Parcel: 0400864000
2012/03/161500001001 Huntington Av Boston Ma 02115Stephen Danner
SCORE
100
179 Newbury St Boston Ma 02116
Demo existing walls per drawing. Construct new walls per drawings. Install new plubing haeting and electrical system per the drawings. Any structural work show on drawings will be applied for under seprate long form permit.
Date:  April 23, 2010
Value:   $146,000
Contractor: Stephen Danner

Client: Jamestown 179 Newbury St Lp | Permit type: Renovations -interior nsc | Current use: Mixed | Permit id: Sf22905 | Parcel: 501375000
2010/04/23146000100179 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
1 Stuart St Boston Ma 02116
23rdfl;unit c and d;interior renovations to these two units
Date:  January 31, 2011
Value:   $42,500
Contractor: Stephen Danner

Client: One Hundred Stuart St | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf62299
2011/01/31425001001 Stuart St Boston Ma 02116Stephen Danner
SCORE
100
1 Post Office Sq Boston Ma 02109
Offices stores bank garage car rental barbershop alt120837 issued 6/18/2012 &; a226340;(pending);occupany being corrected on alt2274 issued 3/15/2013 temp coo for restaurant (1st. Floor) only;(excluding mezzanine);- pending issuance of a2263 - to expire in days on 4/25/2013- second ext. -expires - 5/25/2013- third extension - expires; days 6/17/2013 pending completion
Date:  March 19, 2013
Value:   $329,000
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Coo227278 | Parcel: 0304160000
2013/03/193290001001 Post Office Sq Boston Ma 02109Stephen Danner
SCORE
100
1 Post Office Sq Boston Ma 02109
Change occupancy from offices stores bank garage car rental and barber shop to:;offices stores bank garage car rental and barber shop and restaurant #37 - ;(building out work completed under alt120837)
Date:  March 15, 2013
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Change occupancy | Current use: Comm | Permit id: Alt227420 | Parcel: 304160000
2013/03/1501001 Post Office Sq Boston Ma 02109Stephen Danner
SCORE
100
172 Dorchester St South Boston Ma 02127
Install temp structure for others to complete work. (mason) sister lvls to existing per drawing. Sister clips to front stair way.; pour concrete footings and add cmu per drawing
Date:  July 29, 2010
Value:   $20,000
Contractor: Stephen Danner

Client: Harrison Matthew | Permit type: Interior/exterior work | Current use: 1-3fam | Permit id: Alt27746 | Parcel: 701116002
2010/07/2920000100172 Dorchester St South Boston Ma 02127Stephen Danner
SCORE
100
91 Newbury St Boston Ma 02116
Install no load bearing walls install clothing fixtures paint refinish floor install fire alarm and life and safety equipment.
Date:  July 23, 2012
Value:   $30,000
Contractor: Stephen Danner

Client: Ta 85-91 Newbury St Limited Prtnsp | Permit type: Renovations -interior nsc | Current use: Mixed | Permit id: Sf147684 | Parcel: 501289000
2012/07/233000010091 Newbury St Boston Ma 02116Stephen Danner
SCORE
100
87 Forbes St Boston Ma 02130
Erect one family dwelling on existing lot as per drawings. ;
Date:  November 4, 2015
Value:   $250,000
Contractor: Stephen Danner

Client: Bancroft Kathar | Permit type: Erect | Permit status: Open | Current use: 1-2fam | Permit id: Ert516833 | Parcel: 1900143000
2015/11/0425000010087 Forbes St Boston Ma 02130Stephen Danner
SCORE
100
445 Marlborough St Boston Ma 02115
Demo per drawings new wall construction per drawings relocate bathrooms per drawings new hardwood flooring paint (all work to be completed per the drawings) no exterior work with this application.
Date:  May 30, 2012
Value:   $75,000
Contractor: Stephen Danner

Client: 445 Marlborough St Llc | Permit type: Interior/exterior work | Current use: 1-2fam | Permit id: Alt133451 | Parcel: 503863000
2012/05/3075000100445 Marlborough St Boston Ma 02115Stephen Danner
SCORE
100
179 Newbury St Boston Ma
(1) apt (1) store (2) art galleries c/o-for (1); store-only alt 23413 issued 10/15/ sf 22905 issued 4/23/ 1st. Temporary certificate-expires - 1/21/2011- 2nd temp. Cert expires 2/21/11 -pending completion of permit
Date:  October 25, 2010
Contractor: Stephen Danner

Client: Jamestown 179 Newbury St Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo48205 | Parcel: 0501375000
2010/10/250100179 Newbury St Boston MaStephen Danner
SCORE
100
Date:  August 17, 2010
Value:   $11,250
Contractor: Stephen Danner

Parcel: 53008 0001
2010/08/171125010072 Ferncroft Rd Newton MaStephen Danner
SCORE
100
4 E Concord St Boston Ma
Add storage at front closet remove wall to basement & install hand rail install new oak stair treads
Date:  October 25, 2011
Value:   $2,500
Contractor: Stephen Danner

Client: Jurasic Michael | Permit type: Short form bldg permit | Expiration date: April 25, 2012 | Current use: 1-2fam | Permit id: Sf102623 | Parcel: 0801388080
2011/10/2525001004 E Concord St Boston MaStephen Danner
SCORE
100
66 86 Lincoln St Boston Ma
Demo retail fittup for gym space. Mep design build alt381735 filed for change of use
Date:  July 21, 2014
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Short form bldg permit | Expiration date: January 21, 2015 | Current use: Mixed | Permit id: Sf386540 | Parcel: 0304304100
2014/07/218500010066 86 Lincoln St Boston MaStephen Danner
SCORE
100
562 Massachusetts Av Boston Ma
Install copper shelf at top floor bay replace 3 windows at same
Date:  November 14, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: Lynch Michael P | Permit type: Short form bldg permit | Expiration date: May 14, 2012 | Current use: 1-4fam | Permit id: Sf105520 | Parcel: 0900820006
2011/11/143500100562 Massachusetts Av Boston MaStephen Danner
SCORE
100
113 Marlborough St Boston Ma
Remove existing masonry wall between 113 and 115 instal fire rated door opeaning per the drawings remove interior walls at 113 and 115. Construct new interior partition walls fire rated corridor tape mud and paint limts of work 4th floor.
Date:  June 17, 2011
Value:   $50,000
Contractor: Stephen Danner

Client: Sunshine Gabriel | Permit type: Long form/alteration permit | Expiration date: December 17, 2011 | Current use: 1-2fam | Permit id: Alt79292 | Parcel: 0502711000
2011/06/1750000100113 Marlborough St Boston MaStephen Danner
SCORE
100
24 Pleasant St Charlestown Ma
Demo interior walls existing rear deck existing kitchen & bathrooms. Revo bathroom install new kitchen new wall framming & new rear deck. All design build mechanical plumbing and electrical
Date:  July 20, 2011
Value:   $80,000
Contractor: Stephen Danner

Client: Mccormick Margaret | Permit type: Short form bldg permit | Expiration date: January 20, 2012 | Current use: 1-2fam | Permit id: Sf86671 | Parcel: 0203195000
2011/07/208000010024 Pleasant St Charlestown MaStephen Danner
SCORE
100
172 Newbury St Boston Ma
Rework existing fire alarm system
Date:  April 18, 2013
Value:   $5,000
Contractor: Stephen Danner

Client: Jamestown 172 Newbury Lp | Permit type: Electrical fire alarms | Expiration date: October 18, 2013 | Current use: Comm | Permit id: Efa236493 | Parcel: 0501402000
2013/04/185000100172 Newbury St Boston MaStephen Danner
SCORE
100
203 W Springfield St Boston Ma
Install rear gutter fix existing roofing seams lead flashing reattach drip pans replace existing alum. Gutter w/ copper clean all gutters.
Date:  May 25, 2011
Value:   $5,430
Contractor: Stephen Danner

Client: Lawrence Lewis | Permit type: Short form bldg permit | Expiration date: November 25, 2011 | Current use: 1-2fam | Permit id: Sf78607 | Parcel: 0402554000
2011/05/255430100203 W Springfield St Boston MaStephen Danner
SCORE
100
179 Newbury St Boston Ma
(1) apt (1) store (2) art galleries c/o-for (1); store -only alt 23413 issued 1015/20 sf 22905 issued 4/23/2011
Date:  April 6, 2011
Contractor: Stephen Danner

Client: Jamestown 179 Newbury Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo65807 | Parcel: 0501375000
2011/04/060100179 Newbury St Boston MaStephen Danner
SCORE
100
66 86 Lincoln St Boston Ma
Residential commercial ;retail wireless communication; and assembly gym certificate of occupancy for the ufc gym sf386 7/21/14 &; alt381735 10/6/15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo533471 | Parcel: 0304304100
2015/10/098500010066 86 Lincoln St Boston MaStephen Danner
SCORE
100
87 Forbes St Boston Ma
Erect one family dwelling on existing lot as per drawings. ;
Date:  November 4, 2015
Value:   $250,000
Contractor: Stephen Danner

Client: Bancroft Kathar | Permit type: Erect/new construction | Expiration date: May 4, 2016 | Current use: 1-2fam | Permit id: Ert516833 | Parcel: 1900143000
2015/11/0425000010087 Forbes St Boston MaStephen Danner
SCORE
100
374 382 Congress St Boston Ma
Frame door way at acess to roof install new carpet install new act scrape prime and paint wall walls.
Date:  October 23, 2013
Value:   $21,470
Contractor: Stephen Danner

Client: Agnd Fort Poi | Permit type: Short form bldg permit | Expiration date: April 23, 2014 | Current use: Comm | Permit id: Sf298302 | Parcel: 0602646010
2013/10/2321470100374 382 Congress St Boston MaStephen Danner
SCORE
100
374 382 Congress St Boston Ma
Install new structual steel per drawings. Remove existing brick
Date:  January 31, 2014
Value:   $15,000
Contractor: Stephen Danner

Client: Agnd Fort Poi | Permit type: Long form/alteration permit | Expiration date: July 31, 2014 | Current use: Comm | Permit id: Alt312287 | Parcel: 0602646010
2014/01/3115000100374 382 Congress St Boston MaStephen Danner
SCORE
100
97 Forbes St Boston Ma
Change closet doors 2nd floor bedrooms remove sections of existing deck rework front entrance masonary stairs
Date:  July 6, 2015
Value:   $2,500
Contractor: Stephen Danner

Client: Bancroft Katharine | Permit type: Short form bldg permit | Expiration date: January 6, 2016 | Current use: 1-2fam | Permit id: Sf491298 | Parcel: 1900144000
2015/07/06250010097 Forbes St Boston MaStephen Danner
SCORE
100
445 Marlborough St Boston Ma
Demo per drawings new wall construction per drawings relocate bathrooms per drawings new hardwood flooring paint (all work to be completed per the drawings) no exterior work with this application.
Date:  May 30, 2012
Value:   $75,000
Contractor: Stephen Danner

Permit type: Long form/alteration permit | Expiration date: November 30, 2012 | Current use: 1-2fam | Permit id: Alt133451 | Parcel: 0503863000
2012/05/3075000100445 Marlborough St Boston MaStephen Danner
SCORE
100
69 Montgomery St Boston Ma
Exterior repairs/maintance replace side gutter
Date:  November 18, 2011
Value:   $5,800
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: May 18, 2012 | Current use: 1-2fam | Permit id: Sf105525 | Parcel: 0400323000
2011/11/18580010069 Montgomery St Boston MaStephen Danner
SCORE
100
127 129a Newbury St Boston Ma
Interior demo interior ns framming all new paint refinish existing flooring electrical plumbing and mechanical design duib. Add fire alarm to existing building system.
Date:  December 11, 2012
Value:   $50,000
Contractor: Stephen Danner

Client: Jamestown 127-129 Newbury Lp | Permit type: Short form bldg permit | Expiration date: June 11, 2013 | Current use: Mixed | Permit id: Sf207010 | Parcel: 0501335000
2012/12/1150000100127 129a Newbury St Boston MaStephen Danner
SCORE
100
1 Stuart St Boston Ma
Remove closit wall remove wall in bedroom for future mill work relocate electrical.
Date:  May 25, 2011
Value:   $3,500
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: November 25, 2011 | Current use: 7more | Permit id: Sf78609
2011/05/2535001001 Stuart St Boston MaStephen Danner
SCORE
100
465 Columbus Av Boston Ma
Renovate existing convenience store all mep design build
Date:  April 7, 2014
Value:   $50,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: October 7, 2014 | Current use: Mixed | Permit id: Sf350520
2014/04/0750000100465 Columbus Av Boston MaStephen Danner
SCORE
100
2 Newbury St Boston Ma
Six units &; retail - long form #891/2002 sf206563 issued 12/11/2012 coo for retail space - garden level only
Date:  March 4, 2013
Value:   $80,000
Contractor: Stephen Danner

Client: Jamestown 2 Newbury Lp | Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo224001 | Parcel: 0503223000
2013/03/04800001002 Newbury St Boston MaStephen Danner
SCORE
100
1 Stuart St Boston Ma
23rdfl;unit c and d;interior renovations to these two units
Date:  January 31, 2011
Value:   $42,500
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: July 31, 2011 | Current use: Comm | Permit id: Sf62299
2011/01/31425001001 Stuart St Boston MaStephen Danner
SCORE
100
717 719 Atlantic Av Boston Ma
Replace missing gutter install scupper at roof over flow
Date:  November 18, 2011
Value:   $3,500
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: May 18, 2012 | Current use: Comm | Permit id: Sf106562 | Parcel: 0304310000
2011/11/183500100717 719 Atlantic Av Boston MaStephen Danner
SCORE
100
311 Commonwealth Av Boston Ma
Remove esxisting floor kitchen interior doors & molding. Install new kitchen floors paint and plaster. Install new stackable washer and dryer
Date:  December 13, 2011
Value:   $50,000
Contractor: Stephen Danner

Client: Ress Reuben Eta | Permit type: Short form bldg permit | Expiration date: June 13, 2012 | Current use: Comm | Permit id: Sf110228 | Parcel: 0503575035
2011/12/1350000100311 Commonwealth Av Boston MaStephen Danner
SCORE
100
151 Tremont St Boston Ma
Install new cooling tower at roof top and all assicioated piping and ducting
Date:  January 4, 2013
Value:   $150,000
Contractor: Stephen Danner

Client: Tremont On The | Permit type: Short form bldg permit | Expiration date: July 4, 2013 | Current use: 1-4fam | Permit id: Sf211623 | Parcel: 0304850000
2013/01/04150000100151 Tremont St Boston MaStephen Danner
SCORE
100
62 W Rutland Sq Boston Ma
3rd floor apt.-demo replace drywall install cabinets replace bathroom fixtures and install crowne molding and paint
Date:  May 22, 2013
Value:   $9,880
Contractor: Stephen Danner

Client: Greater Boston Properties | Permit type: Short form bldg permit | Expiration date: November 22, 2013 | Current use: 1-3fam | Permit id: Sf246513 | Parcel: 0402433000
2013/05/22988010062 W Rutland Sq Boston MaStephen Danner
SCORE
100
1 Newbury St Boston Ma
Const interior non-load bearing walls sheetrock painting new flooring electrical (lighting)and millwork install
Date:  May 17, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Rotenberg Jon Trsts | Permit type: Short form bldg permit | Expiration date: November 17, 2013 | Current use: Comm | Permit id: Sf245303 | Parcel: 0501318000
2013/05/171000001001 Newbury St Boston MaStephen Danner
SCORE
100
562 Massachusetts Av Boston Ma
Add new dormer at rear of building; build roof deck per drawings
Date:  March 6, 2014
Value:   $20,000
Contractor: Stephen Danner

Permit type: Long form/alteration permit | Expiration date: September 6, 2014 | Current use: 1-4fam | Permit id: Alt305851 | Parcel: 0900820000
2014/03/0620000100562 Massachusetts Av Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Change occupancy from offices stores bank garage car rental and barber shop to:;offices stores bank garage car rental and barber shop and restaurant #37 - ;(building out work completed under alt120837)
Date:  March 15, 2013
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Long form/alteration permit | Expiration date: September 15, 2013 | Current use: Comm | Permit id: Alt227420 | Parcel: 0304160000
2013/03/1501001 Post Office Sq Boston MaStephen Danner
SCORE
100
51 Gray St Boston Ma
New epdm roof
Date:  October 18, 2011
Value:   $7,950
Contractor: Stephen Danner

Client: Kahan Jeffrey | Permit type: Short form bldg permit | Expiration date: April 18, 2012 | Current use: 1-2fam | Permit id: Sf101459 | Parcel: 0500884000
2011/10/18795010051 Gray St Boston MaStephen Danner
SCORE
100
465 Columbus Av Boston Ma
Remove existing drop (act) ceiling at the sales floor. Exposed deck to remain this will expose the horizontal fire separation of precast concrete slab which has a minimum fire rating of 2 hrs. (please see attached letter from architect and table 508. 4 of the ibc) cost reflects on sf350520
Date:  June 27, 2014
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: December 27, 2014 | Current use: Mixed | Permit id: Sf378212
2014/06/270100465 Columbus Av Boston MaStephen Danner
SCORE
100
173b Norfolk Av Boston Ma
Interior demo and partition framming exterior painting and parking lot repairs
Date:  March 30, 2011
Value:   $25,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: September 30, 2011 | Current use: Comm | Permit id: Sf70115 | Parcel: 0800560000
2011/03/3025000100173b Norfolk Av Boston MaStephen Danner
SCORE
100
172 Dorchester St South Boston Ma
Rebuild existing roof deck to the drawing supplied by choo &; company
Date:  December 15, 2011
Value:   $12,000
Contractor: Stephen Danner

Client: Mcelaney Daniel | Permit type: Amendment to a long form | Expiration date: June 15, 2012 | Current use: 1-3fam | Permit id: A85993 | Parcel: 0701116002
2011/12/1512000100172 Dorchester St South Boston MaStephen Danner
SCORE
100
66 86 Lincoln St Boston Ma
Change use from retail store to gym/assembly use. Renovate.
Date:  January 29, 2015
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Board of appeals | Expiration date: January 29, 2017 | Current use: Comm | Permit id: Boa407160 | Parcel: 0304304100
2015/01/29010066 86 Lincoln St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Remove all interior partition walls strip sheetrock at preimeter walls & ceilings to studs remove existing flooring to slab remove existing lighting (panel to remain)remove existing plumbing fixtures. Heating fire alarm systems to remain.
Date:  February 10, 2012
Value:   $30,000
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Short form bldg permit | Expiration date: August 10, 2012 | Current use: Comm | Permit id: Sf118942 | Parcel: 0304160000
2012/02/10300001001 Post Office Sq Boston MaStephen Danner
SCORE
100
1 Huntington Av Boston Ma
Remove and replace roof top chiller (no work visable from public way)
Date:  March 12, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Short form bldg permit | Expiration date: September 12, 2013 | Current use: Comm | Permit id: Sf226337 | Parcel: 0400864000
2013/03/121000001001 Huntington Av Boston MaStephen Danner
SCORE
100
311 Commonwealth Av Boston Ma
Unit #20-renovate bathroom move closet doorway finish floors add millwork new paint
Date:  March 1, 2011
Value:   $35,000
Contractor: Stephen Danner

Client: Creedon Jennife | Permit type: Short form bldg permit | Expiration date: September 1, 2011 | Current use: 7more | Permit id: Sf65788 | Parcel: 0503575010
2011/03/0135000100311 Commonwealth Av Boston MaStephen Danner
SCORE
100
287 Marlborough St Boston Ma
Remove 1st floor ceiling to install treaded rod thought joist patch tape and mud ceiling. Install reinforcements to rear bay
Date:  November 21, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: Two 87 Marlborough St Condo | Permit type: Short form bldg permit | Expiration date: May 21, 2015 | Current use: 1-3fam | Permit id: Sf429139 | Parcel: 0503434000
2014/11/2112000100287 Marlborough St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Install mezzine over bathroom ceiling for storage purposes sprinkler
Date:  June 12, 2013
Value:   $2,500
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Amendment to a long form | Expiration date: December 12, 2013 | Current use: Comm | Permit id: A226340 | Parcel: 0304160000
2013/06/1225001001 Post Office Sq Boston MaStephen Danner
SCORE
100
1 Huntington Av Boston Ma
Demo-remove existing library mailroom and front desk. Install new kitchen at libray install new millwork at front desk and libray install new fire alarm control room install new mail boxes. All mep and fire alarm to be permitted by contracted/lic sub-contractor - all work to be interior only - not visible from a public view - fire permit to be secured by afa
Date:  March 16, 2012
Value:   $150,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Short form bldg permit | Expiration date: September 16, 2012 | Current use: Comm | Permit id: Sf125301 | Parcel: 0400864000
2012/03/161500001001 Huntington Av Boston MaStephen Danner
SCORE
100
465 Columbus Av Boston Ma
Prep for new build. Separate shop front.
Date:  June 27, 2014
Value:   $1,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: December 27, 2014 | Current use: Mixed | Permit id: Sf378920
2014/06/271000100465 Columbus Av Boston MaStephen Danner
SCORE
100
98 W Concord St Boston Ma
Demo existing kitchen install new resessed can lights rewire kitchen refinish floors
Date:  December 30, 2014
Value:   $20,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: June 30, 2015 | Current use: 1-3fam | Permit id: Sf438369 | Parcel: 0900604000
2014/12/302000010098 W Concord St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Legal occupancy:; offices stores bank garage car rental barbershop &; restaurant coo for the 1st floor restaurant (tossed) alt120837; issued: 6/18/2012 &; a2263 issued:;6/12/13;&; alt2274 issued: 3/15/2013
Date:  June 27, 2013
Value:   $542,300
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo255102 | Parcel: 0304160000
2013/06/275423001001 Post Office Sq Boston MaStephen Danner
SCORE
100
33 39 Farnsworth St Boston Ma
Demo exiting non-structual partition walls electrical demo safe
Date:  October 23, 2013
Value:   $19,550
Contractor: Stephen Danner

Client: W2005 Bwh Realt | Permit type: Short form bldg permit | Expiration date: April 23, 2014 | Current use: Comm | Permit id: Sf298306 | Parcel: 0602660001
2013/10/231955010033 39 Farnsworth St Boston MaStephen Danner
SCORE
100
107 Saint Botolph St Boston Ma
Finish 2 bathrooms paint all walls refinish floors design build electrical and mechanical. Install new indows
Date:  January 4, 2013
Value:   $30,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: July 4, 2013 | Current use: 1-3fam | Permit id: Sf211620 | Parcel: 0400883000
2013/01/0430000100107 Saint Botolph St Boston MaStephen Danner
SCORE
100
172 Newbury St Boston Ma
Office retail &; accessory garage hair slon day spa and accessory massage c/o-for retail-;1st. Fl. - ;only; alt 213966 issued 1/22/2012 ;
Date:  April 23, 2013
Value:   $95,000
Contractor: Stephen Danner

Client: Jamestown 172 Newbury Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo235127 | Parcel: 0501402000
2013/04/2395000100172 Newbury St Boston MaStephen Danner
SCORE
100
332 334 Congress St Boston Ma
Remove all interior non-load walls
Date:  January 31, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: Agnd Fort Point Llc | Permit type: Short form bldg permit | Expiration date: July 31, 2014 | Current use: Comm | Permit id: Sf323654 | Parcel: 0602667000
2014/01/3112000100332 334 Congress St Boston MaStephen Danner
SCORE
100
2 Newbury St Boston Ma
Tenant retail fitup on first floor; all interior non-structural walls plumbing electrical mechanical design build also tenant fire alarm added to existing system.
Date:  December 11, 2012
Value:   $80,000
Contractor: Stephen Danner

Client: Jamestown 2 Newbury Lp | Permit type: Short form bldg permit | Current use: Mixed | Permit id: Sf206563 | Parcel: 0503223000
2012/12/11800001002 Newbury St Boston MaStephen Danner
SCORE
100
8 Boylston St Boston Ma
Vineyard vines- install new rear fire rated assembily at common hall/strock room. Install outlets as requiried paint and finish
Date:  February 27, 2013
Value:   $10,000
Contractor: Stephen Danner

Client: Bp Prucenter Acquisition Llc | Permit type: Short form bldg permit | Expiration date: August 27, 2013 | Current use: Comm | Permit id: Sf223397 | Parcel: 0401037100
2013/02/27100001008 Boylston St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Offices stores bank garage car rental barbershop alt120837 issued 6/18/2012 &; a226340;(pending);occupany being corrected on alt2274 issued 3/15/2013 temp coo for restaurant (1st. Floor) only;(excluding mezzanine);- pending issuance of a2263 - to expire in days on 4/25/2013- second ext. -expires - 5/25/2013- third extension - expires; days 6/17/2013 pending completion
Date:  March 19, 2013
Value:   $329,000
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo227278 | Parcel: 0304160000
2013/03/193290001001 Post Office Sq Boston MaStephen Danner
SCORE
100
66 86 Lincoln St Boston Ma
Change use from retail store to gym/assembly use. Renovate.
Date:  October 6, 2015
Value:   $150,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Long form/alteration permit | Expiration date: April 6, 2016 | Current use: Comm | Permit id: Alt381735 | Parcel: 0304304100
2015/10/0615000010066 86 Lincoln St Boston MaStephen Danner
SCORE
100
66 86 Lincoln St Boston Ma
Residential units temporary certificate of occupancy for the ufc gym.; tco;pending finale inspection on;alt381735 to expire on 2/1/16. Sf386 7/21/14 &; alt381735 10/6/15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza C | Permit type: Certificate of occupancy | Expiration date: April 28, 2015 | Current use: Mixed | Permit id: Coo437005 | Parcel: 0304304100
2015/10/098500010066 86 Lincoln St Boston MaStephen Danner
SCORE
100
265 275 Dartmouth St Boston Ma
Re-lay newbury st side patio repoint front stairs repoint basement valut
Date:  October 25, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: Copley Condominium Trust | Permit type: Short form bldg permit | Expiration date: April 25, 2012 | Current use: 7more | Permit id: Sf102630 | Parcel: 0501312000
2011/10/2525000100265 275 Dartmouth St Boston MaStephen Danner
SCORE
100
265 275 Dartmouth St Boston Ma
Replace floor joist and sheathing per drawings. Work at 144 newbury st retial per plan
Date:  February 14, 2013
Value:   $20,000
Contractor: Stephen Danner

Client: Copley Condominium Trust | Permit type: Long form/alteration permit | Expiration date: August 14, 2013 | Current use: Comm | Permit id: Alt215777 | Parcel: 0501312000
2013/02/1420000100265 275 Dartmouth St Boston MaStephen Danner
SCORE
100
1 Waltham St Boston Ma
Relocaye existing gas line and electrical roof feed remove drywall and raplace. Install new empd roofing system reponit rear masonary
Date:  September 7, 2011
Value:   $40,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: March 7, 2012 | Current use: 1-3fam | Permit id: Sf94537 | Parcel: 0306879000
2011/09/07400001001 Waltham St Boston MaStephen Danner
SCORE
100
42 Rutland Sq Boston Ma
Renovate bathroom kitchen sheetrock repairs paint and sand floors no exterior work
Date:  September 1, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: Quamina | Permit type: Short form bldg permit | Expiration date: March 1, 2012 | Current use: 1-3fam | Permit id: Sf93788 | Parcel: 0402700000
2011/09/012500010042 Rutland Sq Boston MaStephen Danner
SCORE
100
56 Bennett St Brighton Ma
Install new asphalth shingles over existing spot point chimney on driveway side.
Date:  September 1, 2011
Value:   $10,700
Contractor: Stephen Danner

Client: Strauss Adele H | Permit type: Short form bldg permit | Expiration date: March 1, 2012 | Current use: 1-2fam | Permit id: Sf93785 | Parcel: 2204167000
2011/09/011070010056 Bennett St Brighton MaStephen Danner
SCORE
100
77 Worcester St Boston Ma
Reseem existing epdm roof (repairs) all details and seems cut and point chemneys at rear of building
Date:  September 1, 2011
Value:   $7,150
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: March 1, 2012 | Current use: 1-3fam | Permit id: Sf93786 | Parcel: 0900563000
2011/09/01715010077 Worcester St Boston MaStephen Danner
SCORE
100
1 Huntington Av Boston Ma
Emergency services due to broken sprinkler pipe
Date:  September 1, 2011
Value:   $20,000
Contractor: Stephen Danner

Client: Manager Greenhouse Ltd Ptnrshp | Permit type: Short form bldg permit | Expiration date: March 1, 2012 | Current use: 7more | Permit id: Sf93790 | Parcel: 0400864000
2011/09/01200001001 Huntington Av Boston MaStephen Danner
SCORE
100
8 Sorrento St Allston Ma
Remove existing asphalt roof install ne water barrier at roof edge new drip edge relpace damaged boards install new architectural shingles
Date:  June 1, 2010
Value:   $6,200
Contractor: Stephen Danner

Client: Barbato Charles | Permit type: Short form bldg permit | Expiration date: December 1, 2010 | Current use: 1-2fam | Permit id: Sf28004 | Parcel: 2200071000
2010/06/0162001008 Sorrento St Allston MaStephen Danner
SCORE
100
Dartmouth St Boston Ma
Install new epdm roof fix flashing at building rear (no flashing will change) contact for stephen (781) 726-1373
Date:  April 7, 2010
Value:   $7,200
Contractor: Stephen Danner

Client: Mc Cabe Joseph | Permit type: Short form bldg permit | Expiration date: October 7, 2010 | Current use: 1unit | Permit id: Sf20888 | Parcel: 0400314000
2010/04/077200100Dartmouth St Boston MaStephen Danner
SCORE
100
24 Brimmer St Boston Ma
Install new epdm roof new copper trim to match existing new gutters to match existing prime and paint front bay.
Date:  May 28, 2010
Value:   $6,000
Contractor: Stephen Danner

Client: Carroll Harold | Permit type: Short form bldg permit | Expiration date: November 28, 2010 | Current use: 1-2fam | Permit id: Sf27748 | Parcel: 0502422000
2010/05/28600010024 Brimmer St Boston MaStephen Danner
SCORE
100
234 Clarendon St Boston Ma
Remove walls and rework ceiling on the third and fourth floors only
Date:  October 25, 2010
Value:   $3,000
Contractor: Stephen Danner

Client: Jamestown 234-236 Clarendon St | Permit type: Short form bldg permit | Expiration date: April 25, 2011 | Current use: Comm | Permit id: Sf48526 | Parcel: 0501359000
2010/10/253000100234 Clarendon St Boston MaStephen Danner
SCORE
100
Beacon St Boston Ma
Install new epdm roof install matching copper gutter at building rear tie in existing slate to gutter at building rear ; contact stephen (781)726-1373
Date:  April 7, 2010
Value:   $4,000
Contractor: Stephen Danner

Client: Beacon St Condo Assoc | Permit type: Short form bldg permit | Expiration date: October 7, 2010 | Current use: Multi | Permit id: Sf20886 | Parcel: 0502553000
2010/04/074000100Beacon St Boston MaStephen Danner
SCORE
100
164 W Newton St Boston Ma
Add additional lvl to support roof and skylights. Remove rear window and add french door. Submitted: 2 sets stamped engineer plans.
Date:  April 28, 2010
Value:   $25,000
Contractor: Stephen Danner

Client: Gartrell Kennet | Permit type: Long form/alteration permit | Expiration date: October 28, 2010 | Current use: 1-2fam | Permit id: Alt18364 | Parcel: 0402772000
2010/04/2825000100164 W Newton St Boston MaStephen Danner
SCORE
100
91 Newbury St Boston Ma
Install no load bearing walls install clothing fixtures paint refinish floor install fire alarm and life and safety equipment.
Date:  July 23, 2012
Value:   $30,000
Contractor: Stephen Danner

Client: Ta 85-91 Newbury St Limited Prtnsp | Permit type: Short form bldg permit | Expiration date: January 23, 2013 | Current use: Mixed | Permit id: Sf147684 | Parcel: 0501289000
2012/07/233000010091 Newbury St Boston MaStephen Danner
SCORE
100
179 Newbury St Boston Ma
Change use on building to non-separated mixed use. Change basement first and second floor to use group m. Change third floor to use group b. Existing use basement-m first and second a-3 and r-3 third floor. Added new stairs from basement to first floor land lord to framming opening under separate permit. Change store front to the specification supplied in the drawings. (application in with land marks). Add additional structural work as per drawings;fire rated stair enclosure and ada compliant lift. Mep fa and fp.
Date:  October 15, 2010
Value:   $17,000
Contractor: Stephen Danner

Client: Jamestown 179 Newbury Lp | Permit type: Long form/alteration permit | Expiration date: April 15, 2011 | Current use: Comm | Permit id: Alt23413 | Parcel: 0501375000
2010/10/1517000100179 Newbury St Boston MaStephen Danner
SCORE
100
164 W Newton St Boston Ma
Renovate 1st and 2nd stories install interior partition walls. (per drawings) new electrical (design build) new plumbing (design build) install owners finishes. Renovate the existing basement storage and mechanical space to occupiable living space. Note. Drawing gcod and far exception
Date:  February 16, 2010
Value:   $284,186
Contractor: Stephen Danner

Client: Gartrell Kennet | Permit type: Long form/alteration permit | Current use: 1-2fam | Permit id: Alt13651 | Parcel: 0402772000
2010/02/16284186100164 W Newton St Boston MaStephen Danner
SCORE
100
198 202 Warren Av Boston Ma
Replace rear wall sheet rock and ins
Date:  September 12, 2012
Value:   $1,000
Contractor: Stephen Danner

Client: Perroncello-200w J. | Permit type: Short form bldg permit | Expiration date: March 12, 2013 | Current use: 1-4fam | Permit id: Sf182853 | Parcel: 0400513000
2012/09/121000100198 202 Warren Av Boston MaStephen Danner
SCORE
100
179 Newbury St Boston Ma
Demo existing walls per drawing. Construct new walls per drawings. Install new plubing haeting and electrical system per the drawings. Any structural work show on drawings will be applied for under seprate long form permit.
Date:  April 23, 2010
Value:   $146,000
Contractor: Stephen Danner

Client: Jamestown 179 Newbury Lp | Permit type: Short form bldg permit | Expiration date: October 23, 2010 | Current use: Mixed | Permit id: Sf22905 | Parcel: 0501375000
2010/04/23146000100179 Newbury St Boston MaStephen Danner
SCORE
100
134 Cushing Av Dorchester Ma
Remove existing epdm roof install . 0 epdm roofing fully adhere all perimeter metal pich pocket at roof pipes and conduit
Date:  June 10, 2010
Value:   $14,400
Contractor: Stephen Danner

Client: P And R Properties | Permit type: Short form bldg permit | Expiration date: December 10, 2010 | Current use: 1-3fam | Permit id: Sf29425 | Parcel: 1301473000
2010/06/1014400100134 Cushing Av Dorchester MaStephen Danner
SCORE
100
172 Dorchester St South Boston Ma
Install temp structure for others to complete work. (mason) sister lvls to existing per drawing. Sister clips to front stair way.; pour concrete footings and add cmu per drawing
Date:  July 29, 2010
Value:   $20,000
Contractor: Stephen Danner

Client: Mcelaney Daniel | Permit type: Long form/alteration permit | Current use: 1-3fam | Permit id: Alt27746 | Parcel: 0701116002
2010/07/2920000100172 Dorchester St South Boston MaStephen Danner
SCORE
100
172 Dorchester St South Boston Ma
Remove existing decking on roof repair epdm roofing install new decking. Install new flooring in front common hallway repair handrails paint. Remove existing walls in rear hallway install new drywall tape mud and sand. Install neww finishes in basement unit. Ie draywall paint lighting and hvac. All mep work to be design build.
Date:  May 28, 2010
Value:   $25,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: November 28, 2010 | Current use: 1-3fam | Permit id: Sf27745 | Parcel: 0701116000
2010/05/2825000100172 Dorchester St South Boston MaStephen Danner
SCORE
100
164 W Newton St Boston Ma
Interior framming drywall bathroom renovation and kitchen install. Plumbing mechanical and electrical.
Date:  February 25, 2010
Value:   $50,000
Contractor: Stephen Danner

Client: Gartrell Kenneth D | Permit type: Short form bldg permit | Expiration date: August 25, 2010 | Current use: 1-2fam | Permit id: Sf16148 | Parcel: 0402772000
2010/02/2550000100164 W Newton St Boston MaStephen Danner
SCORE
100
191 Commonwealth Av Boston Ma
Demo per plan. Add bathroom per plan renovate both existing bathrooms per plan. Update kitchen per plan. Add closit in bedrooms as per plan.
Date:  January 7, 2010
Value:   $80,000
Contractor: Stephen Danner

Client: Wellman Bradfor | Permit type: Short form bldg permit | Expiration date: July 7, 2010 | Current use: 7more | Permit id: Sf10257 | Parcel: 0502952018
2010/01/0780000100191 Commonwealth Av Boston MaStephen Danner
SCORE
100
43 Fort Av Boston Ma
Remove existing roof and replace new replace clap board where rott
Date:  September 30, 2016
Value:   $10,500
Contractor: Stephen Danner

Client: Distant Cherrita | Permit type: Short form bldg permit | Expiration date: March 30, 2017 | Current use: 1-2fam | Permit id: Sf642807 | Parcel: 1100618000
2016/09/301050010043 Fort Av Boston MaStephen Danner
SCORE
100
2 Newbury St Boston Ma
Tenant retail fitup on first floor; all interior non-structural walls plumbing electrical mechanical design build also tenant fire alarm added to existing system.
Date:  December 11, 2012
Value:   $80,000
Contractor: Stephen Danner

Client: Authorized Agent | Permit type: Short form bldg permit | Current use: Mixed | Permit id: Sf206563 | Parcel: 0503223000
2012/12/11800001002 Newbury St Boston MaStephen Danner
SCORE
100
2 Newbury St Boston Ma
Six units &; retail - long form #891 2002 sf206563 issued 12 11 2012 coo for retail space - garden level only
Date:  March 4, 2013
Value:   $80,000
Contractor: Stephen Danner

Client: Authorized Agent | Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo224001 | Parcel: 0503223000
2013/03/04800001002 Newbury St Boston MaStephen Danner
SCORE
100
373375 Border St East Boston Ma
Install; rear porch same size as existing
Date:  October 28, 2016
Value:   $5,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: April 28, 2017 | Current use: 1-2fam | Permit id: Sf650421 | Parcel: 0103644000
2016/10/285000100373375 Border St East Boston MaStephen Danner
SCORE
100
3339 Farnsworth St Boston Ma
Demo exiting non-structual partition walls electrical demo safe
Date:  October 23, 2013
Value:   $19,550
Contractor: Stephen Danner

Client: Cfs Seaport Llc | Permit type: Short form bldg permit | Expiration date: April 23, 2014 | Current use: Comm | Permit id: Sf298306 | Parcel: 0602660001
2013/10/23195501003339 Farnsworth St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Remove all interior partition walls strip sheetrock at preimeter walls & ceilings to studs remove existing flooring to slab remove existing lighting (panel to remain)remove existing plumbing fixtures. Heating fire alarm systems to remain.
Date:  February 10, 2012
Value:   $30,000
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Short form bldg permit | Expiration date: August 10, 2012 | Current use: Comm | Permit id: Sf118942 | Parcel: 0304160000
2012/02/10300001001 Post Office Sq Boston MaStephen Danner
SCORE
100
173b Norfolk Av Boston Ma
Interior demo and partition framming exterior painting and parking lot repairs
Date:  March 30, 2011
Value:   $25,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: September 30, 2011 | Current use: Comm | Permit id: Sf70115 | Parcel: 0800560000
2011/03/3025000100173b Norfolk Av Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Legal occupancy:; offices stores bank garage car rental barbershop &; restaurant coo for the 1st floor restaurant (tossed) alt120837; issued: 6 18 2012 &; a2263 issued:;6 12 13;&; alt2274 issued: 3 15 2013
Date:  June 27, 2013
Value:   $542,300
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo255102 | Parcel: 0304160000
2013/06/275423001001 Post Office Sq Boston MaStephen Danner
SCORE
100
179 Newbury St Boston Ma
(1) apt (1) store (2) art galleries c o-for (1); store -only alt 23413 issued 1015 20 sf 22905 issued 4 23 2011
Date:  April 6, 2011
Contractor: Stephen Danner

Client: Jamestown 179 Newbury St Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo65807 | Parcel: 0501375000
2011/04/060100179 Newbury St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Change occupancy from offices stores bank garage car rental and barber shop to:;offices stores bank garage car rental and barber shop and restaurant #37 - ;(building out work completed under alt120837)
Date:  March 15, 2013
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Long form/alteration permit | Expiration date: September 15, 2013 | Current use: Comm | Permit id: Alt227420 | Parcel: 0304160000
2013/03/1501001 Post Office Sq Boston MaStephen Danner
SCORE
100
374382 Congress St Boston Ma
Frame door way at acess to roof install new carpet install new act scrape prime and paint wall walls.
Date:  October 23, 2013
Value:   $21,470
Contractor: Stephen Danner

Client: T-C Fort Point Creative | Permit type: Short form bldg permit | Expiration date: April 23, 2014 | Current use: Comm | Permit id: Sf298302 | Parcel: 0602646010
2013/10/2321470100374382 Congress St Boston MaStephen Danner
SCORE
100
6686 Lincoln St Boston Ma
Demo retail fittup for gym space. Mep design build alt381735 filed for change of use
Date:  July 21, 2014
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Short form bldg permit | Expiration date: January 21, 2015 | Current use: Mixed | Permit id: Sf386540 | Parcel: 0304304100
2014/07/21850001006686 Lincoln St Boston MaStephen Danner
SCORE
100
198202 Warren Av Boston Ma
Replace rear wall sheet rock and ins
Date:  September 12, 2012
Value:   $1,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: March 12, 2013 | Current use: 1-4fam | Permit id: Sf182853 | Parcel: 0400513000
2012/09/121000100198202 Warren Av Boston MaStephen Danner
SCORE
100
445 Marlborough St Boston Ma
Demo per drawings new wall construction per drawings relocate bathrooms per drawings new hardwood flooring paint (all work to be completed per the drawings) no exterior work with this application.
Date:  May 30, 2012
Value:   $75,000
Contractor: Stephen Danner

Client: Frieze Kenneth S | Permit type: Long form/alteration permit | Expiration date: November 30, 2012 | Current use: 1-2fam | Permit id: Alt133451 | Parcel: 0503863000
2012/05/3075000100445 Marlborough St Boston MaStephen Danner
SCORE
100
97 Forbes St Boston Ma
Change closet doors 2nd floor bedrooms remove sections of existing deck rework front entrance masonary stairs
Date:  July 6, 2015
Value:   $2,500
Contractor: Stephen Danner

Client: Lepeska Peter J | Permit type: Short form bldg permit | Expiration date: January 6, 2016 | Current use: 1-2fam | Permit id: Sf491298 | Parcel: 1900144000
2015/07/06250010097 Forbes St Boston MaStephen Danner
SCORE
100
311 Commonwealth Av Boston Ma
Unit #20-renovate bathroom move closet doorway finish floors add millwork new paint
Date:  March 1, 2011
Value:   $35,000
Contractor: Stephen Danner

Client: Greenwald Karen | Permit type: Short form bldg permit | Expiration date: September 1, 2011 | Current use: 7more | Permit id: Sf65788 | Parcel: 0503575010
2011/03/0135000100311 Commonwealth Av Boston MaStephen Danner
SCORE
100
1 Stuart St Boston Ma
23rdfl;unit c and d;interior renovations to these two units
Date:  January 31, 2011
Value:   $42,500
Contractor: Stephen Danner

Client: One Hundred Stuart St | Permit type: Short form bldg permit | Expiration date: July 31, 2011 | Current use: Comm | Permit id: Sf62299 | Parcel: 0500075020
2011/01/31425001001 Stuart St Boston MaStephen Danner
SCORE
100
332334 Congress St Boston Ma
Remove all interior non-load walls
Date:  January 31, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: T-C Fort Point Creative | Permit type: Short form bldg permit | Expiration date: July 31, 2014 | Current use: Comm | Permit id: Sf323654 | Parcel: 0602667000
2014/01/3112000100332334 Congress St Boston MaStephen Danner
SCORE
100
373375 Border St East Boston Ma
Demo interior (non-load bearing walls) relocate kitchen location renovate bathroom (basement 1st floor top floor) remove existing window and install new doors (to outside)
Date:  June 27, 2016
Value:   $10,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: December 27, 2016 | Current use: 1-2fam | Permit id: Sf604917 | Parcel: 0103644000
2016/06/2710000100373375 Border St East Boston MaStephen Danner
SCORE
100
51 Gray St Boston Ma
New epdm roof
Date:  October 18, 2011
Value:   $7,950
Contractor: Stephen Danner

Client: Kahan Jeffrey | Permit type: Short form bldg permit | Expiration date: April 18, 2012 | Current use: 1-2fam | Permit id: Sf101459 | Parcel: 0500884000
2011/10/18795010051 Gray St Boston MaStephen Danner
SCORE
100
6686 Lincoln St Boston Ma
Residential commercial ;retail wireless communication; and assembly gym certificate of occupancy for the ufc gym sf386 7 21 14 &; alt381735 10 6 15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo533471 | Parcel: 0304304100
2015/10/09850001006686 Lincoln St Boston MaStephen Danner
SCORE
100
562 Massachusetts Av Boston Ma
Add new dormer at rear of building; build roof deck per drawings
Date:  March 6, 2014
Value:   $20,000
Contractor: Stephen Danner

Client: Five 62 Mass Av Condo Tr | Permit type: Long form/alteration permit | Expiration date: September 6, 2014 | Current use: 1-4fam | Permit id: Alt305851 | Parcel: 0900820000
2014/03/0620000100562 Massachusetts Av Boston MaStephen Danner
SCORE
100
6686 Lincoln St Boston Ma
Residential units temporary certificate of occupancy for the ufc gym.; tco;pending finale inspection on;alt381735 to expire on 2 1 16. Sf386 7 21 14 &; alt381735 10 6 15;
Date:  October 9, 2015
Value:   $85,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Certificate of occupancy | Expiration date: April 28, 2015 | Current use: Mixed | Permit id: Coo437005 | Parcel: 0304304100
2015/10/09850001006686 Lincoln St Boston MaStephen Danner
SCORE
100
374382 Congress St Boston Ma
Install new structual steel per drawings. Remove existing brick
Date:  January 31, 2014
Value:   $15,000
Contractor: Stephen Danner

Client: Cfs Seaport Llc | Permit type: Long form/alteration permit | Expiration date: July 31, 2014 | Current use: Comm | Permit id: Alt312287 | Parcel: 0602646000
2014/01/3115000100374382 Congress St Boston MaStephen Danner
SCORE
100
203 W Springfield St Boston Ma
Install rear gutter fix existing roofing seams lead flashing reattach drip pans replace existing alum. Gutter w copper clean all gutters.
Date:  May 25, 2011
Value:   $5,430
Contractor: Stephen Danner

Client: Two 03 West Springfield St | Permit type: Short form bldg permit | Expiration date: November 25, 2011 | Current use: 1-2fam | Permit id: Sf78607 | Parcel: 0402554000
2011/05/255430100203 W Springfield St Boston MaStephen Danner
SCORE
100
465 Columbus Av Boston Ma
Prep for new build. Separate shop front.
Date:  June 27, 2014
Value:   $1,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: December 27, 2014 | Current use: Mixed | Permit id: Sf378920
2014/06/271000100465 Columbus Av Boston MaStephen Danner
SCORE
100
287 Marlborough St Boston Ma
Remove 1st floor ceiling to install treaded rod thought joist patch tape and mud ceiling. Install reinforcements to rear bay
Date:  November 21, 2014
Value:   $12,000
Contractor: Stephen Danner

Client: Two 87 Marlborough St Condo | Permit type: Short form bldg permit | Expiration date: May 21, 2015 | Current use: 1-3fam | Permit id: Sf429139 | Parcel: 0503434000
2014/11/2112000100287 Marlborough St Boston MaStephen Danner
SCORE
100
465 Columbus Av Boston Ma
Renovate existing convenience store all mep design build
Date:  April 7, 2014
Value:   $50,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: October 7, 2014 | Current use: Mixed | Permit id: Sf350520
2014/04/0750000100465 Columbus Av Boston MaStephen Danner
SCORE
100
4 E Concord St Boston Ma
Add storage at front closet remove wall to basement & install hand rail install new oak stair treads
Date:  October 25, 2011
Value:   $2,500
Contractor: Stephen Danner

Client: Jurasic Michael | Permit type: Short form bldg permit | Expiration date: April 25, 2012 | Current use: 1-2fam | Permit id: Sf102623 | Parcel: 0801388080
2011/10/2525001004 E Concord St Boston MaStephen Danner
SCORE
100
1 Newbury St Boston Ma
Const interior non-load bearing walls sheetrock painting new flooring electrical (lighting)and millwork install
Date:  May 17, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Rotenberg Jon Trsts | Permit type: Short form bldg permit | Expiration date: November 17, 2013 | Current use: Comm | Permit id: Sf245303 | Parcel: 0501318000
2013/05/171000001001 Newbury St Boston MaStephen Danner
SCORE
100
265275 Dartmouth St Boston Ma
Re-lay newbury st side patio repoint front stairs repoint basement valut
Date:  October 25, 2011
Value:   $25,000
Contractor: Stephen Danner

Client: Copley Condominium Trust | Permit type: Short form bldg permit | Expiration date: April 25, 2012 | Current use: 7more | Permit id: Sf102630 | Parcel: 0501312000
2011/10/2525000100265275 Dartmouth St Boston MaStephen Danner
SCORE
100
465 Columbus Av Boston Ma
Remove existing drop (act) ceiling at the sales floor. Exposed deck to remain this will expose the horizontal fire separation of precast concrete slab which has a minimum fire rating of 2 hrs. (please see attached letter from architect and table 508. 4 of the ibc) cost reflects on sf350520
Date:  June 27, 2014
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: December 27, 2014 | Current use: Mixed | Permit id: Sf378212
2014/06/270100465 Columbus Av Boston MaStephen Danner
SCORE
100
265275 Dartmouth St Boston Ma
Replace floor joist and sheathing per drawings. Work at 144 newbury st retial per plan
Date:  February 14, 2013
Value:   $20,000
Contractor: Stephen Danner

Client: Copley Condominium Trust | Permit type: Long form/alteration permit | Expiration date: August 14, 2013 | Current use: Comm | Permit id: Alt215777 | Parcel: 0501312000
2013/02/1420000100265275 Dartmouth St Boston MaStephen Danner
SCORE
100
16a16 Grove St Boston Ma
Remove and replace existing epdm roof replace with tapered insulation mechanical fastened fully adhered w . 0 epdm
Date:  August 23, 2016
Value:   $10,500
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: February 23, 2017 | Current use: Multi | Permit id: Sf629174
2016/08/231050010016a16 Grove St Boston MaStephen Danner
SCORE
100
62 W Rutland Sq Boston Ma
3rd floor apt.-demo replace drywall install cabinets replace bathroom fixtures and install crowne molding and paint
Date:  May 22, 2013
Value:   $9,880
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: November 22, 2013 | Current use: 1-3fam | Permit id: Sf246513 | Parcel: 0402433000
2013/05/22988010062 W Rutland Sq Boston MaStephen Danner
SCORE
100
127129a Newbury St Boston Ma
Interior demo interior ns framming all new paint refinish existing flooring electrical plumbing and mechanical design duib. Add fire alarm to existing building system.
Date:  December 11, 2012
Value:   $50,000
Contractor: Stephen Danner

Client: Jamestown 127-129 Newbury St | Permit type: Short form bldg permit | Expiration date: June 11, 2013 | Current use: Mixed | Permit id: Sf207010 | Parcel: 0501335000
2012/12/1150000100127129a Newbury St Boston MaStephen Danner
SCORE
100
151 Tremont St Boston Ma
Install new cooling tower at roof top and all assicioated piping and ducting
Date:  January 4, 2013
Value:   $150,000
Contractor: Stephen Danner

Client: Tremont On The Common | Permit type: Short form bldg permit | Expiration date: July 4, 2013 | Current use: 1-4fam | Permit id: Sf211623 | Parcel: 0304850000
2013/01/04150000100151 Tremont St Boston MaStephen Danner
SCORE
100
6686 Lincoln St Boston Ma
Change use from retail store to gym assembly use. Renovate.
Date:  October 6, 2015
Value:   $150,000
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Long form/alteration permit | Expiration date: April 6, 2016 | Current use: Comm | Permit id: Alt381735 | Parcel: 0304304100
2015/10/061500001006686 Lincoln St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Offices stores bank garage car rental barbershop alt120837 issued 6 18 2012 &; a226340;(pending);occupany being corrected on alt2274 issued 3 15 2013 temp coo for restaurant (1st. Floor) only;(excluding mezzanine);- pending issuance of a2263 - to expire in days on 4 25 2013- second ext. -expires - 5 25 2013- third extension - expires; days 6 17 2013 pending completion
Date:  March 19, 2013
Value:   $329,000
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo227278 | Parcel: 0304160000
2013/03/193290001001 Post Office Sq Boston MaStephen Danner
SCORE
100
1 Stuart St Boston Ma
Remove closit wall remove wall in bedroom for future mill work relocate electrical.
Date:  May 25, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: One Hundred Stuart St | Permit type: Short form bldg permit | Expiration date: November 25, 2011 | Current use: 7more | Permit id: Sf78609 | Parcel: 0500075020
2011/05/2535001001 Stuart St Boston MaStephen Danner
SCORE
100
172 Newbury St Boston Ma
Rework existing fire alarm system
Date:  April 18, 2013
Value:   $5,000
Contractor: Stephen Danner

Client: Jamestown 172 Newbury St Lp | Permit type: Electrical fire alarms | Expiration date: October 18, 2013 | Current use: Comm | Permit id: Efa236493 | Parcel: 0501402000
2013/04/185000100172 Newbury St Boston MaStephen Danner
SCORE
100
24 Pleasant St Charlestown Ma
Demo interior walls existing rear deck existing kitchen & bathrooms. Revo bathroom install new kitchen new wall framming & new rear deck. All design build mechanical plumbing and electrical
Date:  July 20, 2011
Value:   $80,000
Contractor: Stephen Danner

Client: Martindale Terrance A | Permit type: Short form bldg permit | Expiration date: January 20, 2012 | Current use: 1-2fam | Permit id: Sf86671 | Parcel: 0203195000
2011/07/208000010024 Pleasant St Charlestown MaStephen Danner
SCORE
100
172 Dorchester St South Boston Ma
Rebuild existing roof deck to the drawing supplied by choo &; company
Date:  December 15, 2011
Value:   $12,000
Contractor: Stephen Danner

Client: Harrison Matthew | Permit type: Amendment to a long form | Expiration date: June 15, 2012 | Current use: 1-3fam | Permit id: A85993 | Parcel: 0701116002
2011/12/1512000100172 Dorchester St South Boston MaStephen Danner
SCORE
100
87 Forbes St Boston Ma
Amendment to revise ert516833 (mj) to the changes represented in the drawings based off the revision by the bra "ndod" (these drawings to replace ert616833)
Date:  July 8, 2016
Contractor: Stephen Danner

Permit type: Amendment to a long form | Expiration date: January 8, 2017 | Current use: 1-2fam | Permit id: A599548 | Parcel: 1900143000
2016/07/08010087 Forbes St Boston MaStephen Danner
SCORE
100
1 Huntington Av Boston Ma
Demo-remove existing library mailroom and front desk. Install new kitchen at libray install new millwork at front desk and libray install new fire alarm control room install new mail boxes. All mep and fire alarm to be permitted by contracted lic sub-contractor - all work to be interior only - not visible from a public view - fire permit to be secured by afa
Date:  March 16, 2012
Value:   $150,000
Contractor: Stephen Danner

Client: Sophine Lps | Permit type: Short form bldg permit | Expiration date: September 16, 2012 | Current use: Comm | Permit id: Sf125301 | Parcel: 0400864000
2012/03/161500001001 Huntington Av Boston MaStephen Danner
SCORE
100
87 Forbes St Boston Ma
Erect one family dwelling on existing lot as per drawings. ;
Date:  November 4, 2015
Value:   $250,000
Contractor: Stephen Danner

Permit type: Erect/new construction | Current use: 1-2fam | Permit id: Ert516833 | Parcel: 1900143000
2015/11/0425000010087 Forbes St Boston MaStephen Danner
SCORE
100
172 Newbury St Boston Ma
Office retail &; accessory garage hair slon day spa and accessory massage c o-for retail-;1st. Fl. - ;only; alt 213966 issued 1 22 2012 ;
Date:  April 23, 2013
Value:   $95,000
Contractor: Stephen Danner

Client: Jamestown 172 Newbury St Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo235127 | Parcel: 0501402000
2013/04/2395000100172 Newbury St Boston MaStephen Danner
SCORE
100
113 Marlborough St Boston Ma
Remove existing masonry wall between 113 and 115 instal fire rated door opeaning per the drawings remove interior walls at 113 and 115. Construct new interior partition walls fire rated corridor tape mud and paint limts of work 4th floor.
Date:  June 17, 2011
Value:   $50,000
Contractor: Stephen Danner

Client: Sunshine Gabriel | Permit type: Long form/alteration permit | Expiration date: December 17, 2011 | Current use: 1-2fam | Permit id: Alt79292 | Parcel: 0502711000
2011/06/1750000100113 Marlborough St Boston MaStephen Danner
SCORE
100
6686 Lincoln St Boston Ma
Change use from retail store to gym assembly use. Renovate.
Date:  January 29, 2015
Contractor: Stephen Danner

Client: Lincoln Plaza Condo Tr | Permit type: Board of appeals | Expiration date: January 29, 2017 | Current use: Comm | Permit id: Boa407160 | Parcel: 0304304100
2015/01/2901006686 Lincoln St Boston MaStephen Danner
SCORE
100
311 Commonwealth Av Boston Ma
Remove esxisting floor kitchen interior doors & molding. Install new kitchen floors paint and plaster. Install new stackable washer and dryer
Date:  December 13, 2011
Value:   $50,000
Contractor: Stephen Danner

Client: Taplin Mary-Ellen | Permit type: Short form bldg permit | Expiration date: June 13, 2012 | Current use: Comm | Permit id: Sf110228 | Parcel: 0503575035
2011/12/1350000100311 Commonwealth Av Boston MaStephen Danner
SCORE
100
8 Boylston St Boston Ma
Vineyard vines- install new rear fire rated assembily at common hall strock room. Install outlets as requiried paint and finish
Date:  February 27, 2013
Value:   $10,000
Contractor: Stephen Danner

Client: Bp Prucenter Acquisition Llc | Permit type: Short form bldg permit | Expiration date: August 27, 2013 | Current use: Comm | Permit id: Sf223397 | Parcel: 0401037100
2013/02/27100001008 Boylston St Boston MaStephen Danner
SCORE
100
717719 Atlantic Av Boston Ma
Replace missing gutter install scupper at roof over flow
Date:  November 18, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: Seven 17 Atlantic Avenue | Permit type: Short form bldg permit | Expiration date: May 18, 2012 | Current use: Comm | Permit id: Sf106562 | Parcel: 0304310000
2011/11/183500100717719 Atlantic Av Boston MaStephen Danner
SCORE
100
1 Huntington Av Boston Ma
Remove and replace roof top chiller (no work visable from public way)
Date:  March 12, 2013
Value:   $100,000
Contractor: Stephen Danner

Client: Sophine Lps | Permit type: Short form bldg permit | Expiration date: September 12, 2013 | Current use: Comm | Permit id: Sf226337 | Parcel: 0400864000
2013/03/121000001001 Huntington Av Boston MaStephen Danner
SCORE
100
107 Saint Botolph St Boston Ma
Finish 2 bathrooms paint all walls refinish floors design build electrical and mechanical. Install new indows
Date:  January 4, 2013
Value:   $30,000
Contractor: Stephen Danner

Client: One 07 St Botolph St | Permit type: Short form bldg permit | Expiration date: July 4, 2013 | Current use: 1-3fam | Permit id: Sf211620 | Parcel: 0400883000
2013/01/0430000100107 Saint Botolph St Boston MaStephen Danner
SCORE
100
69 Montgomery St Boston Ma
Exterior repairs maintance replace side gutter
Date:  November 18, 2011
Value:   $5,800
Contractor: Stephen Danner

Client: Lee Susan Wong | Permit type: Short form bldg permit | Expiration date: May 18, 2012 | Current use: 1-2fam | Permit id: Sf105525 | Parcel: 0400323000
2011/11/18580010069 Montgomery St Boston MaStephen Danner
SCORE
100
98 W Concord St Boston Ma
Swap to locations of closet doors at second floor. Remove walls 1st floor closet
Date:  June 6, 2016
Value:   $10,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: December 6, 2016 | Current use: 1-3fam | Permit id: Sf599206
2016/06/061000010098 W Concord St Boston MaStephen Danner
SCORE
100
1 Post Office Sq Boston Ma
Install mezzine over bathroom ceiling for storage purposes sprinkler
Date:  June 12, 2013
Value:   $2,500
Contractor: Stephen Danner

Client: One Post Office Square Llc | Permit type: Amendment to a long form | Expiration date: December 12, 2013 | Current use: Comm | Permit id: A226340 | Parcel: 0304160000
2013/06/1225001001 Post Office Sq Boston MaStephen Danner
SCORE
100
98 W Concord St Boston Ma
Demo existing kitchen install new resessed can lights rewire kitchen refinish floors
Date:  December 30, 2014
Value:   $20,000
Contractor: Stephen Danner

Permit type: Short form bldg permit | Expiration date: June 30, 2015 | Current use: 1-3fam | Permit id: Sf438369
2014/12/302000010098 W Concord St Boston MaStephen Danner
SCORE
100
562 Massachusetts Av Boston Ma
Install copper shelf at top floor bay replace 3 windows at same
Date:  November 14, 2011
Value:   $3,500
Contractor: Stephen Danner

Client: Iannessa Elizabeth | Permit type: Short form bldg permit | Expiration date: May 14, 2012 | Current use: 1-4fam | Permit id: Sf105520 | Parcel: 0900820006
2011/11/143500100562 Massachusetts Av Boston MaStephen Danner
SCORE
100
138 Chandler St Boston Ma
New copper gutter new copper drain pipe new composite slate at rear mansard
Date:  December 16, 2016
Value:   $14,000
Contractor: Stephen Danner

Client: One 38 Chandler St Condo Tr | Permit type: Short form bldg permit | Expiration date: June 16, 2017 | Current use: 1-2fam | Permit id: Sf666413 | Parcel: 0400035000
2016/12/1614000100138 Chandler St Boston MaStephen Danner
SCORE
100
311315 Belgrade Av Roslindale Ma
Change occupancy from law office;to ;retail (mercantile) with 2 offices and;storage - no work to be done
Date:  January 13, 2017
Contractor: Stephen Danner

Client: Sevigny Paul J | Permit type: Long form/alteration permit | Expiration date: July 13, 2017 | Current use: Comm | Permit id: Alt665121 | Parcel: 2001396001
2017/01/130100311315 Belgrade Av Roslindale MaStephen Danner
SCORE
100
113 Marlborough St Boston Ma
Single family alt 79292 issued 6/17/2011
Date:  February 2, 2012
Contractor: Stephen Danner

Client: Sunshine Gabriel | Permit type: Certificate of occupancy | Current use: 1-2fam | Permit id: Coo105670 | Parcel: 0502711000
2012/02/020100113 Marlborough St Boston MaStephen Danner
SCORE
100
177 Newbury St Boston Ma
Retail- mercantile (3); dwelling units c/o-for retail- only alt 91681 issued ;8/1/11
Date:  November 14, 2011
Contractor: Stephen Danner

Client: Jamestown 177 Newbury St Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo103342 | Parcel: 0501374000
2011/11/140100177 Newbury St Boston MaStephen Danner
SCORE
100
177 Newbury St Boston Ma
Renovations to the basement and first floor of an existing mercantile space that will remain mercantile. Renovations will include fixtures and finishes. No exterior renovations. Re-work sprinkler system line.
Date:  September 12, 2011
Value:   $200,000
Contractor: Stephen Danner

Client: Jamestown 177 Newbury Lp | Permit type: Long form/alteration permit | Expiration date: March 12, 2012 | Current use: Comm | Permit id: Alt91681 | Parcel: 0501374000
2011/09/12200000100177 Newbury St Boston MaStephen Danner
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.