SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 15000-02421: bulletin 7 lighting in the ductwork in restrooms, add a soffit under ductwork, add a gas stub out on the roof. Date: February 25, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00128 | |||||
SCORE 93 1001 Page Mill Rd, Palo Alto, Ca 94304 Ti for existing tenant "baker botts" 2432 sf on second floor. Scope of work includes new offices and cubicle areas. No exterior work. Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-00414 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 15-2594: field clarification. Revised doors and walls. Mep changes to shop area. Shop structural wall. Mezzanine structural changes. Concrete platform at slide. Date: February 19, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00104 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 15-2594: revision includes commercial kitchen buildout for employees. Added scope includes commercial kitchen and dining buildiut, increase main permit valuation by 300k and collect associated fees. Date: February 19, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Approved with conditions | Permit id: 16rev-00103 | |||||
SCORE 93 Date: February 17, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00095 | |||||
SCORE 93 Date: February 9, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00083 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 15000-02421: revision to revise coffee island in the break room and associated mep. Scope of work also includes changes to 5th floor roof support. Date: February 5, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00073 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 15000-02421: minor architectural partition, lighting and millwork revision. Relocate mechanical unit location. Resize supporting beam for roof. Minor additional drain line. Date: January 20, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 16rev-00045 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 15000-02421: deferred submittal for slide from 5th floor to 4th floor Date: November 23, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00686 | |||||
SCORE 93 4 Hamilton Av, Palo Alto, Ca 94301 U&o and office office tenant improvement 9000sf for "cbre". Real estate firm to occupy 4th floor. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-03163 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 15-2594: revision includes commercial kitchen buildout for employees. Date: January 22, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00050 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 15000-02594: revise to extend shotcrete footing to reflect field conditions and tie footing into existing slab. 16-rev-0048 veronica tinoco Date: January 21, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00048 | |||||
SCORE 93 Date: December 21, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00758 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 15000-02421: clarifications to door and frame finishes, revise finish specifications, revise lighting layout, outlets, and title-24. Date: December 2, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00711 | |||||
SCORE 93 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02529 | |||||
SCORE 93 Date: November 12, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02993 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 15000-02421: add additional framing at the underside of the roof. No exterior changes Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00659 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 Houzz: ti and u&o for a tenant to occupy the entire 3rd, 4th, and 5th, floors. Scope of work includes new rooftop equipment Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02421 | |||||
SCORE 93 Date: September 17, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02470 | |||||
SCORE 93 Date: August 24, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02247 | |||||
SCORE 93 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02079 | |||||
SCORE 93 Date: June 12, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00342 | |||||
SCORE 93 Date: May 22, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00303 | |||||
SCORE 93 1841 Page Mill Rd, Palo Alto, Ca 94304 Tenant improvement for existing firm perkins coie. Convert 2 conference rooms into smaller offices and convert lobby to conference room. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01135 | |||||
SCORE 93 1001 Page Mill Rd B1, Palo Alto, Ca 94304 Sidley austin, llp building 1: commercial (e) tenant conversion of larger conference room into (2) offices, convert (1) copy room to office and copy room Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00757 | |||||
SCORE 93 Date: January 28, 2015 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00041 | |||||
SCORE 93 Date: October 20, 2014 Contractor: Skyline Commercial Interiors Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00638 | |||||
SCORE 93 1891 Page Mill Rd, Palo Alto, Ca 94304 Interior t. I. : office interior only tenent improvement ~100 sf for "gibson, dunn & crutcher, llp " on level 2. Tenent to occupy 2nd floor and 1881 page mill. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01504 | |||||
SCORE 93 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01826 | |||||
SCORE 93 24 Hanover St, Palo Alto, Ca 94304 T. I. For existing tenant "svb" to convert three existing offices into an employee breakroom on first floor. Approx 20 sq ft Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01692 | |||||
SCORE 93 24 Hanover St, Palo Alto, Ca 94304 T. I. For existing tenant "svb" to expand breakroom (coffee room) on second floor. Approx 10 sq ft Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01691 | |||||
SCORE 93 1891 Page Mill Rd, Palo Alto, Ca 94304 Commercial interior non-structural demo of entire second floor with exception of restrooms and stairwells approx 10,194 sq ft Date: May 6, 2014 Contractor: Skyline Commercial Interiors Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01072 | |||||
SCORE 93 1881 Page Mill Rd, Palo Alto, Ca 94304 Interior t. I. : 3116 sf on level 1 and 1532 sf on level 2, modifications include lunch room, copy room and private offices, associated mechanical and electrical Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03367 | |||||
SCORE 93 23 Geng Rd, Palo Alto, Ca 94303 Suite 100, magnet systems: ti and u&o for an 11,2 sf office on the first floor. U&o sent 12/10/15 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02332 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 15-2594: additional scope includes office buildout at 3 portage 6000sf. Revised valuation by 200,0 and collect associated fee. Date: March 10, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Revision-building permit | Permit status: In plan check | Permit id: 16rev-00169 | |||||
SCORE 93 14 Page Mill Rd, Palo Alto, Ca 94304 Ti for new tenant "infosys limited" phase 1 replacement of two interior stairs demo portion of slab to enlarge opening. New stadium seating. Structural review only. Build out to be under separate permit. Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-02619 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 Tenant improvement (48,0 sf) for warm shell. (11-2-15: city is currently investigating whether the site is subject to the citys newly adopted ground floor retail preservation ordinance (ordinance no. 5330).) no exterior work is proposed. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02594 | |||||
SCORE 93 531 Cowper St, Palo Alto, Ca 94301 T. I. And u&o for "bank of the west" (37 sf) on first floor; scope of work includes (n) partitions, mechanical, electrical and plumbing work and new structural work, (n) ac unit. U&o sent 12/10/15 Permit type: Project - building permit | Permit status: Finaled | Permit id: 15000-00029 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 Houzz: third floor remodel (2,585 sf) for existing tenant. Scope of work includes expanding third floor break room. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-02356 | |||||
SCORE 93 Unit 110 / 15 Page Mill Rd, Ste 110, Palo Alto, Ca 94304 Ti for existing tenant "reed smith" suite 110. Scope of work includes creating (3) new offices and a copy room within an existing space. 600sf Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-01158 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 15-2594: office layout revised associted plumbing, mechanical and electrical. Date: June 1, 2016 Contractor: Skyline Commercial Interiors Inc Permit type: Revision-building permit | Permit status: In plan check | Permit id: 16rev-00338 | |||||
SCORE 93 Date: January 28, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 15rev-00041 | |||||
SCORE 93 24 Hanover St, Palo Alto, Ca 94304 San Diego Ca T. I. For existing tenant "svb" to expand breakroom (coffee room) on second floor. Approx 10 sq ft Permit status: Permit issued | Permit id: 14000-01691 | |||||
SCORE 93 24 Hanover St, Palo Alto, Ca 94304 San Diego Ca T. I. For existing tenant "svb" to convert three existing offices into an employee breakroom on first floor. Approx 20 sq ft Permit status: Permit issued | Permit id: 14000-01692 | |||||
SCORE 93 Date: October 20, 2014 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 14rev-00638 | |||||
SCORE 93 531 Cowper St, Palo Alto, Ca 94301 San Diego Ca 15-29: revised interior walls associated ellectrical. Date: May 22, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 15rev-00303 | |||||
SCORE 93 1891 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Interior t. I. : office interior only tenent improvement ~100 sf for "gibson, dunn & crutcher, llp " on level 2. Tenent to occupy 2nd floor and 1881 page mill. Permit status: Permit issued | Permit id: 14000-01504 | |||||
SCORE 93 Permit status: Permit issued | Permit id: 14000-01826 | |||||
SCORE 93 1891 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Commercial interior non-structural demo of entire second floor with exception of restrooms and stairwells approx 10,194 sq ft Date: May 6, 2014 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 14000-01072 | |||||
SCORE 93 1881 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Interior t. I. : 3116 sf on level 1 and 1532 sf on level 2, modifications include lunch room, copy room and private offices, associated mechanical and electrical Permit status: Permit issued | Permit id: 13000-03367 | |||||
SCORE 93 1001 Page Mill Rd B1, Palo Alto, Ca 94304 San Diego Ca Sidley austin, llp building 1: commercial (e) tenant conversion of larger conference room into (2) offices, convert (1) copy room to office and copy room Permit status: Permit issued | Permit id: 15000-00757 | |||||
SCORE 93 Unit 100 / 2445 Faber Pl, Ste 100, Palo Alto, Ca 94303 San Diego Ca 17000-00371: revise use of conference room to office. Remove note for 1hr fire raiting of corridor. Date: March 13, 2017 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 17rev-00153 | |||||
SCORE 93 12 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Ti and u&o for tenant "machine zone" to occupy the entire 76,548 sf two story building (building # 3). No exterior work, no landscaping Permit status: Permit issued | Permit id: 17000-00537 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca New exterior tile over (e) parking garage at building exterior Permit status: Permit issued | Permit id: 16000-03131 | |||||
SCORE 93 Unit 100 / 2445 Faber Pl, Ste 100, Palo Alto, Ca 94303 San Diego Ca 17-371: revised location condensing unit under exterior stair. Date: March 15, 2017 Contractor: Skyline Commercial Interiors Inc Permit status: In plan check | Permit id: 17rev-00157 | |||||
SCORE 93 Date: June 12, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 15rev-00342 | |||||
SCORE 93 1841 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Tenant improvement for existing firm perkins coie. Convert 2 conference rooms into smaller offices and convert lobby to conference room. Permit status: Permit issued | Permit id: 15000-01135 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Tenant improvement to existing first floor lobby 321 sf interior only. Permit status: Approved | Permit id: 17000-02334 | |||||
SCORE 93 Unit 100 / 2445 Faber Pl, Ste 100, Palo Alto, Ca 94303 San Diego Ca Existing tenant "cascade" office tenant improvement 900sf includes new offices and associated mep. New rooftop unit. Permit status: Permit issued | Permit id: 17000-00371 | |||||
SCORE 93 1 Forest Av, Palo Alto, Ca 94301 San Diego Ca Costanoa ventures: ti existing tenant (22 sf), including demo existing partitions, ceiling and new accommodate 3 offices and 1 conference room Permit status: Permit issued | Permit id: 17000-00417 | |||||
SCORE 93 11 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Ti and u&o for tenant "machine zone" to occupy the entire 50,311 sf two story building (building # 2). No exterior work, no landscaping Permit status: Permit issued | Permit id: 17000-00536 | |||||
SCORE 93 1 Forest Av, Palo Alto, Ca 94301 San Diego Ca 17000-00417: revision to add accessibility inspection report Date: April 24, 2017 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 17rev-00248 | |||||
SCORE 93 703 High St, Palo Alto, Ca 94301 San Diego Ca Ti nand u&o for new tenant "costanoa ventures" scope of work includes new door between suites, new lighting. Area of work 2195 sf Permit status: Finaled | Permit id: 17000-00991 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Houzz: ti and u&o for a tenant to occupy the entire 3rd, 4th, and 5th, floors. Scope of work includes new rooftop equipment. "u&o sent 05 05 2017" Date: September 14, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Finaled | Permit id: 15000-02421 | |||||
SCORE 93 3975 E Bayshore Rd, Palo Alto, Ca 94303 San Diego Ca Kitty hawk: build new partition walls and new (2) doors around existing work area Permit status: Permit issued | Permit id: 17000-01005 | |||||
SCORE 93 11 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Building 2: cafe build out (16,387 sf) on the first floor for "machine zone". U&o submitted for the cafe build out. Scope of work includes new rooftop equipment. All utility demand reviewed under the shell permit. Permit status: Permit issued | Permit id: 17000-01040 | |||||
SCORE 93 14 Page Mill Rd, Palo Alto, Ca 94304 San Diego Ca Ti for new tenant "infosys limited" phase 1 replacement of two interior stairs demo portion of slab to enlarge opening. New stadium seating. Structural review only. Build out to be under separate permit. Permit status: In plan check | Permit id: 16000-02619 | |||||
SCORE 93 Unit 110 / 15 Page Mill Rd, Ste 110, Palo Alto, Ca 94304 San Diego Ca Ti for existing tenant "reed smith" suite 110. Scope of work includes creating (3) new offices and a copy room within an existing space. 600sf Permit status: Permit issued | Permit id: 16000-01158 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Houzz: third floor remodel (2,585 sf) for existing tenant. Scope of work includes expanding third floor break room. Permit status: Permit issued | Permit id: 16000-02356 | |||||
SCORE 93 4 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca U&o and office office tenant improvement 9000sf for "cbre". Real estate firm to occupy 4th floor."u&o sent 05 05 2017" Date: December 4, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Finaled | Permit id: 15000-03163 | |||||
SCORE 93 3 Portage Av, Palo Alto, Ca 94306 San Diego Ca U&o and tenant improvement (48,0 sf) for for "playground global" includes office buildouts for r&d tech firm at 3 & 3 portage. U&o sent 12 16 16 Date: September 30, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Finaled | Permit id: 15000-02594 | |||||
SCORE 93 23 Geng Rd, Palo Alto, Ca 94303 San Diego Ca Suite 100, magnet systems: ti and u&o for an 11,2 sf office on the first floor. U&o sent 12 10 15 Date: September 1, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Finaled | Permit id: 15000-02332 | |||||
SCORE 93 21 Geng Rd, Palo Alto, Ca 94303 San Diego Ca Ephox, suite 220: ti and u&o for a 3139 sf on the second floor. U&o sent 4 12 16 Date: August 7, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Finaled | Permit id: 15000-02079 | |||||
SCORE 93 531 Cowper St, Palo Alto, Ca 94301 San Diego Ca T. I. And u&o for "bank of the west" (37 sf) on first floor; scope of work includes (n) partitions, mechanical, electrical and plumbing work and new structural work, (n) ac unit. U&o sent 12 10 15 Date: January 5, 2015 Contractor: Skyline Commercial Interiors Inc Permit status: Finaled | Permit id: 15000-00029 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca 16000-03131: revise the sidewalk slope per public works requirements Date: July 31, 2017 Contractor: Skyline Commercial Interiors Inc Permit status: In plan check | Permit id: 17rev-00461 | |||||
SCORE 93 285 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Interior non structural demo for the 2nd floor 10212 sf Date: August 3, 2017 Contractor: Skyline Commercial Interiors Inc Permit status: Permit issued | Permit id: 17000-01842 |