Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 1616 Rhode Island Ave Nw, Washington, Dc 20036 Require 6: am to 9: extension to s curb lane to offload beams and have them lifted to the roof for the air-conditioning equipment. The early morning hours are the only reasonable time to get these long beams to the site without a major impact on rush hour traffic. Date: February 20, 2013 Contractor: Sheldon Williams Wiles Mensch Corporation Client: Hitt Contracting Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300360 | |||||
SCORE 71 23 I St Nw, Washington, Dc 20052 Continuing the interior renovation of the existing interior of ross hall that is the central physical plant for gwu and include the communication systems the heating and cooling systems and include testing and calibrating of all these infrastructure systems. Date: October 22, 2014 Contractor: Sheldon Williams Wiles Mensch Corporation Client: George Washington University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500045 | |||||
SCORE 71 23 I St Nw, Washington, Dc 20052 Final extension of an existing building permit#b1210355 to expire 5/14/15. Date: January 22, 2015 Contractor: Sheldon Williams Wiles Mensch Corporation Client: George Washington University | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1503721 | |||||
SCORE 71 8 22nd St Nw, Washington, Dc 20052 2nd extension of an existing building permit.#b1201357 to expire 7/10/15. Date: January 22, 2015 Contractor: Sheldon Williams Wiles Mensch Corporation Client: George Washington University | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1503720 |