Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 30 Porter St Nw, Washington, Dc 20008 Gsi plans to drill 5 soil borings to confirm soil strength with a hollow-stem auger equipped with a split spoon sampler for the spt n-value tests down to a maximum depth of feet below existing grades. The 5 borings will be drilled to the maximum depth or auger refusal, whichever occurs first. The bore holes dimension will be 2. 25 inches and shall be grouted upon completion. Date: March 25, 2015 Contractor: Saeed Fallah Geotechnical Solutions Inc Client: Haitam Arafat | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500226 |