Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 11818 Red Wood Rd Ne Redmond, Wa 98052 31-lot single phase line extension - feeding plat from existing j-box (226017-168062) across street from plat entrance. Existing empty conduit going across woodinville-redmond road ne will be used for new primary cable. Date: January 5, 2015 Contractor: Roberta Marta Permit type: Right of way | Permit id: Row-2014-08733 | Parcel: 9428500070 | |||||
SCORE 59 5364 E Lk Sammamish Pkwy Redmond, Wa 98052 1) secondary wire removal from on-site secondary pole to p02 (224201-168974). Located on the west side of east lake sammamish parkway located within the right-of-way2) trenching for primary conduit installation and riser on existing power pole located on the west side of east lake sammamish parkway near the address of 5364 east lake sammamish parkway. Approximately 65 feet of trenching and conduit installation across east lake sammamish within the right-of-way. Primary wire pull and plat connection. Date: March 24, 2015 Contractor: Roberta Marta Permit type: Right of way | Permit id: Row-2015-01785 | Parcel: 1825069049 |