Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 1905 West Virginia Ave Ne, Washington, Dc 20002 Dccr proposes one geotechnical boring, nebbc-03, located at the government of the district of columbias, vehicle maintenance complex at 1905 west virginia ave. Ne. The boring will be 6 inches diameter and 177 feet deep. A monitoring well will be installed at 1 feet below ground surface. A vibrating wire piezometer will be installed at approximately feet below ground surface. Foot screened interval will allow for greater representation of site characteristics. The boring will be drilled using mud rotary or hollow stem auger methods, msds for drilling mud additives attached. See idw management plan and attached schematics for additional information. Well development will be by air-lift and surge-block methods. Development water will be drummed for appropriate off-site disposal. Date: May 9, 2014 Client: Robert Garrett District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400298 |