SCORE 89 3 S 42nd St Boulder Co Installation of a flush mount, grid-tied, 7. 85 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawings for specific information. Date: June 24, 2014 Contractor: Photon Brothers Client: Street 42nd | Applicant: Photon Brothers | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Single family d | |||||
SCORE 89 Date: October 16, 2014 Contractor: Photon Brothers Client: Susan Sullivan-Lefton | Applicant: Photon Brothers | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 21, 2015 | Current use: Single family a | |||||
SCORE 89 Client: Benjamin Collett | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 27, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-00580 | |||||
SCORE 89 606 Dewey Av Boulder Co New pv system that is grid-tied and flush mounted and located on a detached garage. 1. 5 kw Client: Janet Collett | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 27, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-00581 | |||||
SCORE 89 145 Cherokee Wy Boulder Co Installation of a flush mount 6. 867 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved under this permit. Contractor to maintain min. 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch min. Pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Client: Lauren Wilkinson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 2, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-00968 | |||||
SCORE 89 5 Ithaca Dr Boulder Co Installation of a 7. 848 kw grid tied flush mount pv system on the roof of a single family dwelling in two arrays. Client: Allister Lam | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 27, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-01401 | |||||
SCORE 89 2901 5th St Boulder Co Installation of a 3. 685 kw flush mount grid tied pv system on the roof of a single family detached dwelling in two arrays. Client: Jonathan Bocina | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 30, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02662 | |||||
SCORE 89 2318 17th St Boulder Co Installation of a 3 kw flush mount grid tied pv system on the roof of a single family detached dwelling in two arrays. Modification 7 7 16 - system size decreased to 2. 75 kw Client: Paul Mcloughlin | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 14, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02664 | |||||
SCORE 89 36 Paonia St Boulder Co Installation of rooftop, flushmounted, grid-tied, ballasted, 2 kw, photovoltaic solar energy system on residence. Client: Kathleen Weigand | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-03324 | |||||
SCORE 89 38 Telluride Pl Boulder Co Installation of a 6. 48 kw grid tied flush mount pv system on the roof of a townhome unit in one array. Client: Gina Martyn | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 23, 2016 | Current use: Single family attached dwelling, existin | Permit id: Pmt2016-04952 | |||||
SCORE 89 5077 Gallatin Pl Boulder Co Installation of a 5. 5 kw grid tied flush mount pv system on the roof of a single family detached dwelling in one array. Client: Kristen Royer | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-05192 | |||||
SCORE 89 3 S 42nd St Boulder Co Installation of a flush mount, grid-tied, 7. 85 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawings for specific information. Client: Street | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-02979 | |||||
SCORE 89 Client: Susan Sullivan-Lefton | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 21, 2015 | Current use: Single family attached dwelling, existin | Permit id: Pmt2014-04760 | |||||
SCORE 89 Client: Imtiaz Rangwala | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 3, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-04699 | |||||
SCORE 89 38 Telluride Pl Boulder Co Installation of a 6. 12 kw grid tied flush mount pv system on the roof of a single family detached dwelling in one array. Client: Rainer Volkamer | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-01790 | |||||
SCORE 89 803 Ithaca Dr Boulder Co Installation of a flush mount 4 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Ronald Clement | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-00736 | |||||
SCORE 89 2855 Links Dr Boulder Co Installation of a 4. 8 kw flush mount grid tied pv system on the roof of a single family detached dwelling in one array. Client: Edward Ross | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 13, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-00170 | |||||
SCORE 89 17 Yellow Pine Av Boulder Co Installation of a 3. 27 kw flush mount grid tied pv system on the roof of a single family dwelling in two arrays. Client: Michelle Stephens | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-03610 | |||||
SCORE 89 36 Endicott Dr Boulder Co Installation of a 6 kw flush mount grid tied pv system on the roof of a single family detached dwelling in one array. Scope also includes an upgrade of the electrical service to 2 amps. Client: Eric Baer | Permit type: Electrical, photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-04477 | |||||
SCORE 89 Date: October 18, 2016 Contractor: Photon Brothers Permit type: Solar electrical system | Permit status: Final review queue | Completion date: April 18, 2017 | Permit id: Bp-16-2159 | |||||
SCORE 89 4239 Niblick Drive Longmont Co Solar pv system 7. 02kw flush roof mounted, grid tied. System changed from 7. 02kw to 6. 89kw Permit type: Solar electrical system | Permit status: Permit complete | Completion date: March 25, 2015 | Permit id: Bp-14-2290 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Ready to issue | Permit id: Bp-15-2618 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: April 13, 2016 | Permit id: Bp-16-0381 | |||||
SCORE 89 Permit type: Electrical service change | Permit status: Application withdrawn | Permit id: Bp-16-0821 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: June 15, 2016 | Permit id: Bp-16-0822 | |||||
SCORE 89 Permit type: Residential roof mounted solar electrical system | Permit status: Permit issued | Permit id: Bp-17-0911 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: October 16, 2014 | Permit id: Bp-14-1521 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: October 28, 2016 | Permit id: Bp-16-1915 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Electrical plan check hol | Permit id: Bp-17-0122 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Final review queue | Completion date: September 28, 2016 | Permit id: Bp-16-1390 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Final review queue | Completion date: August 23, 2016 | Permit id: Bp-16-1438 | |||||
SCORE 89 Date: July 14, 2017 Contractor: Photon Brothers Permit type: Residential roof mounted solar electrical system | Permit status: Permit complete | Completion date: October 26, 2017 | Permit id: Bp-17-1442 | |||||
SCORE 89 Permit type: Solar electrical system | Permit status: Permit issued | Permit id: Bp-17-1824 | |||||
SCORE 89 Permit type: Residential roof mounted solar electrical system | Permit status: Permit complete | Completion date: October 18, 2017 | Permit id: Bp-17-1923 | |||||
SCORE 89 Date: October 12, 2017 Contractor: Photon Brothers Permit type: Residential roof mounted solar electrical system | Permit status: Permit issued | Permit id: Bp-17-2152 | |||||
SCORE 89 Date: October 20, 2017 Contractor: Photon Brothers Permit type: Residential roof mounted solar electrical system | Permit status: Permit issued | Permit id: Bp-17-2224 | |||||
SCORE 89 Permit type: Residential roof mounted solar electrical system | Permit status: Permit issued | Permit id: Bp-17-2247 |