Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 5247 Wisconsin Ave Nw, Washington, Dc 20015 Work includes excavating a 4-ft wide minimum and 510-ft long trench to install 138 kv transmission line pipes in wisconsin avenue nw between jenifer street nw and ingomar street nw. This phase is part of pepcos active and ongoing project to upgrade 138 kv transmission lines between little falls parkway in maryland and van ness substation in nw dc. ![]() ![]() Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500546 |