SCORE 61 19 1st St Sw, Washington, Dc 20024 Work includes relocating about 16 ft underground 230kv transmission line in suitland parkway se from south capitol street se overpass bridge to about 3 ft east of firth sterling ave. Se as well as accessing existing manholes number 3, 4, 5 and 6 along suitland parkway se to recertify the existing underground pipes. Date: June 19, 2014 Contractor: Pepco; Stantec Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400527 | |||||
SCORE 61 19 1st St Sw, Washington, Dc 20024 Work includes relocating about 16 ft underground 230kv transmission line in suitland parkway se from south capitol street se overpass bridge to about 3 ft east of firth sterling ave. As well as accessing existing manholes number 3, 4, 5 and 6 along suitland parkway se to splice cables and recertify feeders. Date: September 23, 2014 Contractor: Pepco; Stantec Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400707 | |||||
SCORE 61 59 East Capitol St Ne, Washington, Dc 20019 Work includes excavating an approximately 5 ft wide and ft long trench in order to access the existing underground transmission line to inspect and repair any damaged portion of the pipe. The existing line is in right lane of east capitol street ne westbound. Date: May 16, 2014 Contractor: Pepco; Stantec Client: Pepco | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400466 |