SCORE 59 21 Pennsylvania Ave Nw 22nd St Si, Washington, Dc 20037 Remove and replace all sidewalk on east side of 22nd st, between penn ave and eye street. Work starts just south of building line, ddot has done corner at penn ave, and works south to the corner of eye street. Curb and gutter are not being replaced. Street lamps are being removed and upgraded replacements. Mfa drive lane will not be redone and will remain open during construction. Tree boxes will be replaced and brought up to to correct standards. Date: October 29, 2014 Client: George Washington University | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1500008 | |||||
SCORE 59 9 23rd St Nw, Washington, Dc 20037 Remove and replace sidewalk between the south side of the emergency drive lane of the gw hospital, 23rd st between washington circle and eye st nw, west side of street, moving south to the end of the building line, just north of the foggy bottom metro entrance. The hospital drive lanes will not be replaced, nor will they be closed at anytime during construction. We are not replacing curb and gutter. We are enlarging tree boxes, and replacing street lamps. Date: December 2, 2014 Client: George Washington University | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1500007 |