Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 3 Laramie Bl Boulder Co Installation of a flush mount grid-tie 9. 86 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: March 20, 2012 Contractor: Namaste Solar Client: Kurt Schrammel, Schrammel | Applicant: Namaste Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 3, 2012 | Current use: Single family d |