SCORE

MOEIN LAK

ABOUT MOEIN LAK

Moein Lak specializes in:

Moein Lak offers services:

Based on the information received from , associated with Moein Lak over the past .

If you are considering hiring Moein Lak for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Moein Lak has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
New rooftop pv system for an existing single family dwelling. Inverte
Date:  June 11, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-139
2013/06/11082Moein Lak
SCORE
82
Pv1 single family dwelling total system size 5kw using 25 modules. Cen
Date:  July 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-203
2013/07/31082Moein Lak
SCORE
82
Pv1 for single family dwelling. Total system size: 11. 22 kw. 44 module
Date:  August 13, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-151
2013/08/13082Moein Lak
SCORE
82
Pv1 plan check for pv single family. 8. 2kw system. 33 panels and 1 inv
Date:  August 13, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-157
2013/08/13082Moein Lak
SCORE
82
Pv1 single family dwelling. Total system size 3. 8 kw using 18 modules
Date:  September 20, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-222
2013/09/20082Moein Lak
SCORE
82
Pv1 transformerless system. 3 strings for 1 inverter. 4. 2kwac
Date:  October 11, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-260
2013/10/11082Moein Lak
SCORE
82
Pv1 transformerless system. Using solar optimizers. Total sysyem size
Date:  October 22, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288
2013/10/22082Moein Lak
SCORE
82
Pv1 transformerless system. Total system size 11. 73. 46 modules and 2
Date:  October 22, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288
2013/10/22082Moein Lak
SCORE
82
Pv2 commercial installation. Total system size 33kw. 132 modules and 3
Date:  October 30, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-295
2013/10/30082Moein Lak
SCORE
82
Pv1 central inverter standard plan.
Date:  December 17, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350
2013/12/17082Moein Lak
SCORE
82
Pv1 transformerless inverter. Using solar optimizers. Total system siz
Date:  December 17, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328
2013/12/17082Moein Lak
SCORE
82
Pv1 central inverter system with four strings. Total system size 9. 36k
Date:  December 17, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328
2013/12/17082Moein Lak
SCORE
82
New rooftop pv system using dc-dc converters. System is ungrounded.
Date:  December 19, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/19082Moein Lak
SCORE
82
Electrical
Date:  December 19, 2013
Contractor: Moein Lak

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350
2013/12/19082Moein Lak
SCORE
82
Pv1 transformerless system with optimizers. Total system size 4. 16kw.
Date:  December 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/31082Moein Lak
SCORE
82
New rooftop pv system for an existing sfr. System uses dc-dc converte
Date:  December 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/31082Moein Lak
SCORE
82
New rooftop pv system using dc-dc converters for an existing single fa
Date:  December 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/31082Moein Lak
SCORE
82
New 8. 5kw rooftop pv system for an existing single family dwelling. S
Date:  January 10, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/10082Moein Lak
SCORE
82
New rooftop pv system with dc/dc converters. System is ungrounded.
Date:  January 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/22082Moein Lak
SCORE
82
Pv1 transformerless system. Using optimizers. Total system size 5. 0kwa
Date:  January 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/22082Moein Lak
SCORE
82
Pv1, roof-mounted solar installation, interconnecting with main servic
Date:  February 12, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040
2014/02/12082Moein Lak
SCORE
82
Pv1 transformerless system . Total system size 5. 0kwac wtih solar optim
Date:  March 21, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062
2014/03/21082Moein Lak
SCORE
82
Pv1 transformerless system. Total system size 6. 0kwac
Date:  March 21, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/03/21082Moein Lak
SCORE
82
Pv1. Roof mounted solar system. Standard transformer inverter. System
Date:  March 26, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080
2014/03/26082Moein Lak
SCORE
82
Pv1. Roofmounted solar system. Transformerless standard plan. System s
Date:  March 26, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080
2014/03/26082Moein Lak
SCORE
82
Pv1 transformerless system. 38 modules and 2 inverter
Date:  April 3, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/04/03082Moein Lak
SCORE
82
Roof pv system with system size 7. 28kw.
Date:  April 3, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/04/03082Moein Lak
SCORE
82
Pv1 transformerless system. Total system size 12. 0kwac permit fee
Date:  April 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062
2014/04/09082Moein Lak
SCORE
82
Electrical
Date:  April 21, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104
2014/04/21082Moein Lak
SCORE
82
Pv1 roof mounted solar sysem 8. 32kw interconnect with main panel. (2)
Date:  May 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-124
2014/05/09082Moein Lak
SCORE
82
Changes from previously approved plans. Change include one additional
Date:  May 21, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20001-040
2014/05/21082Moein Lak
SCORE
82
Pv1. Roof mounted solar system. Standard transformerless central inve
Date:  May 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-115
2014/05/22082Moein Lak
SCORE
82
Pv1. Install 7. 8 kw roof-mounted utility-interactive pv system. Tran
Date:  May 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137
2014/05/22082Moein Lak
SCORE
82
Pv1. Install 6. 88 kw roof-mounted, utility-interactive pv system. Tr
Date:  June 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/09082Moein Lak
SCORE
82
Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Tra
Date:  June 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/09082Moein Lak
SCORE
82
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  June 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/09082Moein Lak
SCORE
82
Pv1 central transformerless inverter standard plan install roof-mounte
Date:  June 11, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/11082Moein Lak
SCORE
82
Pv1 install roof mounted pv system sized 7. 2kw interconnected with msp
Date:  June 19, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165
2014/06/19082Moein Lak
SCORE
82
Pv1. Install 13. 52 kw roof-mounted, utility-interactive pv system. (
Date:  July 8, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/08082Moein Lak
SCORE
82
Pv1. Install 8. 32 kw roof-mounted, utility-interactive pv system. Tr
Date:  July 8, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/08082Moein Lak
SCORE
82
Pv1. Install 6. 5 kw roof-mounted, utility-interactive pv system. Tra
Date:  July 8, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/08082Moein Lak
SCORE
82
New roof mounted pv system with total system size 6kw .
Date:  July 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185
2014/07/09082Moein Lak
SCORE
82
Pv1 install roof mounted solar array on sfd. System size: 3. 8kw (1) so
Date:  July 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185
2014/07/09082Moein Lak
SCORE
82
10694 Somma Way Los Angeles Ca 90077
Pv1 for single family dwelling. Total system size: 11. 22 kw. 44 module
Date:  August 13, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-151
2013/08/1308210694 Somma Way Los Angeles Ca 90077Moein Lak
SCORE
82
17054 Cantara St Los Angeles Ca 91406
Pv1. Install 6. 88 kw roof-mounted, utility-interactive pv system. Tr
Date:  June 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/0908217054 Cantara St Los Angeles Ca 91406Moein Lak
SCORE
82
3304 Bellevue Ave Los Angeles Ca 90026
Pv1 transformerless system. Using optimizers. Total system size 5. 0kwa
Date:  January 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/220823304 Bellevue Ave Los Angeles Ca 90026Moein Lak
SCORE
82
4537 Tenango Dr Los Angeles Ca 91364
Pv1. Install 13. 52 kw roof-mounted, utility-interactive pv system. (
Date:  July 8, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/080824537 Tenango Dr Los Angeles Ca 91364Moein Lak
SCORE
82
8938 Cadillac Ave Los Angeles Ca 90034
Pv1. Roofmounted solar system. Transformerless standard plan. System s
Date:  March 26, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080
2014/03/260828938 Cadillac Ave Los Angeles Ca 90034Moein Lak
SCORE
82
18001 Terrafina St Los Angeles Ca 91344
Pv1 install roof mounted pv system sized 7. 2kw interconnected with msp
Date:  June 19, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165
2014/06/1908218001 Terrafina St Los Angeles Ca 91344Moein Lak
SCORE
82
3244 Greenfield Ave Los Angeles Ca 90034
Pv1. Roof mounted solar system. Standard transformer inverter. System
Date:  March 26, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080
2014/03/260823244 Greenfield Ave Los Angeles Ca 90034Moein Lak
SCORE
82
16454 Knollwood Dr Los Angeles Ca 91344
Pv1 transformerless system. Total system size 11. 73. 46 modules and 2
Date:  October 22, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288
2013/10/2208216454 Knollwood Dr Los Angeles Ca 91344Moein Lak
SCORE
82
5809 Melvin Ave Los Angeles Ca 91356
Pv1 transformerless system. 38 modules and 2 inverter
Date:  April 3, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/04/030825809 Melvin Ave Los Angeles Ca 91356Moein Lak
SCORE
82
7054 Tunney Ave Los Angeles Ca 91335
Pv1 single family dwelling total system size 5kw using 25 modules. Cen
Date:  July 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-203
2013/07/310827054 Tunney Ave Los Angeles Ca 91335Moein Lak
SCORE
82
6948 Tobias Ave Los Angeles Ca 91405
Changes from previously approved plans. Change include one additional
Date:  May 21, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20001-040
2014/05/210826948 Tobias Ave Los Angeles Ca 91405Moein Lak
SCORE
82
3245 Castle Heights Ave Los Angeles Ca 90034
Pv1. Roof mounted solar system. Standard transformerless central inve
Date:  May 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-115
2014/05/220823245 Castle Heights Ave Los Angeles Ca 90034Moein Lak
SCORE
82
7906 Melita Ave Los Angeles Ca 91605
New 8. 5kw rooftop pv system for an existing single family dwelling. S
Date:  January 10, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/100827906 Melita Ave Los Angeles Ca 91605Moein Lak
SCORE
82
7412 Dorie Dr Los Angeles Ca 91304
Pv1 plan check for pv single family. 8. 2kw system. 33 panels and 1 inv
Date:  August 13, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-157
2013/08/130827412 Dorie Dr Los Angeles Ca 91304Moein Lak
SCORE
82
3304 Bellevue Ave Los Angeles Ca 90026
New rooftop pv system for an existing sfr. System uses dc-dc converte
Date:  December 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/310823304 Bellevue Ave Los Angeles Ca 90026Moein Lak
SCORE
82
17734 Mayerling St Los Angeles Ca 91344
Pv1. Install 7. 8 kw roof-mounted utility-interactive pv system. Tran
Date:  May 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137
2014/05/2208217734 Mayerling St Los Angeles Ca 91344Moein Lak
SCORE
82
12133 Bellando Ct Los Angeles Ca 91344
Pv1 roof mounted solar sysem 8. 32kw interconnect with main panel. (2)
Date:  May 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-124
2014/05/0908212133 Bellando Ct Los Angeles Ca 91344Moein Lak
SCORE
82
Date:  December 19, 2013
Contractor: Moein Lak

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350
2013/12/1908253 Neal Dr Los Angeles Ca 90041Moein Lak
SCORE
82
109 Walnut Dr Los Angeles Ca 91040
Pv1 transformerless system. Total system size 12. 0kwac permit fee
Date:  April 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062
2014/04/09082109 Walnut Dr Los Angeles Ca 91040Moein Lak
SCORE
82
4811 Adele Ct Los Angeles Ca 91364
Pv1 transformerless system. Using solar optimizers. Total sysyem size
Date:  October 22, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288
2013/10/220824811 Adele Ct Los Angeles Ca 91364Moein Lak
SCORE
82
167 Rinaldi St Los Angeles Ca 91344
Pv1 transformerless system. 3 strings for 1 inverter. 4. 2kwac
Date:  October 11, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-260
2013/10/11082167 Rinaldi St Los Angeles Ca 91344Moein Lak
SCORE
82
5909 Wilkinson Ave Los Angeles Ca 91607
Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Tra
Date:  June 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/090825909 Wilkinson Ave Los Angeles Ca 91607Moein Lak
SCORE
82
Date:  May 23, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-138
2014/05/230823112 Boulder St Los Angeles Ca 90063Moein Lak
SCORE
82
4038 Stone Canyon Ave Los Angeles Ca 91403
Pv1, roof-mounted solar installation, interconnecting with main servic
Date:  February 12, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040
2014/02/120824038 Stone Canyon Ave Los Angeles Ca 91403Moein Lak
SCORE
82
10361 Sophia Ave Los Angeles Ca 91344
Roof pv system with system size 7. 28kw.
Date:  April 3, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/04/0308210361 Sophia Ave Los Angeles Ca 91344Moein Lak
SCORE
82
18942 Plummer St Los Angeles Ca 91324
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  June 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/0908218942 Plummer St Los Angeles Ca 91324Moein Lak
SCORE
82
6948 Tobias Ave Los Angeles Ca 91405
Pv1, roof-mounted solar installation, interconnecting with main servic
Date:  February 12, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040
2014/02/120826948 Tobias Ave Los Angeles Ca 91405Moein Lak
SCORE
82
Date:  April 21, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104
2014/04/2108215718 Kadota St Los Angeles Ca 91342Moein Lak
SCORE
82
12641 Presnell St Los Angeles Ca 90066
Pv1 central inverter system with four strings. Total system size 9. 36k
Date:  December 17, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328
2013/12/1708212641 Presnell St Los Angeles Ca 90066Moein Lak
SCORE
82
6358 Nancy St Los Angeles Ca 90045
Pv1 transformerless system with optimizers. Total system size 4. 16kw.
Date:  December 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/310826358 Nancy St Los Angeles Ca 90045Moein Lak
SCORE
82
53 Neal Dr Los Angeles Ca 90041
Pv1 central inverter standard plan.
Date:  December 17, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350
2013/12/1708253 Neal Dr Los Angeles Ca 90041Moein Lak
SCORE
82
Date:  April 21, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104
2014/04/210824038 Stone Canyon Ave Los Angeles Ca 91403Moein Lak
SCORE
82
17816 Sidwell St Los Angeles Ca 91344
Pv1 transformerless system. Total system size 6. 0kwac
Date:  March 21, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/03/2108217816 Sidwell St Los Angeles Ca 91344Moein Lak
SCORE
82
7506 Summitrose St Los Angeles Ca 91042
Pv1 central transformerless inverter standard plan install roof-mounte
Date:  June 11, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/110827506 Summitrose St Los Angeles Ca 91042Moein Lak
SCORE
82
2987 Ingledale Ter Los Angeles Ca 90039
Pv1 single family dwelling. Total system size 3. 8 kw using 18 modules
Date:  September 20, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-222
2013/09/200822987 Ingledale Ter Los Angeles Ca 90039Moein Lak
SCORE
82
29 Danalda Dr Los Angeles Ca 90064
New rooftop pv system for an existing single family dwelling. Inverte
Date:  June 11, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-139
2013/06/1108229 Danalda Dr Los Angeles Ca 90064Moein Lak
SCORE
82
2421 Nalin Dr Los Angeles Ca 90077
Pv1 transformerless system . Total system size 5. 0kwac wtih solar optim
Date:  March 21, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062
2014/03/210822421 Nalin Dr Los Angeles Ca 90077Moein Lak
SCORE
82
11201 Ravenna Lane Los Angeles Ca 91326
New roof mounted pv system with total system size 6kw .
Date:  July 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185
2014/07/0908211201 Ravenna Lane Los Angeles Ca 91326Moein Lak
SCORE
82
6611 Valjean Ave Los Angeles Ca 91406
Pv2 commercial installation. Total system size 33kw. 132 modules and 3
Date:  October 30, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-295
2013/10/300826611 Valjean Ave Los Angeles Ca 91406Moein Lak
SCORE
82
12522 Milbank St Los Angeles Ca 91604
Pv1 transformerless inverter. Using solar optimizers. Total system siz
Date:  December 17, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328
2013/12/1708212522 Milbank St Los Angeles Ca 91604Moein Lak
SCORE
82
Date:  May 23, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137
2014/05/230822825 8th Ave Los Angeles Ca 90018Moein Lak
SCORE
82
9145 Balcom Ave Los Angeles Ca 91325
Pv1. Install 6. 5 kw roof-mounted, utility-interactive pv system. Tra
Date:  July 8, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/080829145 Balcom Ave Los Angeles Ca 91325Moein Lak
SCORE
82
11593 Kling St Los Angeles Ca 91602
Pv1. Install 8. 32 kw roof-mounted, utility-interactive pv system. Tr
Date:  July 8, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/0808211593 Kling St Los Angeles Ca 91602Moein Lak
SCORE
82
10601 Valjean Ave Los Angeles Ca 91344
Pv1 install roof mounted solar array on sfd. System size: 3. 8kw (1) so
Date:  July 9, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185
2014/07/0908210601 Valjean Ave Los Angeles Ca 91344Moein Lak
SCORE
82
5152 Topanga Canyon Blvd Los Angeles Ca 91364
New rooftop pv system using dc-dc converters for an existing single fa
Date:  December 31, 2013
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/310825152 Topanga Canyon Blvd Los Angeles Ca 91364Moein Lak
SCORE
82
5333 Ventura Canyon Ave Los Angeles Ca 91401
New rooftop pv system with dc/dc converters. System is ungrounded.
Date:  January 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/220825333 Ventura Canyon Ave Los Angeles Ca 91401Moein Lak
SCORE
82
3304 Bellevue Ave Los Angeles Ca 90026 San Diego Ca
Pv1 transformerless system. Using optimizers. Total system size 5. 0kwa
Date:  January 22, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/220823304 Bellevue Ave Los Angeles Ca 90026 San Diego CaMoein Lak
SCORE
82
10694 Somma Way Los Angeles Ca 90077 San Diego Ca
Pv1 for single family dwelling. Total system size: 11. 22 kw. 44 module
Date:  August 13, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-151
2013/08/1308210694 Somma Way Los Angeles Ca 90077 San Diego CaMoein Lak
SCORE
82
17054 Cantara St Los Angeles Ca 91406 San Diego Ca
Pv1. Install 6. 88 kw roof-mounted, utility-interactive pv system. Tr
Date:  June 9, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/0908217054 Cantara St Los Angeles Ca 91406 San Diego CaMoein Lak
SCORE
82
4038 Stone Canyon Ave Los Angeles Ca 91403 San Diego Ca
Pv1, roof-mounted solar installation, interconnecting with main servic
Date:  February 12, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040
2014/02/120824038 Stone Canyon Ave Los Angeles Ca 91403 San Diego CaMoein Lak
SCORE
82
10361 Sophia Ave Los Angeles Ca 91344 San Diego Ca
Roof pv system with system size 7. 28kw.
Date:  April 3, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/04/0308210361 Sophia Ave Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
18942 Plummer St Los Angeles Ca 91324 San Diego Ca
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  June 9, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/0908218942 Plummer St Los Angeles Ca 91324 San Diego CaMoein Lak
SCORE
82
6948 Tobias Ave Los Angeles Ca 91405 San Diego Ca
Pv1, roof-mounted solar installation, interconnecting with main servic
Date:  February 12, 2014
Contractor: Moein Lak

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040
2014/02/120826948 Tobias Ave Los Angeles Ca 91405 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104
2014/04/2108215718 Kadota St Los Angeles Ca 91342 San Diego CaMoein Lak
SCORE
82
12641 Presnell St Los Angeles Ca 90066 San Diego Ca
Pv1 central inverter system with four strings. Total system size 9. 36k
Date:  December 17, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328
2013/12/1708212641 Presnell St Los Angeles Ca 90066 San Diego CaMoein Lak
SCORE
82
6358 Nancy St Los Angeles Ca 90045 San Diego Ca
Pv1 transformerless system with optimizers. Total system size 4. 16kw.
Date:  December 31, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/310826358 Nancy St Los Angeles Ca 90045 San Diego CaMoein Lak
SCORE
82
53 Neal Dr Los Angeles Ca 90041 San Diego Ca
Pv1 central inverter standard plan.
Date:  December 17, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350
2013/12/1708253 Neal Dr Los Angeles Ca 90041 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104
2014/04/210824038 Stone Canyon Ave Los Angeles Ca 91403 San Diego CaMoein Lak
SCORE
82
17816 Sidwell St Los Angeles Ca 91344 San Diego Ca
Pv1 transformerless system. Total system size 6. 0kwac
Date:  March 21, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/03/2108217816 Sidwell St Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
7506 Summitrose St Los Angeles Ca 91042 San Diego Ca
Pv1 central transformerless inverter standard plan install roof-mounte
Date:  June 11, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/110827506 Summitrose St Los Angeles Ca 91042 San Diego CaMoein Lak
SCORE
82
2987 Ingledale Ter Los Angeles Ca 90039 San Diego Ca
Pv1 single family dwelling. Total system size 3. 8 kw using 18 modules
Date:  September 20, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-222
2013/09/200822987 Ingledale Ter Los Angeles Ca 90039 San Diego CaMoein Lak
SCORE
82
29 Danalda Dr Los Angeles Ca 90064 San Diego Ca
New rooftop pv system for an existing single family dwelling. Inverte
Date:  June 11, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-139
2013/06/1108229 Danalda Dr Los Angeles Ca 90064 San Diego CaMoein Lak
SCORE
82
2421 Nalin Dr Los Angeles Ca 90077 San Diego Ca
Pv1 transformerless system . Total system size 5. 0kwac wtih solar optim
Date:  March 21, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062
2014/03/210822421 Nalin Dr Los Angeles Ca 90077 San Diego CaMoein Lak
SCORE
82
5333 Ventura Canyon Ave Los Angeles Ca 91401 San Diego Ca
New rooftop pv system with dc dc converters. System is ungrounded.
Date:  January 22, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/220825333 Ventura Canyon Ave Los Angeles Ca 91401 San Diego CaMoein Lak
SCORE
82
11201 Ravenna Lane Los Angeles Ca 91326 San Diego Ca
New roof mounted pv system with total system size 6kw .
Date:  July 9, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185
2014/07/0908211201 Ravenna Lane Los Angeles Ca 91326 San Diego CaMoein Lak
SCORE
82
6611 Valjean Ave Los Angeles Ca 91406 San Diego Ca
Pv2 commercial installation. Total system size 33kw. 132 modules and 3
Date:  October 30, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-295
2013/10/300826611 Valjean Ave Los Angeles Ca 91406 San Diego CaMoein Lak
SCORE
82
12522 Milbank St Los Angeles Ca 91604 San Diego Ca
Pv1 transformerless inverter. Using solar optimizers. Total system siz
Date:  December 17, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328
2013/12/1708212522 Milbank St Los Angeles Ca 91604 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137
2014/05/230822825 8th Ave Los Angeles Ca 90018 San Diego CaMoein Lak
SCORE
82
9145 Balcom Ave Los Angeles Ca 91325 San Diego Ca
Pv1. Install 6. 5 kw roof-mounted, utility-interactive pv system. Tra
Date:  July 8, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/080829145 Balcom Ave Los Angeles Ca 91325 San Diego CaMoein Lak
SCORE
82
11593 Kling St Los Angeles Ca 91602 San Diego Ca
Pv1. Install 8. 32 kw roof-mounted, utility-interactive pv system. Tr
Date:  July 8, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/0808211593 Kling St Los Angeles Ca 91602 San Diego CaMoein Lak
SCORE
82
10601 Valjean Ave Los Angeles Ca 91344 San Diego Ca
Pv1 install roof mounted solar array on sfd. System size: 3. 8kw (1) so
Date:  July 9, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185
2014/07/0908210601 Valjean Ave Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
4537 Tenango Dr Los Angeles Ca 91364 San Diego Ca
Pv1. Install 13. 52 kw roof-mounted, utility-interactive pv system. (
Date:  July 8, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175
2014/07/080824537 Tenango Dr Los Angeles Ca 91364 San Diego CaMoein Lak
SCORE
82
8938 Cadillac Ave Los Angeles Ca 90034 San Diego Ca
Pv1. Roofmounted solar system. Transformerless standard plan. System s
Date:  March 26, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080
2014/03/260828938 Cadillac Ave Los Angeles Ca 90034 San Diego CaMoein Lak
SCORE
82
18001 Terrafina St Los Angeles Ca 91344 San Diego Ca
Pv1 install roof mounted pv system sized 7. 2kw interconnected with msp
Date:  June 19, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165
2014/06/1908218001 Terrafina St Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
3244 Greenfield Ave Los Angeles Ca 90034 San Diego Ca
Pv1. Roof mounted solar system. Standard transformer inverter. System
Date:  March 26, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080
2014/03/260823244 Greenfield Ave Los Angeles Ca 90034 San Diego CaMoein Lak
SCORE
82
16454 Knollwood Dr Los Angeles Ca 91344 San Diego Ca
Pv1 transformerless system. Total system size 11. 73. 46 modules and 2
Date:  October 22, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288
2013/10/2208216454 Knollwood Dr Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
5809 Melvin Ave Los Angeles Ca 91356 San Diego Ca
Pv1 transformerless system. 38 modules and 2 inverter
Date:  April 3, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068
2014/04/030825809 Melvin Ave Los Angeles Ca 91356 San Diego CaMoein Lak
SCORE
82
7054 Tunney Ave Los Angeles Ca 91335 San Diego Ca
Pv1 single family dwelling total system size 5kw using 25 modules. Cen
Date:  July 31, 2013
Contractor: Moein Lak

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-203
2013/07/310827054 Tunney Ave Los Angeles Ca 91335 San Diego CaMoein Lak
SCORE
82
6948 Tobias Ave Los Angeles Ca 91405 San Diego Ca
Changes from previously approved plans. Change include one additional
Date:  May 21, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20001-040
2014/05/210826948 Tobias Ave Los Angeles Ca 91405 San Diego CaMoein Lak
SCORE
82
3245 Castle Heights Ave Los Angeles Ca 90034 San Diego Ca
Pv1. Roof mounted solar system. Standard transformerless central inve
Date:  May 22, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-115
2014/05/220823245 Castle Heights Ave Los Angeles Ca 90034 San Diego CaMoein Lak
SCORE
82
7906 Melita Ave Los Angeles Ca 91605 San Diego Ca
New 8. 5kw rooftop pv system for an existing single family dwelling. S
Date:  January 10, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007
2014/01/100827906 Melita Ave Los Angeles Ca 91605 San Diego CaMoein Lak
SCORE
82
7412 Dorie Dr Los Angeles Ca 91304 San Diego Ca
Pv1 plan check for pv single family. 8. 2kw system. 33 panels and 1 inv
Date:  August 13, 2013
Contractor: Moein Lak

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-157
2013/08/130827412 Dorie Dr Los Angeles Ca 91304 San Diego CaMoein Lak
SCORE
82
3304 Bellevue Ave Los Angeles Ca 90026 San Diego Ca
New rooftop pv system for an existing sfr. System uses dc-dc converte
Date:  December 31, 2013
Contractor: Moein Lak

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/310823304 Bellevue Ave Los Angeles Ca 90026 San Diego CaMoein Lak
SCORE
82
17734 Mayerling St Los Angeles Ca 91344 San Diego Ca
Pv1. Install 7. 8 kw roof-mounted utility-interactive pv system. Tran
Date:  May 22, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137
2014/05/2208217734 Mayerling St Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
12133 Bellando Ct Los Angeles Ca 91344 San Diego Ca
Pv1 roof mounted solar sysem 8. 32kw interconnect with main panel. (2)
Date:  May 9, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-124
2014/05/0908212133 Bellando Ct Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
Date:  December 19, 2013
Contractor: Moein Lak

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350
2013/12/1908253 Neal Dr Los Angeles Ca 90041 San Diego CaMoein Lak
SCORE
82
109 Walnut Dr Los Angeles Ca 91040 San Diego Ca
Pv1 transformerless system. Total system size 12. 0kwac permit fee
Date:  April 9, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062
2014/04/09082109 Walnut Dr Los Angeles Ca 91040 San Diego CaMoein Lak
SCORE
82
5152 Topanga Canyon Blvd Los Angeles Ca 91364 San Diego Ca
New rooftop pv system using dc-dc converters for an existing single fa
Date:  December 19, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345
2013/12/190825152 Topanga Canyon Blvd Los Angeles Ca 91364 San Diego CaMoein Lak
SCORE
82
4811 Adele Ct Los Angeles Ca 91364 San Diego Ca
Pv1 transformerless system. Using solar optimizers. Total sysyem size
Date:  October 22, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288
2013/10/220824811 Adele Ct Los Angeles Ca 91364 San Diego CaMoein Lak
SCORE
82
167 Rinaldi St Los Angeles Ca 91344 San Diego Ca
Pv1 transformerless system. 3 strings for 1 inverter. 4. 2kwac
Date:  October 11, 2013
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-260
2013/10/11082167 Rinaldi St Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
5909 Wilkinson Ave Los Angeles Ca 91607 San Diego Ca
Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Tra
Date:  June 9, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153
2014/06/090825909 Wilkinson Ave Los Angeles Ca 91607 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-138
2014/05/230823112 Boulder St Los Angeles Ca 90063 San Diego CaMoein Lak
SCORE
82
Pv1 install roof mounted solar array on sfd. System size: 6kw central
Date:  June 20, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165
2014/06/20082Moein Lak
SCORE
82
Pv1 single family dwelling. Total system size 6. 8kw ac using 2 central
Date:  July 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-191
2014/07/16082Moein Lak
SCORE
82
Standard plan: 5. 72kw pv1 roof-mounted system with (22) rec solar 260p
Date:  July 18, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194
2014/07/18082Moein Lak
SCORE
82
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  July 25, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/07/25082Moein Lak
SCORE
82
Standard plan: 7. 8kw roof-mounted system with (2) power one pvi-3. 0-ou
Date:  July 25, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/07/25082Moein Lak
SCORE
82
Permit fee due to senate bill 1222 from 2012 14. 3kw pv1 roof-mount
Date:  August 4, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/08/04082Moein Lak
SCORE
82
Pv1. Install 6. 24 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 5, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/05082Moein Lak
SCORE
82
Pv1. Install 5. 46 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 5, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/05082Moein Lak
SCORE
82
Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 5, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/05082Moein Lak
SCORE
82
Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp
Date:  August 7, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213
2014/08/07082Moein Lak
SCORE
82
Pv1. Install 9. 36 kw roof-mounted, utility-interactive pv system.
Date:  August 12, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-210
2014/08/12082Moein Lak
SCORE
82
Pv1 central transformerless inverter standard plan install roof-mounte
Date:  August 15, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222
2014/08/15082Moein Lak
SCORE
82
Pv1 central/string inverterter standard plan. Install roof-mounted sol
Date:  August 15, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222
2014/08/15082Moein Lak
SCORE
82
13849 Eldridge Ave Los Angeles Ca 91342
Pv1. Install 4. 16 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 20, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226
2014/08/2008213849 Eldridge Ave Los Angeles Ca 91342Moein Lak
SCORE
82
Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 20, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226
2014/08/20082Moein Lak
SCORE
82
Pv1 sfd. Total system size 5kw ac using transformerless inverters. Usi
Date:  August 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230
2014/08/22082Moein Lak
SCORE
82
Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 29, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237
2014/08/29082Moein Lak
SCORE
82
Electrical
Date:  August 29, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-232
2014/08/29082Moein Lak
SCORE
82
Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy
Date:  September 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-242
2014/09/16082Moein Lak
SCORE
82
Permit fee is due to senate bill sb-1222. Pv1 single family. Tot
Date:  October 6, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230
2014/10/06082Moein Lak
SCORE
82
Pv1. Install 7. 28 kw dc roof-moutned, utility-interactive pv system.
Date:  October 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/16082Moein Lak
SCORE
82
Pv1. Install 8. 84 kw roof-mounted, utility-interactive pv system. Ce
Date:  October 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/16082Moein Lak
SCORE
82
19336 Vista Grande Way Los Angeles Ca 91326
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  August 12, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-218
2014/08/1208219336 Vista Grande Way Los Angeles Ca 91326Moein Lak
SCORE
82
Date:  October 8, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279
2014/10/080825201 Beeman Ave Los Angeles Ca 91607Moein Lak
SCORE
82
1433 Summitridge Dr Los Angeles Ca 90210
Permit fee due to senate bill 1222 from 2012 14. 3kw pv1 roof-mount
Date:  August 4, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/08/040821433 Summitridge Dr Los Angeles Ca 90210Moein Lak
SCORE
82
4027 Rock Hampton Dr Los Angeles Ca 91356
Permit fee is due to senate bill sb-1222. Pv1 single family. Tot
Date:  October 6, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230
2014/10/060824027 Rock Hampton Dr Los Angeles Ca 91356Moein Lak
SCORE
82
19801 Linnet St Los Angeles Ca 91364
Pv1. Install 9. 36 kw roof-mounted, utility-interactive pv system.
Date:  August 12, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-210
2014/08/1208219801 Linnet St Los Angeles Ca 91364Moein Lak
SCORE
82
Date:  October 10, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281
2014/10/10082207 Nashville St Los Angeles Ca 91311Moein Lak
SCORE
82
16964 Paulette Pl Los Angeles Ca 91344
Pv1. Install 8. 84 kw roof-mounted, utility-interactive pv system. Ce
Date:  October 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/1608216964 Paulette Pl Los Angeles Ca 91344Moein Lak
SCORE
82
11846 Garber St Los Angeles Ca 91342
Pv1. Install 5. 46 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 5, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/0508211846 Garber St Los Angeles Ca 91342Moein Lak
SCORE
82
17955 Calvert St Los Angeles Ca 91335
Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 5, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/0508217955 Calvert St Los Angeles Ca 91335Moein Lak
SCORE
82
10464 Penrose St Los Angeles Ca 91352
Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy
Date:  September 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-242
2014/09/1608210464 Penrose St Los Angeles Ca 91352Moein Lak
SCORE
82
89 Enfield Ave Los Angeles Ca 91325
Pv1 single family dwelling. Total system size 6. 8kw ac using 2 central
Date:  July 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-191
2014/07/1608289 Enfield Ave Los Angeles Ca 91325Moein Lak
SCORE
82
Date:  October 8, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279
2014/10/0808218267 Rosita St Los Angeles Ca 91356Moein Lak
SCORE
82
3253 Malcolm Ave Los Angeles Ca 90034
Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp
Date:  August 7, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213
2014/08/070823253 Malcolm Ave Los Angeles Ca 90034Moein Lak
SCORE
82
Date:  October 15, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-285
2014/10/150823 Beloit Ave Los Angeles Ca 90049Moein Lak
SCORE
82
Date:  August 29, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-232
2014/08/2908212 Valrose Ct Los Angeles Ca 90041Moein Lak
SCORE
82
227 Covello St Los Angeles Ca 91307
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  July 25, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/07/25082227 Covello St Los Angeles Ca 91307Moein Lak
SCORE
82
12813 League St Los Angeles Ca 91605
Standard plan: 5. 72kw pv1 roof-mounted system with (22) rec solar 260p
Date:  July 18, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194
2014/07/1808212813 League St Los Angeles Ca 91605Moein Lak
SCORE
82
11852 Fellows Ave Los Angeles Ca 91340
Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp
Date:  August 7, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213
2014/08/0708211852 Fellows Ave Los Angeles Ca 91340Moein Lak
SCORE
82
9958 Calvin Ave Los Angeles Ca 91324
Pv1. Install 7. 28 kw dc roof-moutned, utility-interactive pv system.
Date:  October 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/160829958 Calvin Ave Los Angeles Ca 91324Moein Lak
SCORE
82
Date:  October 10, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281
2014/10/1008213331 Almetz St Los Angeles Ca 91342Moein Lak
SCORE
82
12245 Via Santa Barbara Los Angeles Ca 91342
Pv1 central transformerless inverter standard plan install roof-mounte
Date:  August 15, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222
2014/08/1508212245 Via Santa Barbara Los Angeles Ca 91342Moein Lak
SCORE
82
10219 Melvin Ave Los Angeles Ca 91324
Pv1. Install 6. 24 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 5, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/0508210219 Melvin Ave Los Angeles Ca 91324Moein Lak
SCORE
82
69 Bianca Ave Los Angeles Ca 91406
Standard plan: 7. 8kw roof-mounted system with (2) power one pvi-3. 0-ou
Date:  July 25, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/07/2508269 Bianca Ave Los Angeles Ca 91406Moein Lak
SCORE
82
3783 Wade St Los Angeles Ca 90066
Pv1 sfd. Total system size 5kw ac using transformerless inverters. Usi
Date:  August 22, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230
2014/08/220823783 Wade St Los Angeles Ca 90066Moein Lak
SCORE
82
11593 Kling St Los Angeles Ca 91602
(n) roof mounted pv system per engineering
Date:  September 9, 2014
Value:   $10,000
Contractor: Moein Lak

Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-153
2014/09/09100008211593 Kling St Los Angeles Ca 91602Moein Lak
SCORE
82
70 Deveron Ridge Road Los Angeles Ca 91307
Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 20, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226
2014/08/2008270 Deveron Ridge Road Los Angeles Ca 91307Moein Lak
SCORE
82
17201 Index St Los Angeles Ca 91344
Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce
Date:  October 16, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/1608217201 Index St Los Angeles Ca 91344Moein Lak
SCORE
82
3343 Mountain View Ave Los Angeles Ca 90066
Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 29, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237
2014/08/290823343 Mountain View Ave Los Angeles Ca 90066Moein Lak
SCORE
82
Date:  October 15, 2014
Contractor: Moein Lak

Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-286
2014/10/1508249 Dempsey Ave Los Angeles Ca 91436Moein Lak
SCORE
82
4322 Cezanne Ave Los Angeles Ca 91364
Pv1 install roof mounted solar array on sfd. System size: 6kw central
Date:  June 20, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165
2014/06/200824322 Cezanne Ave Los Angeles Ca 91364Moein Lak
SCORE
82
10051 Hillgrove Dr Los Angeles Ca 90210
Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 29, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237
2014/08/2908210051 Hillgrove Dr Los Angeles Ca 90210Moein Lak
SCORE
82
5533 Allott Ave Los Angeles Ca 91401
Pv1 central/string inverterter standard plan. Install roof-mounted sol
Date:  August 15, 2014
Contractor: Moein Lak

Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222
2014/08/150825533 Allott Ave Los Angeles Ca 91401Moein Lak
SCORE
82
19336 Vista Grande Way Los Angeles Ca 91326 San Diego Ca
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  August 12, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-218
2014/08/1208219336 Vista Grande Way Los Angeles Ca 91326 San Diego CaMoein Lak
SCORE
82
10219 Melvin Ave Los Angeles Ca 91324 San Diego Ca
Pv1. Install 6. 24 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 5, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/0508210219 Melvin Ave Los Angeles Ca 91324 San Diego CaMoein Lak
SCORE
82
69 Bianca Ave Los Angeles Ca 91406 San Diego Ca
Standard plan: 7. 8kw roof-mounted system with (2) power one pvi-3. 0-ou
Date:  July 25, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/07/2508269 Bianca Ave Los Angeles Ca 91406 San Diego CaMoein Lak
SCORE
82
3783 Wade St Los Angeles Ca 90066 San Diego Ca
Pv1 sfd. Total system size 5kw ac using transformerless inverters. Usi
Date:  August 22, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230
2014/08/220823783 Wade St Los Angeles Ca 90066 San Diego CaMoein Lak
SCORE
82
11593 Kling St Los Angeles Ca 91602 San Diego Ca
(n) roof mounted pv system per engineering
Date:  September 9, 2014
Value:   $10,000
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-153
2014/09/09100008211593 Kling St Los Angeles Ca 91602 San Diego CaMoein Lak
SCORE
82
70 Deveron Ridge Road Los Angeles Ca 91307 San Diego Ca
Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 20, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226
2014/08/2008270 Deveron Ridge Road Los Angeles Ca 91307 San Diego CaMoein Lak
SCORE
82
17201 Index St Los Angeles Ca 91344 San Diego Ca
Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce
Date:  October 16, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/1608217201 Index St Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
13849 Eldridge Ave Los Angeles Ca 91342 San Diego Ca
Pv1. Install 4. 16 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 20, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226
2014/08/2008213849 Eldridge Ave Los Angeles Ca 91342 San Diego CaMoein Lak
SCORE
82
3343 Mountain View Ave Los Angeles Ca 90066 San Diego Ca
Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 29, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237
2014/08/290823343 Mountain View Ave Los Angeles Ca 90066 San Diego CaMoein Lak
SCORE
82
4322 Cezanne Ave Los Angeles Ca 91364 San Diego Ca
Pv1 install roof mounted solar array on sfd. System size: 6kw central
Date:  June 20, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165
2014/06/200824322 Cezanne Ave Los Angeles Ca 91364 San Diego CaMoein Lak
SCORE
82
10051 Hillgrove Dr Los Angeles Ca 90210 San Diego Ca
Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 29, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237
2014/08/2908210051 Hillgrove Dr Los Angeles Ca 90210 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279
2014/10/080825201 Beeman Ave Los Angeles Ca 91607 San Diego CaMoein Lak
SCORE
82
1433 Summitridge Dr Los Angeles Ca 90210 San Diego Ca
Permit fee due to senate bill 1222 from 2012 14. 3kw pv1 roof-mount
Date:  August 4, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/08/040821433 Summitridge Dr Los Angeles Ca 90210 San Diego CaMoein Lak
SCORE
82
4027 Rock Hampton Dr Los Angeles Ca 91356 San Diego Ca
Permit fee is due to senate bill sb-1222. Pv1 single family. Tot
Date:  October 6, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230
2014/10/060824027 Rock Hampton Dr Los Angeles Ca 91356 San Diego CaMoein Lak
SCORE
82
19801 Linnet St Los Angeles Ca 91364 San Diego Ca
Pv1. Install 9. 36 kw roof-mounted, utility-interactive pv system.
Date:  August 12, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-210
2014/08/1208219801 Linnet St Los Angeles Ca 91364 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281
2014/10/10082207 Nashville St Los Angeles Ca 91311 San Diego CaMoein Lak
SCORE
82
16964 Paulette Pl Los Angeles Ca 91344 San Diego Ca
Pv1. Install 8. 84 kw roof-mounted, utility-interactive pv system. Ce
Date:  October 16, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/1608216964 Paulette Pl Los Angeles Ca 91344 San Diego CaMoein Lak
SCORE
82
11846 Garber St Los Angeles Ca 91342 San Diego Ca
Pv1. Install 5. 46 kw roof-mounted, utility-interactive pv system. Ce
Date:  August 5, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/0508211846 Garber St Los Angeles Ca 91342 San Diego CaMoein Lak
SCORE
82
17955 Calvert St Los Angeles Ca 91335 San Diego Ca
Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen
Date:  August 5, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211
2014/08/0508217955 Calvert St Los Angeles Ca 91335 San Diego CaMoein Lak
SCORE
82
10464 Penrose St Los Angeles Ca 91352 San Diego Ca
Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy
Date:  September 16, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-242
2014/09/1608210464 Penrose St Los Angeles Ca 91352 San Diego CaMoein Lak
SCORE
82
5533 Allott Ave Los Angeles Ca 91401 San Diego Ca
Pv1 central string inverterter standard plan. Install roof-mounted sol
Date:  August 15, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222
2014/08/150825533 Allott Ave Los Angeles Ca 91401 San Diego CaMoein Lak
SCORE
82
89 Enfield Ave Los Angeles Ca 91325 San Diego Ca
Pv1 single family dwelling. Total system size 6. 8kw ac using 2 central
Date:  July 16, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-191
2014/07/1608289 Enfield Ave Los Angeles Ca 91325 San Diego CaMoein Lak
SCORE
82

Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-286
2014/10/1508249 Dempsey Ave Los Angeles Ca 91436 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279
2014/10/0808218267 Rosita St Los Angeles Ca 91356 San Diego CaMoein Lak
SCORE
82
3253 Malcolm Ave Los Angeles Ca 90034 San Diego Ca
Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp
Date:  August 7, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213
2014/08/070823253 Malcolm Ave Los Angeles Ca 90034 San Diego CaMoein Lak
SCORE
82
Date:  October 15, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-285
2014/10/150823 Beloit Ave Los Angeles Ca 90049 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-232
2014/08/2908212 Valrose Ct Los Angeles Ca 90041 San Diego CaMoein Lak
SCORE
82
227 Covello St Los Angeles Ca 91307 San Diego Ca
Pv1 central transformerless inverter standard plan. Install roof-mount
Date:  July 25, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200
2014/07/25082227 Covello St Los Angeles Ca 91307 San Diego CaMoein Lak
SCORE
82
12813 League St Los Angeles Ca 91605 San Diego Ca
Standard plan: 5. 72kw pv1 roof-mounted system with (22) rec solar 260p
Date:  July 18, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194
2014/07/1808212813 League St Los Angeles Ca 91605 San Diego CaMoein Lak
SCORE
82
11852 Fellows Ave Los Angeles Ca 91340 San Diego Ca
Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp
Date:  August 7, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213
2014/08/0708211852 Fellows Ave Los Angeles Ca 91340 San Diego CaMoein Lak
SCORE
82
9958 Calvin Ave Los Angeles Ca 91324 San Diego Ca
Pv1. Install 7. 28 kw dc roof-moutned, utility-interactive pv system.
Date:  October 16, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287
2014/10/160829958 Calvin Ave Los Angeles Ca 91324 San Diego CaMoein Lak
SCORE
82

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281
2014/10/1008213331 Almetz St Los Angeles Ca 91342 San Diego CaMoein Lak
SCORE
82
12245 Via Santa Barbara Los Angeles Ca 91342 San Diego Ca
Pv1 central transformerless inverter standard plan install roof-mounte
Date:  August 15, 2014
Contractor: Moein Lak

Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222
2014/08/1508212245 Via Santa Barbara Los Angeles Ca 91342 San Diego CaMoein Lak
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.