SCORE

MARTIN ABT

ABOUT MARTIN ABT

Martin Abt specializes in:

Martin Abt offers services:

Based on the information received from , associated with Martin Abt over the past .

If you are considering hiring Martin Abt for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Martin Abt has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
86
1 Huntington Av Boston Ma 02116
Offices retail mercantile department store restaurant bank garage certificate for offices (air workside - suite 3100) alt555509 issued 2 2 2016
Date:  March 29, 2017
Value:   $1,488,760
Contractor: Martin Abt

Client: Mass Turnpike Authority | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Coo678572 | Parcel: 0400985000
2017/03/291488760861 Huntington Av Boston Ma 02116Martin Abt
SCORE
86
1 Huntington Av Boston Ma 02116
Repair to exterior and interior walls due to car damage.
Date:  March 30, 2017
Value:   $67,345
Contractor: Martin Abt

Client: Copley Place Primary | Permit type: Other | Permit status: Open | Current use: Mixed | Permit id: Alt685687 | Parcel: 0400985200
2017/03/3067345861 Huntington Av Boston Ma 02116Martin Abt
SCORE
86
1 Huntington Av Boston Ma 02116
Renovation of center court of copley place;mall - phase 2 -; new finishes throughout. Install 3 new elevators and associated elevator lobbies. Remove existing elevator bank to flatten level center court of the lobby.; all; mall level 1 mens and womens; restrooms to be renovated.; ;pull 4 retail store faces out in line with other mall stores.;
Date:  April 20, 2016
Value:   $13,507,257
Contractor: Martin Abt

Client: Mass Turnpike Authority | Permit type: Renovations - exterior | Permit status: Expired | Current use: Mixed | Permit id: Alt558884 | Parcel: 0400985200
2016/04/2013507257861 Huntington Av Boston Ma 02116Martin Abt
SCORE
86
1 Huntington Av Boston Ma 02116
Remove and replace flooring ceiling and light fixtures at first and second floor of mall concourses. Scope includes floor finishes painting electrical hvac sprinkler and fire alarm.
Date:  September 30, 2015
Value:   $10,145,872
Contractor: Martin Abt

Client: Copley Place Primary | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt513154 | Parcel: 0400985000
2015/09/3010145872861 Huntington Av Boston Ma 02116Martin Abt
SCORE
86
1 Huntington Av Boston Ma 02116
Air worldwide remodel of office and kitchen area. Tower 3 lvl 1
Date:  February 2, 2016
Value:   $1,488,760
Contractor: Martin Abt

Client: Copley Place Primary | Permit type: Fast track application | Permit status: Open | Current use: Comm | Permit id: Alt555509 | Parcel: 0400985000
2016/02/021488760861 Huntington Av Boston Ma 02116Martin Abt
SCORE
86
1 Huntington Av Boston Ma 02116
Copley place mall renovation - mall level 1 -; add a new;escalator stair connecting mall level 1 with mall level 2.; work includes :; construct a new structural floor opening and all associated lighting and;finishes.; modify ;existing mechanical electrical and;fire protection.
Date:  February 11, 2016
Value:   $1,500,000
Contractor: Martin Abt

Client: Copley Place Primary | Permit type: Interior/exterior work | Permit status: Expired | Current use: Mixed | Permit id: Alt548982 | Parcel: 0400985200
2016/02/111500000861 Huntington Av Boston Ma 02116Martin Abt
SCORE
86
1 Huntington Av Boston Ma
Remove and replace flooring ceiling and light fixtures at first and second floor of mall concourses. Scope includes floor finishes painting electrical hvac sprinkler and fire alarm.
Date:  September 30, 2015
Value:   $10,145,872
Contractor: Martin Abt

Client: Copley Place | Permit type: Long form/alteration permit | Expiration date: March 30, 2016 | Current use: Comm | Permit id: Alt513154 | Parcel: 0400985200
2015/09/3010145872861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Demo only of stairs hot work permit will be applied for by contractor
Date:  December 29, 2015
Contractor: Martin Abt

Client: Copley Place | Permit type: Bfd construction demo reno | Permit id: Fdc548999 | Parcel: 0400985200
2015/12/290861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Renovation to the existing air worldwide office space. Relocate kitchenette from one location to another reconfigure office and conference room space. This is enabling work for new elevator banks under a seperate permit.
Date:  January 27, 2016
Contractor: Martin Abt

Client: Copley Place | Permit type: Bfd construction demo reno | Permit id: Fdc556527 | Parcel: 0400985200
2016/01/270861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Remove and replace flooring ceiling and light fixtures at first and second floor mall concourse.
Date:  January 27, 2016
Contractor: Martin Abt

Client: Mass Turnpike A | Permit type: Bfd construction demo reno | Permit id: Fdc556089 | Parcel: 0400985000
2016/01/270861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Air worldwide remodel of office and kitchen area. Tower 3 lvl 1
Date:  February 2, 2016
Value:   $1,488,760
Contractor: Martin Abt

Client: Mass Turnpike A | Permit type: Long form/alteration permit | Expiration date: August 2, 2016 | Current use: Comm | Permit id: Alt555509 | Parcel: 0400985000
2016/02/021488760861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Renovation of center court of copley place;mall - phase 2 -; new finishes throughout. Install 3 new elevators and associated elevator lobbies. Remove existing elevator bank to flatten level center court of the lobby.; all; mall level 1 mens and womens; restrooms to be renovated.; ;pull 4 retail store faces out in line with other mall stores.;
Date:  April 20, 2016
Value:   $13,507,257
Contractor: Martin Abt

Client: Copley Place Primary | Permit type: Long form/alteration permit | Expiration date: October 20, 2016 | Current use: Mixed | Permit id: Alt558884 | Parcel: 0400985200
2016/04/2013507257861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Renovation of copley mall center atrium and renovation in garages new finishes associated with elevator lobbies and center court area. ( no hot work;allowed with permit - must obtain proper permit to conduct hotwork)
Date:  February 11, 2016
Contractor: Martin Abt

Client: Mass Turnpike Authority | Permit type: Bfd construction demo reno | Permit id: Fdc558882 | Parcel: 0400985000
2016/02/110861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Copley place mall renovation - mall level 1 -; add a new;escalator stair connecting mall level 1 with mall level 2.; work includes :; construct a new structural floor opening and all associated lighting and;finishes.; modify ;existing mechanical electrical and;fire protection.
Date:  February 11, 2016
Value:   $1,500,000
Contractor: Martin Abt

Client: Copley Place Primary | Permit type: Long form/alteration permit | Expiration date: August 11, 2016 | Current use: Mixed | Permit id: Alt548982 | Parcel: 0400985200
2016/02/111500000861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Offices retail mercantile department store restaurant bank garage certificate for offices (air workside - suite 3100) alt555509 issued 2 2 2016
Date:  March 29, 2017
Value:   $1,488,760
Contractor: Martin Abt

Client: Copley Place Primary | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo678572 | Parcel: 0400985200
2017/03/291488760861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Repair to exterior and interior walls due to car damage.
Date:  March 30, 2017
Value:   $67,345
Contractor: Martin Abt

Client: Mass Turnpike Authority | Permit type: Long form/alteration permit | Expiration date: September 30, 2017 | Current use: Mixed | Permit id: Alt685687 | Parcel: 0400985000
2017/03/3067345861 Huntington Av Boston MaMartin Abt
SCORE
86
1 Huntington Av Boston Ma
Repair to car damage remove block wall to damaged extents and repair. We are removing damaged wall area back to a point where the wall is still solid and intact. We will then reinstall wall frame and door.
Date:  April 6, 2017
Contractor: Martin Abt

Client: Mass Turnpike Authority | Permit type: Bfd construction demo reno | Permit id: Fdc685820 | Parcel: 0400985000
2017/04/060861 Huntington Av Boston MaMartin Abt
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.