Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 502 College Av Boulder Co Replace forced air heat with radiant in floor boiler system. In lower level. Raise celing as part of replacementnew sub panel on second floor for washer dryer. Add steam to existing second floor shower. No mew fixtures or structural changes. Client: Mark Magaldi,Deborah Magaldi | Applicant: Mark Magaldi | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 21, 2007 | Current use: Single family d |