Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Date: August 12, 2016 Contractor: Mark Hurm Client: Lundgren & Lundgren | Permit id: Bp-16-05176 | Parcel: 06071020061 | |||||
SCORE 88 Date: August 24, 2016 Contractor: Mark Hurm Client: Carroll Eric V Sr & Anita C | Permit id: Bp-16-05455 | Parcel: 06083010065 | |||||
SCORE 88 Date: August 17, 2016 Contractor: Mark Hurm Client: Ashford Gainesville Lp | Permit id: Bp-16-02528-02 | Parcel: 14589000000 | |||||
SCORE 88 Date: August 25, 2016 Contractor: Mark Hurm Client: Nakleh, Marc J | Permit id: Bp-16-05490 | Parcel: 15637010002 | |||||
SCORE 88 Date: August 23, 2016 Contractor: Mark Hurm Client: Feigum Andrew Dominick | Permit id: Bp-16-05400 | Parcel: 06077100044 | |||||
SCORE 88 Date: August 24, 2016 Contractor: Mark Hurm Client: Kennerson W I & Gail | Permit id: Bp-16-05475 | Parcel: 06526002000 | |||||
SCORE 88 Date: August 19, 2016 Contractor: Mark Hurm Client: Mitchell & Mitchell | Permit id: Bp-16-05332 | Parcel: 11882000000 | |||||
SCORE 88 Date: August 19, 2016 Contractor: Mark Hurm Client: Depue Terri L | Permit id: Bp-16-05348 | Parcel: 06015250024 | |||||
SCORE 88 Date: August 18, 2016 Contractor: Mark Hurm Client: Meyer & Vash W H | Permit id: Bp-16-05316 | Parcel: 09042000000 | |||||
SCORE 88 Date: August 12, 2016 Contractor: Mark Hurm Client: Ebadian & Ebadian | Permit id: Bp-16-05167 | Parcel: 07294200227 | |||||
SCORE 88 Date: August 1, 2016 Contractor: Mark Hurm Client: Brenneman Trustee & Hollifield | Permit id: Bp-16-04902 | Parcel: 06507000000 | |||||
SCORE 88 Date: August 10, 2016 Contractor: Mark Hurm Client: Gordon Andrew Joel & Danica Ca | Permit id: Bp-16-05106 | Parcel: 06076116000 | |||||
SCORE 88 Date: August 19, 2016 Contractor: Mark Hurm Client: Akira Wood Inc | Permit id: Bp-16-05330 | Parcel: 13055002000 | |||||
SCORE 88 Date: August 19, 2016 Contractor: Mark Hurm Client: Klempner, Dylan Trustee | Permit id: Bp-16-05331 | Parcel: 12307000000 | |||||
SCORE 88 Date: July 21, 2016 Contractor: Mark Hurm Client: Ninety Eighth Street Property, Inc | Permit id: Bp-16-04685 | Parcel: 11627001000 | |||||
SCORE 88 Date: July 18, 2016 Contractor: Mark Hurm Client: Dyke, Edward J Iii | Permit id: Bp-16-04558 | Parcel: 06371001000 | |||||
SCORE 88 Date: July 25, 2016 Contractor: Mark Hurm Client: Craig & Huang H W | Permit id: Bp-16-04748 | Parcel: 06015230102 | |||||
SCORE 88 Date: July 15, 2016 Contractor: Mark Hurm Client: Terry, Craig | Permit id: Bp-16-04541 | Parcel: 08202116000 | |||||
SCORE 88 Date: July 18, 2016 Contractor: Mark Hurm Client: Fisher, Kurt W | Permit id: Bp-16-04547 | Parcel: 14552804000 | |||||
SCORE 88 Date: July 1, 2016 Contractor: Mark Hurm Client: John Johnson Enterprises Llc | Permit id: Bp-16-04220 | Parcel: 06680020063 | |||||
SCORE 88 Date: July 26, 2016 Contractor: Mark Hurm Client: Hollifield, Andrew R | Permit id: Bp-16-04790 | Parcel: 09019223000 | |||||
SCORE 88 Date: July 13, 2016 Contractor: Mark Hurm Client: Ridgway Enterprises Inc | Permit id: Bp-16-04476 | Parcel: 06083021000 | |||||
SCORE 88 Date: July 19, 2016 Contractor: Mark Hurm Client: Blackmon & Steier Co-Trustees | Permit id: Bp-16-04590 | Parcel: 09239001000 | |||||
SCORE 88 Date: July 5, 2016 Contractor: Mark Hurm Client: Bartley Temple Methodist, Church Inc | Permit id: Bp-16-04244 | Parcel: 10772000000 | |||||
SCORE 88 Date: June 20, 2016 Contractor: Mark Hurm Client: Mcdonald, Greg D Martha B | Permit id: Bp-16-03958 | Parcel: 06466041000 | |||||
SCORE 88 Date: June 27, 2016 Contractor: Mark Hurm Client: Largado, Kim V | Permit id: Bp-16-04105 | Parcel: 06091010025 | |||||
SCORE 88 Date: June 2, 2016 Contractor: Mark Hurm Client: Strauser, Donald Dean Jacqueline Audrey Life Estate | Permit id: Bp-16-03383 | Parcel: 08961000000 | |||||
SCORE 88 Date: June 6, 2016 Contractor: Mark Hurm Client: Thomas, Richard F Jean M G | Permit id: Bp-16-03510 | Parcel: 06394035000 | |||||
SCORE 88 Date: June 20, 2016 Contractor: Mark Hurm Client: Granada Of Gainesville Llc | Permit id: Bp-16-03925 | Parcel: 10008000000 | |||||
SCORE 88 Date: June 8, 2016 Contractor: Mark Hurm Client: Thompson, Kevin Elizabeth | Permit id: Bp-16-03640 | Parcel: 09024005000 | |||||
SCORE 88 Date: June 7, 2016 Contractor: Mark Hurm Client: Mikell, John Tate | Permit id: Bp-16-03557 | Parcel: 06491005000 | |||||
SCORE 88 Date: June 10, 2016 Contractor: Mark Hurm Client: Cinque, Vivian | Permit id: Bp-16-02071-02 | Parcel: 12951001000 | |||||
SCORE 88 Date: June 7, 2016 Contractor: Mark Hurm Client: Sampson, Alesha C | Permit id: Bp-16-03515 | Parcel: 10858055000 | |||||
SCORE 88 Date: June 14, 2016 Contractor: Mark Hurm Client: Curtis, David S Elinore | Permit id: Bp-16-03760 | Parcel: 06076010007 | |||||
SCORE 88 Date: June 9, 2016 Contractor: Mark Hurm Client: Camp Mhc Llc | Permit id: Bp-16-03649 | Parcel: 10799000000 | |||||
SCORE 88 Date: June 6, 2016 Contractor: Mark Hurm Client: Vatani, Farideh Trustee | Permit id: Bp-16-03479 | Parcel: 06015001006 | |||||
SCORE 88 Date: June 15, 2016 Contractor: Mark Hurm Client: Us Bank National Assn | Permit id: Bp-16-03816 | Parcel: 06071010069 | |||||
SCORE 88 Date: June 6, 2016 Contractor: Mark Hurm Client: Hill, Sharon A | Permit id: Bp-16-03509 | Parcel: 09256009000 | |||||
SCORE 88 Date: September 16, 2016 Contractor: Mark Hurm Client: Kop & Roberts & Roberts | Permit id: Bp-16-05927 | Parcel: 07301207000 | |||||
SCORE 88 Date: October 28, 2016 Contractor: Mark Hurm Client: Bivens Forest Condominium, Ass | Permit id: Bp-16-06793 | Parcel: 07332102005 | |||||
SCORE 88 Date: September 28, 2016 Contractor: Mark Hurm Client: Shah, Pravin & Anila | Permit id: Bp-16-06152 | Parcel: 07297024033 | |||||
SCORE 88 Date: October 28, 2016 Contractor: Mark Hurm Client: Runnells & Runnells Trustees | Permit id: Bp-16-06812 | Parcel: 06500131000 | |||||
SCORE 88 Date: November 2, 2016 Contractor: Mark Hurm Client: Dean, Robert G Trustee | Permit id: Bp-16-06921 | Parcel: 08230004002 | |||||
SCORE 88 Date: September 16, 2016 Contractor: Mark Hurm Client: Chestnut Iv & Chestnut | Permit id: Bp-16-05928 | Parcel: 10626015000 | |||||
SCORE 88 Date: January 25, 2012 Contractor: Mark Hurm Client: Elliott, Herschel Trustee | Completion date: August 2, 2012 | Permit id: Bp-12-00321 | Parcel: 06741010004 | |||||
SCORE 88 Date: February 15, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 23, 2012 | Permit id: Bp-12-00713 | Parcel: 06680005000 | |||||
SCORE 88 Date: December 22, 2011 Contractor: Mark Hurm Client: Schroder Trustee & West Trust, & West Trust | Completion date: September 21, 2012 | Permit id: Bp-11-06461 | Parcel: 15570001000 | |||||
SCORE 88 Date: October 11, 2011 Contractor: Mark Hurm Client: Hunt, Angela | Completion date: November 1, 2011 | Permit id: Bp-11-05234 | Parcel: 06014024036 | |||||
SCORE 88 Date: April 1, 2013 Contractor: Mark Hurm Client: Ogle, Mary S | Completion date: May 8, 2013 | Permit id: Bp-13-01854 | Parcel: 10607024000 | |||||
SCORE 88 Date: February 21, 2013 Contractor: Mark Hurm Client: Gainesville House Holdings Llc | Completion date: March 13, 2013 | Permit id: Bp-13-01034 | Parcel: 06460009000 | |||||
SCORE 88 Date: March 14, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 22, 2012 | Permit id: Bp-12-01251 | Parcel: 06680005000 | |||||
SCORE 88 Date: January 4, 2012 Contractor: Mark Hurm Client: Dj Coin Laundries Inc | Completion date: January 10, 2012 | Permit id: Bp-12-00031 | Parcel: 10072004000 | |||||
SCORE 88 Date: October 22, 2012 Contractor: Mark Hurm Client: Buono, Michael E Laura A | Completion date: February 13, 2013 | Permit id: Bp-12-05169 | Parcel: 06076050064 | |||||
SCORE 88 Date: December 5, 2012 Contractor: Mark Hurm Client: Reece, Alexander D | Completion date: June 10, 2013 | Permit id: Bp-12-05737 | Parcel: 07878020001 | |||||
SCORE 88 Date: May 25, 2011 Contractor: Mark Hurm Client: Mccloud, D E Mary | Completion date: October 7, 2011 | Permit id: Bp-11-02490 | Parcel: 13100000000 | |||||
SCORE 88 Date: March 5, 2012 Contractor: Mark Hurm Client: H T Hackney Co (the) | Completion date: March 15, 2012 | Permit id: Bp-12-00990 | Parcel: 08210003001 | |||||
SCORE 88 Date: May 1, 2013 Contractor: Mark Hurm Client: Jones, Rex Creighton Mary E | Completion date: May 21, 2013 | Permit id: Bp-13-02528 | Parcel: 10353000000 | |||||
SCORE 88 Date: October 24, 2011 Contractor: Mark Hurm Client: Montgomery, J M Christy | Completion date: December 1, 2011 | Permit id: Bp-11-05547 | Parcel: 06439010033 | |||||
SCORE 88 Date: June 20, 2011 Contractor: Mark Hurm Client: Pauzel Llc & Tricep Inc | Completion date: April 11, 2012 | Permit id: Bp-11-03016 | Parcel: 14973000000 | |||||
SCORE 88 Date: November 9, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-05801 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 9, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-05800 | Parcel: 06680013000 | |||||
SCORE 88 Date: October 31, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 8, 2011 | Permit id: Bp-11-05620 | Parcel: 06680013000 | |||||
SCORE 88 Date: August 16, 2011 Contractor: Mark Hurm Client: Blackburn, Douglas R Rosalie M | Completion date: October 4, 2011 | Permit id: Bp-11-04272 | Parcel: 06076221038 | |||||
SCORE 88 Date: November 30, 2011 Contractor: Mark Hurm Client: Southwest Business Park Inc | Completion date: December 21, 2011 | Permit id: Bp-11-05901 | Parcel: 06800024000 | |||||
SCORE 88 Date: September 25, 2012 Contractor: Mark Hurm Client: Lawrence, F Parker Ii | Completion date: March 27, 2013 | Permit id: Bp-12-04665 | Parcel: 06463011000 | |||||
SCORE 88 Date: August 16, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-04271 | Parcel: 06680013000 | |||||
SCORE 88 Date: September 19, 2012 Contractor: Mark Hurm Client: Beriau, Richard A Christine B | Completion date: September 21, 2012 | Permit id: Bp-12-04516 | Parcel: 05979122000 | |||||
SCORE 88 Date: June 11, 2013 Contractor: Mark Hurm Client: Barksdale, Sheila K | Completion date: October 29, 2013 | Permit id: Bp-13-03357 | Parcel: 15700066000 | |||||
SCORE 88 Date: October 3, 2011 Contractor: Mark Hurm Client: Atkins & Tuffs H W | Completion date: November 16, 2011 | Permit id: Bp-11-05110 | Parcel: 06455001000 | |||||
SCORE 88 Date: November 20, 2012 Contractor: Mark Hurm Client: Cockrell, Charles A Jr | Completion date: January 25, 2013 | Permit id: Bp-12-05702 | Parcel: 06092050021 | |||||
SCORE 88 Date: October 17, 2011 Contractor: Mark Hurm Client: Siegel, Brent G Martha C | Completion date: November 18, 2011 | Permit id: Bp-11-05370 | Parcel: 06503006001 | |||||
SCORE 88 Date: September 7, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 22, 2011 | Permit id: Bp-11-04635 | Parcel: 06680013000 | |||||
SCORE 88 Date: June 12, 2012 Contractor: Mark Hurm Client: Priest, Steven | Completion date: October 30, 2012 | Permit id: Bp-12-02739 | Parcel: 06458005000 | |||||
SCORE 88 Date: February 2, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 9, 2012 | Permit id: Bp-12-00496 | Parcel: 06680013000 | |||||
SCORE 88 Date: April 23, 2013 Contractor: Mark Hurm Client: Kaufmann & Kaufmann | Completion date: June 19, 2013 | Permit id: Bp-13-02376 | Parcel: 07333102000 | |||||
SCORE 88 Date: November 15, 2011 Contractor: Mark Hurm Client: Gleim, Irvin Darlene | Completion date: November 17, 2011 | Permit id: Bp-11-05895 | Parcel: 06383031008 | |||||
SCORE 88 Date: February 2, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 9, 2012 | Permit id: Bp-12-00493 | Parcel: 06680005000 | |||||
SCORE 88 Date: October 2, 2012 Contractor: Mark Hurm Client: Kelsey, Kevin H Lark N | Completion date: January 25, 2013 | Permit id: Bp-12-04821 | Parcel: 06014015059 | |||||
SCORE 88 Date: September 12, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 22, 2011 | Permit id: Bp-11-04723 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 24, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: October 27, 2011 | Permit id: Bp-11-04427 | Parcel: 06680013000 | |||||
SCORE 88 Date: February 8, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 16, 2012 | Permit id: Bp-12-00587 | Parcel: 06680005000 | |||||
SCORE 88 Date: June 25, 2012 Contractor: Mark Hurm Client: Hill, Taboris Linda J | Completion date: November 13, 2012 | Permit id: Bp-12-02977 | Parcel: 12558009000 | |||||
SCORE 88 Date: December 22, 2011 Contractor: Mark Hurm Client: Schroder Trustee & West Trust, & West Trust | Completion date: September 21, 2012 | Permit id: Bp-11-06460 | Parcel: 15570001000 | |||||
SCORE 88 Date: February 22, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 8, 2012 | Permit id: Bp-12-00831 | Parcel: 06680005000 | |||||
SCORE 88 Date: December 19, 2011 Contractor: Mark Hurm Client: Mcdonald, A P Renee | Completion date: June 29, 2012 | Permit id: Bp-11-06395 | Parcel: 06428004006 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: December 1, 2011 | Permit id: Bp-11-05993 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 31, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 17, 2011 | Permit id: Bp-11-04532 | Parcel: 06680013000 | |||||
SCORE 88 Date: April 8, 2013 Contractor: Mark Hurm Client: Evans, Basil Phillip Jr Nancy Steinmeyer | Completion date: June 14, 2013 | Permit id: Bp-13-01981 | Parcel: 09003005014 | |||||
SCORE 88 Date: November 14, 2012 Contractor: Mark Hurm Client: Francis, Elaine | Completion date: November 30, 2012 | Permit id: Bp-12-05568 | Parcel: 08985007029 | |||||
SCORE 88 Date: October 3, 2011 Contractor: Mark Hurm Client: Hackett, David M | Completion date: October 7, 2011 | Permit id: Bp-11-05079 | Parcel: 06082046000 | |||||
SCORE 88 Date: April 15, 2013 Contractor: Mark Hurm Client: Lewis, Erik T R Claire E | Completion date: May 1, 2013 | Permit id: Bp-13-02145 | Parcel: 15699020000 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: December 1, 2011 | Permit id: Bp-11-05991 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 31, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 17, 2011 | Permit id: Bp-11-04531 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 8, 2013 Contractor: Mark Hurm Client: Teitelbaum, Philip Osnat B | Completion date: August 30, 2013 | Permit id: Bp-13-04605 | Parcel: 09019201000 | |||||
SCORE 88 Date: February 12, 2013 Contractor: Mark Hurm Client: Jimenez, Martha | Completion date: February 27, 2013 | Permit id: Bp-13-00825 | Parcel: 06014028002 | |||||
SCORE 88 Date: August 29, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 17, 2011 | Permit id: Bp-11-04468 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 11, 2013 Contractor: Mark Hurm Client: Hall, Philip Lee | Completion date: February 12, 2013 | Permit id: Bp-13-00781 | Parcel: 10083004000 | |||||
SCORE 88 Date: July 13, 2012 Contractor: Mark Hurm Client: Mullen, Christina M | Completion date: December 3, 2012 | Permit id: Bp-12-03315 | Parcel: 06432004000 | |||||
SCORE 88 Date: February 15, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 23, 2012 | Permit id: Bp-12-00717 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 18, 2013 Contractor: Mark Hurm Client: Sherwood, Danton C | Completion date: July 24, 2013 | Permit id: Bp-13-00909 | Parcel: 11885000000 | |||||
SCORE 88 Date: January 22, 2013 Contractor: Mark Hurm Client: Mosley, David E | Completion date: February 8, 2013 | Permit id: Bp-13-00337 | Parcel: 11541000000 | |||||
SCORE 88 Date: November 2, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-05680 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 8, 2013 Contractor: Mark Hurm Client: Pearce, Karen S | Completion date: August 30, 2013 | Permit id: Bp-13-04607 | Parcel: 09019010000 | |||||
SCORE 88 Date: February 16, 2012 Contractor: Mark Hurm Client: S Clark Butler Properties Land, Trust | Completion date: May 1, 2012 | Permit id: Bp-12-00761 | Parcel: 06810003000 | |||||
SCORE 88 Date: March 14, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 22, 2012 | Permit id: Bp-12-01192 | Parcel: 06680005000 | |||||
SCORE 88 Date: January 7, 2013 Contractor: Mark Hurm Client: Walden, Elayne Gocek | Completion date: February 5, 2013 | Permit id: Bp-13-00075 | Parcel: 09230000000 | |||||
SCORE 88 Date: February 4, 2013 Contractor: Mark Hurm Client: Whitley, Steven R Trustee | Completion date: May 2, 2013 | Permit id: Bp-13-00642 | Parcel: 09013006020 | |||||
SCORE 88 Date: June 27, 2011 Contractor: Mark Hurm Client: Amerson, Phillip L Kelly L | Completion date: November 18, 2011 | Permit id: Bp-11-03224 | Parcel: 06076221027 | |||||
SCORE 88 Date: June 27, 2011 Contractor: Mark Hurm Client: Amerson, Phillip L Kelly L | Completion date: November 18, 2011 | Permit id: Bp-11-03223 | Parcel: 06076221027 | |||||
SCORE 88 Date: July 6, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 1, 2011 | Permit id: Bp-11-03399 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 6, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 1, 2011 | Permit id: Bp-11-03400 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 6, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 1, 2011 | Permit id: Bp-11-03398 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 11, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 3, 2011 | Permit id: Bp-11-03498 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 11, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 3, 2011 | Permit id: Bp-11-03497 | Parcel: 06680013000 | |||||
SCORE 88 Date: July 11, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 3, 2011 | Permit id: Bp-11-03500 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 18, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 8, 2011 | Permit id: Bp-11-03668 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 20, 2011 Contractor: Mark Hurm Client: Lee C Mcgriff And Williams, Insurance Agency Inc | Completion date: December 7, 2011 | Permit id: Bp-11-03715 | Parcel: 06494010000 | |||||
SCORE 88 Date: July 18, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 8, 2011 | Permit id: Bp-11-03667 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 18, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 8, 2011 | Permit id: Bp-11-03669 | Parcel: 06680013000 | |||||
SCORE 88 Date: July 25, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-03802 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 25, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-03800 | Parcel: 06680005000 | |||||
SCORE 88 Date: July 25, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-03801 | Parcel: 06680013000 | |||||
SCORE 88 Date: August 16, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-04269 | Parcel: 06680013000 | |||||
SCORE 88 Date: August 16, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-04270 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: October 27, 2011 | Permit id: Bp-11-04341 | Parcel: 06680013000 | |||||
SCORE 88 Date: August 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: October 27, 2011 | Permit id: Bp-11-04339 | Parcel: 06680013000 | |||||
SCORE 88 Date: August 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: October 27, 2011 | Permit id: Bp-11-04342 | Parcel: 06680013000 | |||||
SCORE 88 Date: August 24, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: October 27, 2011 | Permit id: Bp-11-04428 | Parcel: 06680013000 | |||||
SCORE 88 Date: August 24, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: October 27, 2011 | Permit id: Bp-11-04426 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 29, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 17, 2011 | Permit id: Bp-11-04470 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 29, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 17, 2011 | Permit id: Bp-11-04471 | Parcel: 06680005000 | |||||
SCORE 88 Date: August 31, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 17, 2011 | Permit id: Bp-11-04533 | Parcel: 06680005000 | |||||
SCORE 88 Date: September 7, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 22, 2011 | Permit id: Bp-11-04634 | Parcel: 06680013000 | |||||
SCORE 88 Date: September 7, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 22, 2011 | Permit id: Bp-11-04636 | Parcel: 06680005000 | |||||
SCORE 88 Date: September 12, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 22, 2011 | Permit id: Bp-11-04722 | Parcel: 06680005000 | |||||
SCORE 88 Date: September 12, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 22, 2011 | Permit id: Bp-11-04724 | Parcel: 06680005000 | |||||
SCORE 88 Date: October 26, 2011 Contractor: Mark Hurm Client: Fjd Realvestment Llc | Completion date: November 30, 2011 | Permit id: Bp-11-05070 | Parcel: 08210003000 | |||||
SCORE 88 Date: October 13, 2011 Contractor: Mark Hurm Client: Fjd Realvestment Llc | Completion date: November 28, 2011 | Permit id: Bp-11-05070-01 | Parcel: 08210003000 | |||||
SCORE 88 Date: October 5, 2011 Contractor: Mark Hurm Client: Brenneman & Brenneman, Co-Trustees & Hollifield | Completion date: October 14, 2011 | Permit id: Bp-11-05154 | Parcel: 06507000000 | |||||
SCORE 88 Date: October 11, 2011 Contractor: Mark Hurm Client: Wesley United Methodist Church | Completion date: October 13, 2011 | Permit id: Bp-11-05233 | Parcel: 08686001000 | |||||
SCORE 88 Date: October 12, 2011 Contractor: Mark Hurm Client: Hunt, Angela | Completion date: November 1, 2011 | Permit id: Bp-11-05333 | Parcel: 06014024036 | |||||
SCORE 88 Date: October 13, 2011 Contractor: Mark Hurm Client: Amerson & Thomas Et Ux | Completion date: December 6, 2011 | Permit id: Bp-11-05349 | Parcel: 07296020016 | |||||
SCORE 88 Date: October 27, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 3, 2011 | Permit id: Bp-11-05609 | Parcel: 06680013000 | |||||
SCORE 88 Date: October 27, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 3, 2011 | Permit id: Bp-11-05607 | Parcel: 06680013000 | |||||
SCORE 88 Date: October 27, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 3, 2011 | Permit id: Bp-11-05608 | Parcel: 06680013000 | |||||
SCORE 88 Date: October 31, 2011 Contractor: Mark Hurm Client: Kraft & Kraft Trustees | Completion date: December 20, 2011 | Permit id: Bp-11-05637 | Parcel: 06083004051 | |||||
SCORE 88 Date: October 31, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 8, 2011 | Permit id: Bp-11-05619 | Parcel: 06680013000 | |||||
SCORE 88 Date: October 31, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 8, 2011 | Permit id: Bp-11-05621 | Parcel: 06680005000 | |||||
SCORE 88 Date: October 31, 2011 Contractor: Mark Hurm Client: Combs, Sandra | Completion date: November 16, 2011 | Permit id: Bp-11-05636 | Parcel: 06014020014 | |||||
SCORE 88 Date: November 1, 2011 Contractor: Mark Hurm Client: Polkowski, John S Iii Marguerite M | Completion date: November 8, 2011 | Permit id: Bp-11-05657 | Parcel: 06102075075 | |||||
SCORE 88 Date: November 2, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-05682 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 2, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-05681 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 3, 2011 Contractor: Mark Hurm Client: Dettmann, John W | Completion date: October 4, 2012 | Permit id: Bp-11-05706 | Parcel: 08649000000 | |||||
SCORE 88 Date: November 9, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 15, 2011 | Permit id: Bp-11-05802 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 29, 2011 | Permit id: Bp-11-05995 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: December 1, 2011 | Permit id: Bp-11-05992 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 29, 2011 | Permit id: Bp-11-05994 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Ferber, Joanne | Completion date: November 29, 2011 | Permit id: Bp-11-05988 | Parcel: 08160005033 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: November 29, 2011 | Permit id: Bp-11-05996 | Parcel: 06680005000 | |||||
SCORE 88 Date: November 22, 2011 Contractor: Mark Hurm Client: Winegardner, Randy | Completion date: June 28, 2012 | Permit id: Bp-11-05998 | Parcel: 08806002000 | |||||
SCORE 88 Date: November 23, 2011 Contractor: Mark Hurm Client: Auth, D L Joanne B | Completion date: November 30, 2011 | Permit id: Bp-11-06015 | Parcel: 12583000000 | |||||
SCORE 88 Date: December 6, 2011 Contractor: Mark Hurm Client: Beste & Legates-Beste H W | Completion date: October 8, 2012 | Permit id: Bp-11-06215 | Parcel: 08446000000 | |||||
SCORE 88 Date: December 19, 2011 Contractor: Mark Hurm Client: Smith, Miriam Joyce Life Estate | Completion date: April 24, 2012 | Permit id: Bp-11-06394 | Parcel: 10601008000 | |||||
SCORE 88 Date: December 20, 2011 Contractor: Mark Hurm Client: William & Agnes Brown Family, Ltd | Completion date: October 5, 2012 | Permit id: Bp-11-06420 | Parcel: 13207000000 | |||||
SCORE 88 Date: December 21, 2011 Contractor: Mark Hurm Client: Ben-O-Fred Inc | Completion date: January 10, 2012 | Permit id: Bp-11-06450 | Parcel: 06508005001 | |||||
SCORE 88 Date: January 4, 2012 Contractor: Mark Hurm Completion date: June 25, 2012 | Permit id: Bp-12-00050 | Parcel: 09536000000 | |||||
SCORE 88 Date: January 23, 2012 Contractor: Mark Hurm Client: Knaggs, James M | Completion date: January 27, 2012 | Permit id: Bp-12-00275 | Parcel: 07915011003 | |||||
SCORE 88 Date: January 23, 2012 Contractor: Mark Hurm Client: Ninehan, Carol | Completion date: September 21, 2012 | Permit id: Bp-12-00269 | Parcel: 06385050000 | |||||
SCORE 88 Date: January 31, 2012 Contractor: Mark Hurm Client: Protected Owner Information | Completion date: June 26, 2012 | Permit id: Bp-12-00436 | Parcel: 06076200070 | |||||
SCORE 88 Date: February 2, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 9, 2012 | Permit id: Bp-12-00491 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 2, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 9, 2012 | Permit id: Bp-12-00494 | Parcel: 06680013000 | |||||
SCORE 88 Date: February 2, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 9, 2012 | Permit id: Bp-12-00492 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 2, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 9, 2012 | Permit id: Bp-12-00495 | Parcel: 06680013000 | |||||
SCORE 88 Date: February 8, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 16, 2012 | Permit id: Bp-12-00592 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 8, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 16, 2012 | Permit id: Bp-12-00589 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 8, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 16, 2012 | Permit id: Bp-12-00594 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 8, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 16, 2012 | Permit id: Bp-12-00588 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 8, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 16, 2012 | Permit id: Bp-12-00593 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 9, 2012 Contractor: Mark Hurm Client: Alim, Raenie Lynn | Completion date: April 23, 2012 | Permit id: Bp-12-00624 | Parcel: 06014001047 | |||||
SCORE 88 Date: February 9, 2012 Contractor: Mark Hurm Client: Fitzgerald, Constance R | Completion date: September 5, 2012 | Permit id: Bp-12-00623 | Parcel: 06460092000 | |||||
SCORE 88 Date: February 15, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 23, 2012 | Permit id: Bp-12-00716 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 15, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 23, 2012 | Permit id: Bp-12-00712 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 15, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 23, 2012 | Permit id: Bp-12-00714 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 15, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: February 23, 2012 | Permit id: Bp-12-00715 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 21, 2012 Contractor: Mark Hurm Client: Newman, R L Joann | Completion date: March 6, 2012 | Permit id: Bp-12-00805 | Parcel: 09347000000 | |||||
SCORE 88 Date: February 22, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 8, 2012 | Permit id: Bp-12-00833 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 22, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 8, 2012 | Permit id: Bp-12-00834 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 22, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 8, 2012 | Permit id: Bp-12-00835 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 22, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 8, 2012 | Permit id: Bp-12-00830 | Parcel: 06680005000 | |||||
SCORE 88 Date: February 22, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 8, 2012 | Permit id: Bp-12-00832 | Parcel: 06680005000 | |||||
SCORE 88 Date: March 14, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 22, 2012 | Permit id: Bp-12-01191 | Parcel: 06680005000 | |||||
SCORE 88 Date: March 14, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 22, 2012 | Permit id: Bp-12-01193 | Parcel: 06680005000 | |||||
SCORE 88 Date: March 14, 2012 Contractor: Mark Hurm Client: Wisenbaker, Reynell M Heirs | Completion date: May 9, 2012 | Permit id: Bp-12-01200 | Parcel: 06108050013 | |||||
SCORE 88 Date: March 14, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 22, 2012 | Permit id: Bp-12-01250 | Parcel: 06680005000 | |||||
SCORE 88 Date: March 14, 2012 Contractor: Mark Hurm Client: Commonwealth Gainesville Ch, Llc | Completion date: March 22, 2012 | Permit id: Bp-12-01249 | Parcel: 06680005000 | |||||
SCORE 88 Date: March 21, 2012 Contractor: Mark Hurm Client: Bridwell & Bridwell & Bridwell | Completion date: August 30, 2012 | Permit id: Bp-12-01369 | Parcel: 07965004042 | |||||
SCORE 88 Date: April 2, 2012 Contractor: Mark Hurm Client: Derus, Rhonda C | Completion date: April 19, 2012 | Permit id: Bp-12-01512-01 | Parcel: 15486401001 | |||||
SCORE 88 Date: April 10, 2012 Contractor: Mark Hurm Client: Swanson, Eric J Carmen P | Completion date: May 3, 2012 | Permit id: Bp-12-01665 | Parcel: 09021006000 | |||||
SCORE 88 Date: April 17, 2012 Contractor: Mark Hurm Client: Bearmann, Richard R Linda L | Completion date: April 19, 2012 | Permit id: Bp-12-01762 | Parcel: 06006066148 | |||||
SCORE 88 Date: April 18, 2012 Contractor: Mark Hurm Client: Sessions, Shirley | Completion date: May 9, 2012 | Permit id: Bp-12-01791 | Parcel: 10823097000 | |||||
SCORE 88 Date: April 25, 2012 Contractor: Mark Hurm Client: Shea & Sklenar | Completion date: May 10, 2012 | Permit id: Bp-12-01922 | Parcel: 06014011031 | |||||
SCORE 88 Date: May 1, 2012 Contractor: Mark Hurm Client: Davis & Marentes | Completion date: September 14, 2012 | Permit id: Bp-12-02030 | Parcel: 09003005026 | |||||
SCORE 88 Date: May 1, 2012 Contractor: Mark Hurm Client: Nesting, Robin S | Completion date: May 10, 2012 | Permit id: Bp-12-02029 | Parcel: 10625103000 | |||||
SCORE 88 Date: May 10, 2012 Contractor: Mark Hurm Client: Gresser, Marylyn E | Completion date: September 12, 2012 | Permit id: Bp-12-02157 | Parcel: 07333322000 | |||||
SCORE 88 Date: May 21, 2012 Contractor: Mark Hurm Client: Marquis, Chad W Kreshelle K | Completion date: September 19, 2012 | Permit id: Bp-12-02303 | Parcel: 09004043000 | |||||
SCORE 88 Date: May 21, 2012 Contractor: Mark Hurm Client: Dungan, Keith R | Completion date: September 26, 2012 | Permit id: Bp-12-02304 | Parcel: 06460090000 | |||||
SCORE 88 Date: May 31, 2012 Contractor: Mark Hurm Client: Mendoza & Middelkoop W H | Completion date: October 4, 2012 | Permit id: Bp-12-02516 | Parcel: 06432051000 | |||||
SCORE 88 Date: June 4, 2012 Contractor: Mark Hurm Client: Khan & Khan & Sherif | Completion date: December 7, 2012 | Permit id: Bp-12-02557 | Parcel: 07242110103 | |||||
SCORE 88 Date: June 5, 2012 Contractor: Mark Hurm Client: Kraft & Kraft Trustees | Completion date: July 3, 2012 | Permit id: Bp-12-02602 | Parcel: 06088005009 | |||||
SCORE 88 Date: May 31, 2012 Contractor: Mark Hurm Client: Chaperon, Colin N | Completion date: September 20, 2012 | Permit id: Bp-12-02514 | Parcel: 07333101000 | |||||
SCORE 88 Date: June 7, 2012 Contractor: Mark Hurm Client: Eop Llc | Completion date: October 31, 2012 | Permit id: Bp-12-02658 | Parcel: 06159003000 | |||||
SCORE 88 Date: June 11, 2012 Contractor: Mark Hurm Client: Boone & Hermann & Schmidt &, 13 Nw 23rd Ave Llc | Completion date: September 14, 2012 | Permit id: Bp-12-02729 | Parcel: 09003002002 | |||||
SCORE 88 Date: June 12, 2012 Contractor: Mark Hurm Client: Burke, Thomas Jr | Completion date: November 15, 2012 | Permit id: Bp-12-02745 | Parcel: 09004066000 | |||||
SCORE 88 Date: June 14, 2012 Contractor: Mark Hurm Client: Brinson, Robert F Jr Yvonne B | Completion date: October 11, 2012 | Permit id: Bp-12-02786 | Parcel: 06432070000 | |||||
SCORE 88 Date: June 14, 2012 Contractor: Mark Hurm Client: Educational Credit Union | Completion date: September 17, 2012 | Permit id: Bp-12-02789 | Parcel: 06107009001 | |||||
SCORE 88 Date: June 14, 2012 Contractor: Mark Hurm Client: Exchange Associates Of Georgia, Ltd Partnership | Completion date: October 11, 2012 | Permit id: Bp-12-02788 | Parcel: 07960048000 | |||||
SCORE 88 Date: June 21, 2012 Contractor: Mark Hurm Client: Coleman & Head | Completion date: November 21, 2012 | Permit id: Bp-12-02927 | Parcel: 06108050022 | |||||
SCORE 88 Date: June 22, 2012 Contractor: Mark Hurm Client: Jones, Judith R | Completion date: November 14, 2012 | Permit id: Bp-12-02959 | Parcel: 06481004000 | |||||
SCORE 88 Date: July 6, 2012 Contractor: Mark Hurm Client: Durant, Dennis D Patricia E | Completion date: January 25, 2013 | Permit id: Bp-12-03174 | Parcel: 06076201033 | |||||
SCORE 88 Date: July 6, 2012 Contractor: Mark Hurm Client: Rao, P V Premila | Completion date: December 4, 2012 | Permit id: Bp-12-03170 | Parcel: 06383030026 | |||||
SCORE 88 Date: July 13, 2012 Contractor: Mark Hurm Client: Cole, Patricia Z | Completion date: November 15, 2012 | Permit id: Bp-12-03314 | Parcel: 06107839073 | |||||
SCORE 88 Date: July 18, 2012 Contractor: Mark Hurm Client: Smith, Wanda M | Completion date: November 15, 2012 | Permit id: Bp-12-03400 | Parcel: 11577000000 | |||||
SCORE 88 Date: July 24, 2012 Contractor: Mark Hurm Client: Ewel, J J Katherine | Completion date: July 25, 2012 | Permit id: Bp-12-03487 | Parcel: 15413000000 | |||||
SCORE 88 Date: July 25, 2012 Contractor: Mark Hurm Client: Mclaughlin, Julia Anne | Completion date: October 31, 2012 | Permit id: Bp-12-03521 | Parcel: 06015002049 | |||||
SCORE 88 Date: July 30, 2012 Contractor: Mark Hurm Client: Kirkpatrick, G G Jr | Completion date: January 23, 2013 | Permit id: Bp-12-03625 | Parcel: 09500000000 | |||||
SCORE 88 Date: August 1, 2012 Contractor: Mark Hurm Client: Godfrey, Rose | Completion date: August 13, 2012 | Permit id: Bp-12-03661 | Parcel: 10160000000 | |||||
SCORE 88 Date: August 7, 2012 Contractor: Mark Hurm Client: Kendrick & Kohler | Completion date: October 8, 2012 | Permit id: Bp-12-03783 | Parcel: 06394010000 | |||||
SCORE 88 Date: August 23, 2012 Contractor: Mark Hurm Client: Stong & Stong Trustees | Completion date: February 22, 2013 | Permit id: Bp-12-04058 | Parcel: 06409017000 | |||||
SCORE 88 Date: August 27, 2012 Contractor: Mark Hurm Client: Werner, Dorothy R | Completion date: January 30, 2013 | Permit id: Bp-12-04097 | Parcel: 12258000000 | |||||
SCORE 88 Date: September 10, 2012 Contractor: Mark Hurm Client: Donnelly, Arthur R Marguerite D | Completion date: October 26, 2012 | Permit id: Bp-12-04299 | Parcel: 09019224000 | |||||
SCORE 88 Date: September 17, 2012 Contractor: Mark Hurm Client: Skelly, John L | Completion date: September 28, 2012 | Permit id: Bp-12-04470 | Parcel: 10600018000 | |||||
SCORE 88 Date: September 19, 2012 Contractor: Mark Hurm Client: Burrows, Colin Joyce | Completion date: September 20, 2012 | Permit id: Bp-12-04517 | Parcel: 06102075009 | |||||
SCORE 88 Date: September 20, 2012 Contractor: Mark Hurm Client: Wofford, David S Helen H | Completion date: October 26, 2012 | Permit id: Bp-12-04572 | Parcel: 06366003007 | |||||
SCORE 88 Date: September 20, 2012 Contractor: Mark Hurm Client: Lannon, Kurt M Heidi J L | Completion date: September 26, 2012 | Permit id: Bp-12-04573 | Parcel: 09013003037 | |||||
SCORE 88 Date: September 25, 2012 Contractor: Mark Hurm Client: Bragg & Bragg | Completion date: March 27, 2013 | Permit id: Bp-12-04628 | Parcel: 07915003015 | |||||
SCORE 88 Date: September 25, 2012 Contractor: Mark Hurm Client: Sullivan, Lucille M | Completion date: October 2, 2012 | Permit id: Bp-12-04664 | Parcel: 06017001002 | |||||
SCORE 88 Date: September 27, 2012 Contractor: Mark Hurm Client: Manos Family Revocable Trust, (the) | Completion date: April 16, 2013 | Permit id: Bp-12-04709 | Parcel: 10618015000 | |||||
SCORE 88 Date: September 27, 2012 Contractor: Mark Hurm Client: Leon Jr & Ortiz-Leon H W | Completion date: October 2, 2012 | Permit id: Bp-12-04742 | Parcel: 06014020052 | |||||
SCORE 88 Date: September 27, 2012 Contractor: Mark Hurm Client: Ruvel, Richard G Denise | Completion date: March 27, 2013 | Permit id: Bp-12-04741 | Parcel: 06014023000 | |||||
SCORE 88 Date: October 2, 2012 Contractor: Mark Hurm Client: Flint, Nancy | Completion date: January 23, 2013 | Permit id: Bp-12-04822 | Parcel: 06006066127 | |||||
SCORE 88 Date: October 16, 2012 Contractor: Mark Hurm Client: Quarterman, Laschelle R | Completion date: October 25, 2012 | Permit id: Bp-12-05072 | Parcel: 10765005000 | |||||
SCORE 88 Date: November 1, 2012 Contractor: Mark Hurm Client: Burke & Mccouch | Completion date: April 12, 2013 | Permit id: Bp-12-05416 | Parcel: 06460064000 | |||||
SCORE 88 Date: November 5, 2012 Contractor: Mark Hurm Client: Young, J P | Completion date: February 5, 2013 | Permit id: Bp-12-05424 | Parcel: 10857104000 | |||||
SCORE 88 Date: November 14, 2012 Contractor: Mark Hurm Client: Velez, Anna M | Completion date: November 30, 2012 | Permit id: Bp-12-05562 | Parcel: 06076060038 | |||||
SCORE 88 Date: November 14, 2012 Contractor: Mark Hurm Client: Kowol-Walcott, Gosia | Completion date: November 29, 2012 | Permit id: Bp-12-05599 | Parcel: 06015020032 | |||||
SCORE 88 Date: November 27, 2012 Contractor: Mark Hurm Client: Froscher, Marilyn F | Completion date: January 17, 2013 | Permit id: Bp-12-05815 | Parcel: 09013024012 | |||||
SCORE 88 Date: November 28, 2012 Contractor: Mark Hurm Client: Torres, Brenda | Completion date: December 12, 2012 | Permit id: Bp-12-05837 | Parcel: 10608001000 | |||||
SCORE 88 Date: November 28, 2012 Contractor: Mark Hurm Client: Fluriach, Laure M | Completion date: January 29, 2013 | Permit id: Bp-12-05838 | Parcel: 06415002027 | |||||
SCORE 88 Date: December 10, 2012 Contractor: Mark Hurm Client: Wells Fargo Abnk | Completion date: April 23, 2013 | Permit id: Bp-12-06029 | Parcel: 06095050012 | |||||
SCORE 88 Date: December 10, 2012 Contractor: Mark Hurm Client: Reisinger, Joan L | Completion date: May 9, 2013 | Permit id: Bp-12-06028 | Parcel: 08388000000 | |||||
SCORE 88 Date: December 17, 2012 Contractor: Mark Hurm Client: Rebstock Jr & Taylor H W | Completion date: May 9, 2013 | Permit id: Bp-12-06119 | Parcel: 07960055000 | |||||
SCORE 88 Date: December 18, 2012 Contractor: Mark Hurm Client: Debose, Bobbie J | Completion date: January 30, 2013 | Permit id: Bp-12-06181 | Parcel: 10823098000 | |||||
SCORE 88 Date: December 21, 2012 Contractor: Mark Hurm Client: Kwiatkowski & Kwiatkowski | Completion date: May 22, 2013 | Permit id: Bp-12-06241 | Parcel: 06102705000 | |||||
SCORE 88 Date: January 22, 2013 Contractor: Mark Hurm Client: Mosley, David E | Completion date: February 8, 2013 | Permit id: Bp-13-00336 | Parcel: 11541000000 | |||||
SCORE 88 Date: January 22, 2013 Contractor: Mark Hurm Client: Torres, Brenda | Completion date: February 1, 2013 | Permit id: Bp-13-00344 | Parcel: 10608001000 | |||||
SCORE 88 Date: January 29, 2013 Contractor: Mark Hurm Client: Owens, D H Mary | Completion date: February 12, 2013 | Permit id: Bp-13-00513 | Parcel: 06071010052 | |||||
SCORE 88 Date: February 4, 2013 Contractor: Mark Hurm Client: Carroll & Gailey H W | Completion date: April 19, 2013 | Permit id: Bp-13-00595 | Parcel: 06020050011 | |||||
SCORE 88 Date: February 4, 2013 Contractor: Mark Hurm Client: Carroll & Gailey H W | Completion date: April 19, 2013 | Permit id: Bp-13-00594 | Parcel: 06020050011 | |||||
SCORE 88 Date: February 4, 2013 Contractor: Mark Hurm Client: Whitley, Steven R Trustee | Completion date: May 2, 2013 | Permit id: Bp-13-00636 | Parcel: 09013006020 | |||||
SCORE 88 Date: January 22, 2013 Contractor: Mark Hurm Client: Gregory, Stephen W Brenda S | Completion date: February 6, 2013 | Permit id: Bp-13-00372 | Parcel: 06388018000 | |||||
SCORE 88 Date: November 14, 2012 Contractor: Mark Hurm Client: Winburn, Brenda E | Completion date: February 5, 2013 | Permit id: Bp-12-05566 | Parcel: 09013006026 | |||||
SCORE 88 Date: March 6, 2013 Contractor: Mark Hurm Client: Mcdowell, James H Betty | Completion date: June 4, 2013 | Permit id: Bp-13-01298 | Parcel: 08964060023 | |||||
SCORE 88 Date: March 12, 2013 Contractor: Mark Hurm Client: Grey & Lungrin Sr | Completion date: April 5, 2013 | Permit id: Bp-13-01432 | Parcel: 08990001002 | |||||
SCORE 88 Date: March 19, 2013 Contractor: Mark Hurm Client: Bass, David T Patrilla A | Completion date: June 4, 2013 | Permit id: Bp-13-01611 | Parcel: 06075030036 | |||||
SCORE 88 Date: March 20, 2013 Contractor: Mark Hurm Client: Black, Kathleen Doris Vloedman | Completion date: April 16, 2013 | Permit id: Bp-13-01668 | Parcel: 06076221021 | |||||
SCORE 88 Date: March 27, 2013 Contractor: Mark Hurm Client: Teague, Lawrence E | Completion date: April 18, 2013 | Permit id: Bp-13-01788 | Parcel: 06400020000 | |||||
SCORE 88 Date: April 8, 2013 Contractor: Mark Hurm Client: Stepp, John Richard | Completion date: June 7, 2013 | Permit id: Bp-13-01986 | Parcel: 07960016000 | |||||
SCORE 88 Date: April 15, 2013 Contractor: Mark Hurm Client: Coleman, Curtis Scott Anne H | Completion date: April 22, 2013 | Permit id: Bp-13-02144 | Parcel: 06090001011 | |||||
SCORE 88 Date: May 6, 2013 Contractor: Mark Hurm Client: Dejesus, Susan A | Completion date: May 23, 2013 | Permit id: Bp-13-02584 | Parcel: 07915002012 | |||||
SCORE 88 Date: May 13, 2013 Contractor: Mark Hurm Client: Bpd Llc | Completion date: July 24, 2013 | Permit id: Bp-13-02741 | Parcel: 06446040000 | |||||
SCORE 88 Date: June 25, 2013 Contractor: Mark Hurm Client: Arc Communities 6 Llc | Completion date: July 24, 2013 | Permit id: Bp-13-03620 | Parcel: 05983000000 | |||||
SCORE 88 Date: August 8, 2013 Contractor: Mark Hurm Client: Priest, Steven Jennifer M | Completion date: August 30, 2013 | Permit id: Bp-13-04609 | Parcel: 06366002015 | |||||
SCORE 88 Date: August 8, 2013 Contractor: Mark Hurm Client: Rush, Sharon E | Completion date: August 30, 2013 | Permit id: Bp-13-04606 | Parcel: 06088005002 | |||||
SCORE 88 Date: September 9, 2013 Contractor: Mark Hurm Client: Johnson, Lynda Life Estate | Completion date: October 30, 2013 | Permit id: Bp-13-05230 | Parcel: 11709000000 | |||||
SCORE 88 Contractor: Mark Hurm Client: Cinque, Vivian | Permit id: Bp-16-02071-01 | Parcel: 12951001000 |