Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 1112-addition to sfd Permit type: Building (bu) single | Current use: Single family dwelling | Permit id: 1506031019 | |||||
SCORE 79 Permit type: Building single family addition | Current use: Single family dwelling | Permit id: 1506031019 | |||||
SCORE 79 Permit type: Building single family addition | Current use: Single family dwelling | Permit id: 1506031019 | |||||
SCORE 79 2326 Fillmore St San Francisco Ca Lateral 4" backed up snake drain demo walls and floor to get to backed up drain replaced rotten drains at back toilet repl toilet line and partial landing line bath sink and line Date: August 29, 2011 Contractor: Leonardo Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20110829632 | |||||
SCORE 79 Unit 360 / 3 Collingwood St San Francisco Ca 3rd floor bathroom remodel - 3 lights 3 switches 1 receptacl 1 fan 2 smoke detectors Date: April 24, 2013 Contractor: Leonardo Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E20130424213 | |||||
SCORE 79 Unit 360 / 3 Collingwood St San Francisco Ca Rough and finish for toilet shower pan thermostatic valve head sink and faucet hybrid water heater Date: April 24, 2013 Contractor: Leonardo Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130424225 | |||||
SCORE 79 Unit 201 / 73 Sumner St San Francisco Ca Install new shower valve head drain shower pan install new vanity supply and drain Date: August 25, 2011 Contractor: Leonardo Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20110825548 | |||||
SCORE 79 Date: September 16, 2013 Contractor: Leonardo Construction Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20130916171 |