SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after hours permit covers the capitol crossing platform, garage, tunnel, bridges and concourse work including the enabling work and foundation work. Work will take place monday-saturday, 24 hours a day in highway i-395, and on sunday from 8am to 8pm starting 12 5 2016 and concluding 1 5 2015. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1400102 and fd1400148, and by ddot under permit nos. Pa-101902. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: December 7, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700239 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocations and foundation work for the capitol crossing project. Work will take place monday-friday from 7pm to 12am, and on sunday from 8am to 8pm, starting 12 5 16 and concluding 1 1 17. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: December 7, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700238 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocations and foundation work associated with the capitol crossing project. Work will take place on monday-friday from 7pm to 12am and on sunday from 8am to 8pm starting 3/1/16 and concluding 4/1/16. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: October 6, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700021 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after hours permit covers the capitol crossing platform, garage, tunnel, bridges and concourse work including the enabling work and foundation work. Work will take place monday-saturday, 24 hours a day in i-395 the highway from 12:00am to 11:59pm and on sunday from 8am to 8pm starting 11 5 2016 and concluding 12 6 2016. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1400102 and fd1400148. Ddot has permitted the work intended under permit nos. Pa-101902. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: November 8, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700132 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after hours permit covers the capitol crossing platform, garage, tunnel, bridges and concourse work including the enabling work and foundation work. Work will take place monday-saturday, 24 hours a day in highway i-395, and on sunday from 8am to 8pm. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1400102 and by ddot under permit nos. Pa-101902. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations, and construction noise is not to exceed an average level of 85 decibels. Date: January 5, 2017 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700327 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocations and foundation work for the capitol crossing project. Work will take place monday-friday from 7pm to 12am, and on sunday from 8am to 8pm. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: January 5, 2017 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700326 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocation and foundation work for the capitol crossing project. Work will take place monday-friday from 7pm to 12am, and on sunday from 8am to 8pm. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: May 4, 2017 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700810 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after hours permit covers the capitol crossing platform, garage, tunnel, bridges and concourse work, including the enabling work and foundation work. Work will take place monday-saturday, 24 hours a day in highway i-395, and on sunday from 8am to 8pm. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1400102 and by ddot under permit nos. Pa-101902. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations, and construction noise is not to exceed an average level of 85 decibels. Date: May 4, 2017 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700809 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocation and foundation work for the capitol crossing project. Work will take place monday-friday from 7pm to 12am, and on sunday from 8am to 8pm. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations, and construction noise is not to exceed an average level of 85 decibels. Date: March 27, 2017 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700627 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after-hours work permit is specifically scoped to cover all capitol crossing project work occuring at the capx project site for sunday 01 15 . Work is permitted by dcra under permits b1505467 and b1609577. Ddot has permitted this work under permit pa-116283-r1. Dcra has permitted after-hours work for this time span under permits under ah1700238 and ah1700239. This permit applies specifically to the labor day work moratorium, and all work is to progress as scheduled during that time. No work january 16 martin luther king jr. Day or january 20, 2017 - inauguration day please note additional restrictions on work may apply 1 16 2017 - 1 21 2017 due to inauguration activities Date: January 12, 2017 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700383 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 Support of excavation at the capitol crossing project, 222 massachusetts ave nw, west side, south block. Date: May 15, 2017 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1700038 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 Installation of soe at the capital crossing project, 222 mass ave nw. Date: March 27, 2017 Contractor: Lds Cph Llc; Interagency Client: Capitol Crossing Ii Llc | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1700004 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after hours permit covers the capitol crossing platform, garage, tunnel, bridges and concourse work including the enabling work and foundation work. Work will take place monday-saturday, 24 hours a day in i-395/the highway from 12:00am to 11:59pm and on sunday from 8am to 8pm starting 7/5/2016 and concluding 12/31/2016. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1400102 and fd1400148. Ddot has permitted the work intended under permit nos. Pa-101902. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: July 5, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600850 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocations and foundation work associated with ddots 395-tunnel project, also known as the capitol crossing project. Work will take place on monday-friday from 7pm to 12am and on sunday from 8am to 8pm starting 7/5/16 and concluding 12/31/16. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: July 5, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600851 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after hours permit covers the capitol crossing platform, garage, tunnel, bridges and concourse work including the enabling work and foundation work. Work will take place monday-saturday, 24 hours a day in i-395/the highway from 12:00am to 11:59pm and on sunday from 8am to 8pm starting 6/3/2016 and concluding 7/5/2015. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1400102 and fd1400148. Ddot has permitted the work intended under permit nos. Pa-101902. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: June 3, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600765 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocations and foundation work associated with ddots 395-tunnel project, also known as the capitol crossing project. Work will take place on monday-friday from 7pm to 12am and on sunday from 8am to 8pm starting 6/3/16 and concluding 7/5/16. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: June 3, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600766 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This work includes utility relocations and foundation work associated with the capitol crossing project. Work will take place on monday-friday from 7pm to 12am and on sunday from 8am to 8pm starting 3 1 16 and concluding 4 1 16. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1300040. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: November 8, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700131 | |||||
SCORE 82 222 Massachusetts Ave Nw, Washington, Dc 20001 This after hours permit covers the capitol crossing platform, garage, tunnel, bridges and concourse work including the enabling work and foundation work. Work will take place monday-saturday, 24 hours a day in i-395/the highway from 12:00am to 11:59pm and on sunday from 8am to 8pm starting 11/4/2016 and concluding 11/6/2016. This work is located in the ddot right-of-way and has been permitted by dcra under bciv1400102 and fd1400148. Ddot has permitted the work intended under permit nos. Pa-101902. This permit includes exemption from noise provisions set forth in section 2707 of title of the dc municipal regulations and construction noise is not to exceed an average level of 85 decibels. Date: October 6, 2016 Contractor: Lds Cph Llc; Interagency Client: Lds Cph Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700020 | |||||
SCORE 82 2 Massachusetts Ave Nw, Washington, Dc 20001 New building at 2 massachusetts ave nw. This work includes the above-grade building only, and will be constructed on sub-grade pad permitted previously under b1505467, fd1500056 and bciv1400102. Tpr zoning approval for phase-1 z. C. Order no. 08-34 and 80-34e consisting of a new 12-story ( 5 cellar levels below grade; p-1 through p-4 parking; p loading/mech & concourse on the west side; east side has one below grade concourse level) mixed-use building consisting of parking/loading on below grade levels, retail on 1st floor and office on 2nd through 12th floors. Roof penthouse above 12th floor. (automobile/bicycle parking, loading and service spaces approved under b1505467). Date: September 14, 2016 Contractor: Lds Cph Llc; Interagency Client: Capitol Crossing I Llc | Permit type: New building | Permit status: Permit issued | Permit id: B1609577 |