Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 935 Miami Wy Boulder Co Interior remodel of existing master bedroom. Includes the removal of existing tub shower and replacement with new separate tub & shower, one new toilet and two new vanities, and framing in a walk-in closet. Replace existing water heater in basement. Move washerdryerintobasement. Remove stove and hood from basement. Adding new can lights to first floor. Remove wall in basement and add new wall.. Replce shower pan in basement.. Moving wall in bedroom and creating new closet.. New gas line for gas range. Move sink. Adding patio door where window was. No structural change. Remove old back door. Move stairs from new pation door. Owner contractor. Client: Karen Neff | Applicant: Karen Neff | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 22, 2006 | Current use: Single family d |