SCORE

INTEGRITY ELECTRIC INC

ABOUT INTEGRITY ELECTRIC INC

Integrity Electric Inc specializes in:

Integrity Electric Inc offers services:

Based on the information received from , associated with Integrity Electric Inc over the past .

If you are considering hiring Integrity Electric Inc for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Integrity Electric Inc has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
98
19 Jefferson St San Francisco Ca
In the garage next to the meter main panel install customer provided tesla high powered wall charger. Extend 1" emt surface mount from the panel 5 ft. Pull #2 thhn copper wire. Mount and wire charger.
Date:  January 9, 2015

Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20150105941
2015/01/0909819 Jefferson St San Francisco CaIntegrity Electric Inc
SCORE
98
894 Chestnut St San Francisco Ca
From the meter main panel to the garage install a amp dedicated circuit to a nema 14- receptacle.
Date:  July 30, 2014

Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20140724723
2014/07/30098894 Chestnut St San Francisco CaIntegrity Electric Inc
SCORE
98
2483 41st Av San Francisco Ca
Installations of home run circuits to kitchen and bath room.
Date:  March 3, 2015

Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20150203461
2015/03/030982483 41st Av San Francisco CaIntegrity Electric Inc
SCORE
98
2725 Pacific Av San Francisco Ca
In the garage to the left of the 2 amp sub panel install a 2 volt 1 amp car charging station.
Date:  March 10, 2015

Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20150306381
2015/03/100982725 Pacific Av San Francisco CaIntegrity Electric Inc
SCORE
98
27 Lyon St San Francisco Ca
We will install a 50a 240v car charging receptacle
Date:  November 17, 2015

Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20151117761
2015/11/1709827 Lyon St San Francisco CaIntegrity Electric Inc
SCORE
98
375 17th Av San Francisco Ca
At the main panel install a nema 14- plug and a nema 14- plug surface mount directly below the panel.
Date:  September 15, 2014

Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20140903422
2014/09/15098375 17th Av San Francisco CaIntegrity Electric Inc
SCORE
98
Unit 5 / 20 Broadway San Francisco Ca
We are installing a 50a 240v electric car charging receptacle.
Date:  December 18, 2015

Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20151218421
2015/12/1809820 Broadway San Francisco CaIntegrity Electric Inc
SCORE
98
446 Lake St San Francisco Ca
In the garage provide and install a 240v 50a electric vehicle charging receptacle
Date:  March 4, 2016

Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201602015890
2016/03/04098446 Lake St San Francisco CaIntegrity Electric Inc
SCORE
98
2828 Greenwich St San Francisco Ca
Install of a 240v 50a car charging station
Date:  March 30, 2016

Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201603116776
2016/03/300982828 Greenwich St San Francisco CaIntegrity Electric Inc
SCORE
98
223 Cherry St San Francisco Ca
We are installing a 240v ev car charging receptacle
Date:  April 14, 2016

Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201604147518
2016/04/14098223 Cherry St San Francisco CaIntegrity Electric Inc
SCORE
98
168 Brush Creek Rd Santa Rosa Ca
New main panels for units 164 and 168.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3529
2012/10/03098168 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
178 Brush Creek Rd Santa Rosa Ca
New main panels for units 174 and 178.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3532
2012/10/03098178 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
186 Brush Creek Rd Santa Rosa Ca
New main panels for units 1 and 186.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3528
2012/10/03098186 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
162 Brush Creek Rd Santa Rosa Ca
New main panels for units 162 and 166.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3531
2012/10/03098162 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
174 Brush Creek Rd Santa Rosa Ca
New main panels for units 174 and 178.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3532
2012/10/03098174 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
1 Brush Creek Rd Santa Rosa Ca
New main panels for units 1 and 186.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3528
2012/10/030981 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
176 Brush Creek Rd Santa Rosa Ca
New main panels for units 1 and 176.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3530
2012/10/03098176 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
1 Brush Creek Rd Santa Rosa Ca
New main panels for units 1 and 176.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3530
2012/10/030981 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
166 Brush Creek Rd Santa Rosa Ca
New main panels for units 162 and 166.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3531
2012/10/03098166 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
164 Brush Creek Rd Santa Rosa Ca
New main panels for units 164 and 168.
Date:  October 3, 2012

Permit status: Finaled | Permit id: B12-3529
2012/10/03098164 Brush Creek Rd Santa Rosa CaIntegrity Electric Inc
SCORE
98
3011 Sw Barton St Seattle Wa
Adding 2 circuit for recepticals and lights
Date:  March 25, 2005

Permit type: Electrical | Permit status: Permit finaled | Completion date: May 6, 2005 | Expiration date: March 25, 2006 | Current use: Single family / duplex | Permit id: 6054478
2005/03/250983011 Sw Barton St Seattle WaIntegrity Electric Inc
SCORE
98
667 S King St Seattle Wa
Renovate ti space with new lights & (2) receptacles
Date:  October 22, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: November 29, 2004 | Expiration date: October 22, 2005 | Current use: Commercial | Permit id: 6045178
2004/10/22098667 S King St Seattle WaIntegrity Electric Inc
SCORE
98
12 Ne Pacific St Seattle Wa
Add espresso bar, henderson hall room 172
Date:  July 28, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: September 20, 2004 | Expiration date: July 28, 2005 | Current use: Commercial | Permit id: 6039480
2004/07/2809812 Ne Pacific St Seattle WaIntegrity Electric Inc
SCORE
98
75 Detroit Ave Sw Seattle Wa
Rewire office and shop area; install data & voice cables
Date:  May 28, 2004
Value:   $70,000

Permit type: Electrical | Permit status: Permit finaled | Completion date: July 13, 2004 | Expiration date: May 28, 2005 | Current use: Commercial | Permit id: 6036083
2004/05/28700009875 Detroit Ave Sw Seattle WaIntegrity Electric Inc
SCORE
98
115 Occidental Ave S Seattle Wa
Add circuit for gas heater. 1st floor
Date:  May 11, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: May 12, 2004 | Expiration date: May 11, 2005 | Current use: Commercial | Permit id: 6034989
2004/05/11098115 Occidental Ave S Seattle WaIntegrity Electric Inc
SCORE
98
3004 West Laurelhurst Dr Ne Seattle Wa
Install electrical circuits for new heat pump and furnace sfr.
Date:  January 27, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: February 8, 2007 | Expiration date: January 27, 2005 | Current use: Single family / duplex | Permit id: 6029086
2004/01/270983004 West Laurelhurst Dr Ne Seattle WaIntegrity Electric Inc
SCORE
98
9 S Jackson St Seattle Wa
Relocate (5) duplex receptacles, & (2) 2x4 light fixtures
Date:  December 4, 2003

Permit type: Electrical | Permit status: Permit finaled | Completion date: December 8, 2003 | Expiration date: December 4, 2004 | Current use: Commercial | Permit id: 6026601
2003/12/040989 S Jackson St Seattle WaIntegrity Electric Inc
SCORE
98
1705 Ne Pacific St Seattle Wa
Closed as incompleteremodel of 2nd floor office of oceanography bldg
Date:  May 6, 2003
Value:   $23,000

Permit type: Electrical | Permit status: Permit closed | Expiration date: May 6, 2004 | Current use: Institutional | Permit id: 6014213
2003/05/0623000981705 Ne Pacific St Seattle WaIntegrity Electric Inc
SCORE
98
135 Linden Ave N Seattle Wa
Relocate existing light fixture and install dual switchingadd outlets & wiremold. Install 1 amp sub panel.
Date:  March 19, 2003

Permit type: Electrical | Permit status: Permit finaled | Completion date: April 24, 2003 | Expiration date: March 19, 2004 | Current use: Commercial | Permit id: 6012590
2003/03/19098135 Linden Ave N Seattle WaIntegrity Electric Inc
SCORE
98
3602 24th Ave S Seattle Wa
Install new 2 amp service.
Date:  February 13, 2003

Permit type: Electrical | Permit status: Permit finaled | Completion date: February 14, 2003 | Expiration date: February 13, 2004 | Current use: Single family / duplex | Permit id: 6010898
2003/02/130983602 24th Ave S Seattle WaIntegrity Electric Inc
SCORE
98
3923 Okanogan Ln Ne Seattle Wa
Wiring of ground floor & demo
Date:  January 4, 2011
Value:   $81,165

Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2011 | Expiration date: January 4, 2012 | Current use: Institutional | Permit id: 6268199
2011/01/0481165983923 Okanogan Ln Ne Seattle WaIntegrity Electric Inc
SCORE
98
3923 Okanogan Ln Ne Seattle Wa
F a t. I. To tie into existing system; this is a joint venture w simplexgrinnell & integrity electric inc.
Date:  February 17, 2011

Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2011 | Expiration date: February 17, 2012 | Current use: Commercial | Permit id: 6273788
2011/02/170983923 Okanogan Ln Ne Seattle WaIntegrity Electric Inc
SCORE
98
1705 Ne Pacific St Seattle Wa
Installing f a ti. Joint venture w integrity electric & simplexgrinnell
Date:  October 12, 2011

Permit type: Electrical | Permit status: Permit closed | Completion date: December 20, 2011 | Expiration date: October 12, 2012 | Current use: Commercial | Permit id: 6297976
2011/10/120981705 Ne Pacific St Seattle WaIntegrity Electric Inc
SCORE
98
1705 Ne Pacific St Seattle Wa
Day get started: for wall & ceiling cover only, ref #6299079
Date:  October 18, 2011

Permit type: Electrical | Permit status: Permit closed | Completion date: December 20, 2011 | Expiration date: November 18, 2011 | Current use: Institutional | Permit id: 6299081
2011/10/180981705 Ne Pacific St Seattle WaIntegrity Electric Inc
SCORE
98
1705 Ne Pacific St Seattle Wa
Wire existing lab into office space
Date:  November 21, 2011
Value:   $45,000

Permit type: Electrical | Permit status: Permit closed | Completion date: December 20, 2011 | Expiration date: November 21, 2012 | Current use: Institutional | Permit id: 6299079
2011/11/2145000981705 Ne Pacific St Seattle WaIntegrity Electric Inc
SCORE
98
10516 Lake City Way Ne Seattle Wa
Install temporary service for construction 1 amp service. 2 13 04 cw - about to expire letter sent 2 12 04.
Date:  March 19, 2003

Permit type: Electrical | Permit status: Permit finaled | Completion date: January 12, 2005 | Expiration date: March 19, 2004 | Current use: Commercial | Permit id: 6012589
2003/03/1909810516 Lake City Way Ne Seattle WaIntegrity Electric Inc
SCORE
98
305 Harrison St Seattle Wa
Remodel 3rd flr mens bathroom; replacing existing lights. 5 19 04 mvc: adding 17 lights.
Date:  February 17, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: May 21, 2004 | Expiration date: February 17, 2005 | Current use: Commercial | Permit id: 6030222
2004/02/17098305 Harrison St Seattle WaIntegrity Electric Inc
SCORE
98
825 Yesler Way Seattle Wa
Replace existing light fixtures w/new, add circuit for rooftop hvac, remove baseboard heating, add circuits for mircro, hot water tank, & rooftop circuit. 12/12/03 bew address correction from 903 e yesler wy
Date:  December 4, 2003

Permit type: Electrical | Permit status: Permit finaled | Completion date: December 31, 2003 | Expiration date: December 4, 2004 | Current use: Commercial | Permit id: 6026603
2003/12/04098825 Yesler Way Seattle WaIntegrity Electric Inc
SCORE
98
12232 Densmore Ave N Seattle Wa
Add amp circuit for a/c unit. Sfr
Date:  May 11, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: May 21, 2004 | Expiration date: May 11, 2005 | Current use: Single family / duplex | Permit id: 6034988
2004/05/1109812232 Densmore Ave N Seattle WaIntegrity Electric Inc
SCORE
98
50 Beach Dr Sw Seattle Wa
Adding a 45 amp circuit for a/c unit
Date:  December 20, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: May 2, 2005 | Expiration date: December 20, 2005 | Current use: Single family / duplex | Permit id: 6048776
2004/12/2009850 Beach Dr Sw Seattle WaIntegrity Electric Inc
SCORE
98
411 15th Ave E Seattle Wa
Adding a circuit for a 5 ton a/c unit
Date:  June 22, 2004

Permit type: Electrical | Permit status: Permit finaled | Completion date: July 21, 2004 | Expiration date: June 22, 2005 | Current use: Commercial | Permit id: 6037397
2004/06/22098411 15th Ave E Seattle WaIntegrity Electric Inc
SCORE
98
Unit 1 / 3233 Jackson St San Francisco Ca
125a rated main panel on a amp 2 volt main breaker for unit #1 at the meter socket & main panel location install a new interior 125 amp rated panel. The existing meter socket is to remain. The old (challenger) panel is to be removed and replaced with an 8/16 nema 1 load center with a amp main breaker. The amp main breaker is to be secured with a "hold down kit" that will hold the breaker in place as required by code.
Date:  January 22, 2016

Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201601225725
2016/01/220983233 Jackson St San Francisco CaIntegrity Electric Inc
SCORE
98
1815 Jackson St San Francisco Ca
We are installing a 125a meter main panel as well as a car charging receptacle
Date:  July 12, 2017

Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201707126604
2017/07/120981815 Jackson St San Francisco CaIntegrity Electric Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.