SCORE

HYBRID CONSTRUCTION ENGINEERING GROUP

ABOUT HYBRID CONSTRUCTION ENGINEERING GROUP

Hybrid Construction Engineering Group specializes in:

Hybrid Construction Engineering Group offers services:

Based on the information received from , associated with Hybrid Construction Engineering Group over the past .

If you are considering hiring Hybrid Construction Engineering Group for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Hybrid Construction Engineering Group has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
73
12 Sumner Road Se Washington Dc
Install water, sanitary and storm service for barry farm recreation center
Date:  April 30, 2014

Client: Hybrid Construction | Permit type: Excavation; clean out | Permit status: Permit expired | Expiration date: June 29, 2014 | Permit id: Pa85747-R1
2014/04/3007312 Sumner Road Se Washington DcHybrid Construction Engineering Group
SCORE
73
12 Sumner Road Se Washington Dc
Excavation; clean out (sewer), excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; storm main line (trench), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench), excavation; water meter manhole (over 2" pipe)
Date:  August 15, 2013

Client: Hybrid Construction | Permit type: Excavation; clean out | Permit status: Permit expired | Expiration date: April 30, 2014 | Permit id: Pa85747
2013/08/1507312 Sumner Road Se Washington DcHybrid Construction Engineering Group
SCORE
73
12 Sumner Road Se Washington Dc
Excavation; clean out (sewer), excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; storm main line (trench), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench), excavation; water meter manhole (over 2" pipe)
Date:  February 4, 2015

Client: Hybrid Construction | Permit type: Excavation; clean out | Permit status: Permit expired | Expiration date: April 5, 2015 | Permit id: Pa85747-R5
2015/02/0407312 Sumner Road Se Washington DcHybrid Construction Engineering Group
SCORE
73
12 Sumner Road Se Washington Dc
Install water, sanitary and storm service for barry farm recreation center
Date:  October 6, 2014
Value:   $1,832

Client: Hybrid Construction | Permit type: Excavation; clean ou | Permit id: Pa85747-R3
2014/10/0618327312 Sumner Road Se Washington DcHybrid Construction Engineering Group
SCORE
73
12 Sumner Road Se Washington Dc
Install water, sanitary and storm service for barry farm recreation center
Date:  February 4, 2015
Value:   $1,832

Client: Hybrid Construction | Permit type: Excavation; clean ou | Permit id: Pa85747-R5
2015/02/0418327312 Sumner Road Se Washington DcHybrid Construction Engineering Group
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.