Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 29 Van Ness St Nw, Washington, Dc 20008 Remove an existing 20k gallon storage tank in an existing parking lot. Area of excavation is 2 sf. Tank to be backfilled upon immediate removal of tank. Temporary stockpile of excavated dirt to be covered to prevent transport of sediment. Date: April 22, 2016 Contractor: Howard University; Bhoopendra Prakash Prakash Client: Howard University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1600038 |