SCORE 96 Date: November 14, 2012 Contractor: Harold D Johnson Client: Bradley E Singer | Permit status: Completed | Permit id: P1301016 | |||||
SCORE 96 Date: October 15, 2012 Contractor: Harold D Johnson Client: Sharon Wesley | Permit status: Completed | Permit id: M1300100 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Michael D Abrams | Permit status: Permit issued | Permit id: P1202639 | |||||
SCORE 96 Date: September 12, 2012 Contractor: Harold D Johnson Client: Monica Bussolati | Permit status: Completed | Permit id: P1207982 | |||||
SCORE 96 Date: August 7, 2012 Contractor: Harold D Johnson Client: Edna M Batzell | Permit status: Completed | Permit id: P1207105 | |||||
SCORE 96 Date: March 28, 2012 Contractor: Harold D Johnson Client: Mccabe | Permit status: Permit issued | Permit id: M1201404 | |||||
SCORE 96 Date: September 11, 2012 Contractor: Harold D Johnson Client: Meyer Kestnbaum | Permit status: Permit issued | Permit id: M1202934 | |||||
SCORE 96 Date: August 28, 2012 Contractor: Harold D Johnson Client: Lara Logan | Permit status: Completed | Permit id: P1207613 | |||||
SCORE 96 Date: October 31, 2012 Contractor: Harold D Johnson Client: Three Headed Llc | Permit status: Completed | Permit id: P1300661 | |||||
SCORE 96 Date: October 11, 2012 Contractor: Harold D Johnson Client: Thomas G Brokaw | Permit status: Permit issued | Permit id: M1300090 | |||||
SCORE 96 Date: August 28, 2012 Contractor: Harold D Johnson Client: Nicholas J Patterson | Permit status: Completed | Permit id: P1207614 | |||||
SCORE 96 Date: October 1, 2012 Contractor: Harold D Johnson Client: Keith W Stiles | Permit status: Permit issued | Permit id: P1300024 | |||||
SCORE 96 Date: June 7, 2012 Contractor: Harold D Johnson Client: Nancy B Mcgovern | Permit status: Completed | Permit id: P1205682 | |||||
SCORE 96 Date: June 11, 2012 Contractor: Harold D Johnson Client: Charles T Clark | Permit status: Permit issued | Permit id: P1205767 | |||||
SCORE 96 Date: May 22, 2012 Contractor: Harold D Johnson Client: Mehdi Fateh | Permit status: Permit issued | Permit id: P1205309 | |||||
SCORE 96 Date: June 18, 2012 Contractor: Harold D Johnson Client: Laura A Macedo | Permit status: Permit issued | Permit id: M1202086 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: Welsh Strawbridge | Permit status: Permit issued | Permit id: M1300269 | |||||
SCORE 96 Date: March 26, 2012 Contractor: Harold D Johnson Client: Pamela S Reznick | Permit status: Completed | Permit id: M1201385 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: William S Burke | Permit status: Permit issued | Permit id: P1202640 | |||||
SCORE 96 Date: March 14, 2012 Contractor: Harold D Johnson Client: Nelson W Cunningham | Permit status: Permit issued | Permit id: P1203776 | |||||
SCORE 96 Date: March 19, 2012 Contractor: Harold D Johnson Client: Sam Reid | Permit status: Completed | Permit id: P1203889 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: Deborah J Lewis | Permit status: Permit issued | Permit id: M1300268 | |||||
SCORE 96 Date: July 11, 2012 Contractor: Harold D Johnson Client: Marion P Gesell Trustee | Permit status: Completed | Permit id: M1202320 | |||||
SCORE 96 Date: February 28, 2012 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1203479 | |||||
SCORE 96 Date: August 20, 2012 Contractor: Harold D Johnson Client: J C Garrison | Permit status: Permit issued | Permit id: P1207435 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Adam B Isacson | Permit status: Completed | Permit id: M1200909 | |||||
SCORE 96 Date: January 30, 2012 Contractor: Harold D Johnson Client: Katherine Gensler | Permit status: Permit issued | Permit id: P1202727 | |||||
SCORE 96 Date: January 4, 2012 Contractor: Harold D Johnson Client: Emanuel Voyatzis | Permit status: Completed | Permit id: P1202192 | |||||
SCORE 96 Date: February 3, 2012 Contractor: Harold D Johnson Client: Michael Frame | Permit status: Completed | Permit id: M1200966 | |||||
SCORE 96 Date: February 28, 2012 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1203480 | |||||
SCORE 96 Date: May 7, 2012 Contractor: Harold D Johnson Client: Roger S Hillas Jr | Permit status: Permit issued | Permit id: M1201728 | |||||
SCORE 96 Date: September 21, 2012 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: M1203063 | |||||
SCORE 96 Date: August 7, 2012 Contractor: Harold D Johnson Client: Philip G Dufour | Permit status: Permit issued | Permit id: P1207102 | |||||
SCORE 96 Date: August 16, 2012 Contractor: Harold D Johnson Client: Georgina Canales-Gex | Permit status: Completed | Permit id: P1207361 | |||||
SCORE 96 Date: July 25, 2012 Contractor: Harold D Johnson Client: E Graves | Permit status: Completed | Permit id: M1202457 | |||||
SCORE 96 Date: January 20, 2012 Contractor: Harold D Johnson Client: Mauricette O Hallet | Permit status: Completed | Permit id: M1200874 | |||||
SCORE 96 Date: May 18, 2012 Contractor: Harold D Johnson Client: Tracy Davis | Permit status: Permit issued | Permit id: P1205270 | |||||
SCORE 96 Date: November 21, 2012 Contractor: Harold D Johnson Permit status: Completed | Permit id: M1300396 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: The Hat House Llc | Permit status: Permit issued | Permit id: P1300799 | |||||
SCORE 96 Date: March 28, 2012 Contractor: Harold D Johnson Client: Richard C Fritsch | Permit status: Permit issued | Permit id: P1204111 | |||||
SCORE 96 Date: January 20, 2012 Contractor: Harold D Johnson Client: John J Hanlon | Permit status: Completed | Permit id: M1200873 | |||||
SCORE 96 Date: July 12, 2012 Contractor: Harold D Johnson Client: E Smith Yewell | Permit status: Permit issued | Permit id: P1206459 | |||||
SCORE 96 Date: June 19, 2012 Contractor: Harold D Johnson Client: A. Sachdev | Permit status: Permit issued | Permit id: P1205967 | |||||
SCORE 96 Date: January 17, 2012 Contractor: Harold D Johnson Client: Hsbc Mortgage Corporation Usa | Permit status: Permit issued | Permit id: P1202434 | |||||
SCORE 96 Date: February 19, 2013 Contractor: Harold D Johnson Client: Sara M Hazelwood | Permit status: Permit issued | Permit id: P1302972 | |||||
SCORE 96 Date: May 1, 2013 Contractor: Harold D Johnson Client: Paul Shin | Permit status: Permit issued | Permit id: P1304673 | |||||
SCORE 96 Date: April 19, 2013 Contractor: Harold D Johnson Client: Jeffrey D Blum | Permit status: Permit issued | Permit id: P1304387 | |||||
SCORE 96 Date: February 11, 2013 Contractor: Harold D Johnson Client: Kevin W Carr | Permit status: Completed | Permit id: M1300919 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: M1400314 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Client: K Karr | Permit status: Completed | Permit id: M1400315 | |||||
SCORE 96 Date: September 5, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: M1302834 | |||||
SCORE 96 Date: September 5, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: M1302835 | |||||
SCORE 96 Date: September 25, 2013 Contractor: Harold D Johnson Client: Ximena V Del Carpio | Permit status: Permit issued | Permit id: M1303023 | |||||
SCORE 96 Date: October 16, 2013 Contractor: Harold D Johnson Client: James I Valentine | Permit status: Completed | Permit id: M1400127 | |||||
SCORE 96 Date: October 1, 2013 Contractor: Harold D Johnson Client: Richard F Griffin | Permit status: Completed | Permit id: M1400013 | |||||
SCORE 96 Date: November 19, 2013 Contractor: Harold D Johnson Client: Michael Diamant | Permit status: Completed | Permit id: M1400493 | |||||
SCORE 96 Date: October 24, 2013 Contractor: Harold D Johnson Client: Louise B Sindler | Permit status: Completed | Permit id: M1400260 | |||||
SCORE 96 Date: November 22, 2013 Contractor: Harold D Johnson Client: Hanlon Design Build Inc | Permit status: Completed | Permit id: M1400532 | |||||
SCORE 96 Date: May 3, 2013 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: M1301613 | |||||
SCORE 96 Date: September 4, 2013 Contractor: Harold D Johnson Client: Toni C Bickart | Permit status: Permit canceled | Permit id: P1307644 | |||||
SCORE 96 Date: March 19, 2013 Contractor: Harold D Johnson Client: Shelley H Guiley | Permit status: Permit issued | Permit id: M1301161 | |||||
SCORE 96 Date: April 8, 2013 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: M1301322 | |||||
SCORE 96 Date: May 22, 2013 Contractor: Harold D Johnson Client: Richard J Mann | Permit status: Permit issued | Permit id: M1301781 | |||||
SCORE 96 Date: November 19, 2013 Contractor: Harold D Johnson Client: Jorge Guajardo | Permit status: Permit issued | Permit id: M1400492 | |||||
SCORE 96 Date: November 22, 2013 Contractor: Harold D Johnson Client: Peter Bernard Robinson Trustee | Permit status: Permit issued | Permit id: M1400531 | |||||
SCORE 96 Date: November 20, 2013 Contractor: Harold D Johnson Client: John W Low | Permit status: Completed | Permit id: P1401337 | |||||
SCORE 96 Date: August 8, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: P1307059 | |||||
SCORE 96 Date: August 8, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: P1307060 | |||||
SCORE 96 Date: March 15, 2013 Contractor: Harold D Johnson Client: Amy L Riella | Permit status: Completed | Permit id: P1303555 | |||||
SCORE 96 Date: July 17, 2013 Contractor: Harold D Johnson Client: Larry Kanarek | Permit status: Completed | Permit id: P1306451 | |||||
SCORE 96 Date: May 29, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1305296 | |||||
SCORE 96 Date: October 3, 2013 Contractor: Harold D Johnson Client: J C Garrison | Permit status: Completed | Permit id: P1400111 | |||||
SCORE 96 Date: October 18, 2013 Contractor: Harold D Johnson Client: Barbara J Richardson | Permit status: Completed | Permit id: P1400506 | |||||
SCORE 96 Date: January 28, 2013 Contractor: Harold D Johnson Client: L C Carter | Permit status: Completed | Permit id: P1302445 | |||||
SCORE 96 Date: January 28, 2013 Contractor: Harold D Johnson Client: Elissa M Alben | Permit status: Completed | Permit id: P1302446 | |||||
SCORE 96 Date: March 20, 2013 Contractor: Harold D Johnson Client: Ck Capital Investments Llc | Permit status: Completed | Permit id: P1303645 | |||||
SCORE 96 Date: November 15, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1401262 | |||||
SCORE 96 Date: November 12, 2013 Contractor: Harold D Johnson Client: Anthony A Lapham | Permit status: Completed | Permit id: P1401125 | |||||
SCORE 96 Date: February 7, 2013 Contractor: Harold D Johnson Client: Ronald G Russell | Permit status: Completed | Permit id: P1302724 | |||||
SCORE 96 Date: March 11, 2013 Contractor: Harold D Johnson Client: Brian Breheny | Permit status: Completed | Permit id: P1303376 | |||||
SCORE 96 Date: July 8, 2013 Contractor: Harold D Johnson Client: John Goodman | Permit status: Completed | Permit id: P1306185 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Client: Mark Stumpf | Permit status: Completed | Permit id: P1400789 | |||||
SCORE 96 Date: September 25, 2013 Contractor: Harold D Johnson Client: Bruce G Joseph | Permit status: Permit issued | Permit id: P1308157 | |||||
SCORE 96 Date: October 18, 2013 Contractor: Harold D Johnson Client: Steven Damato | Permit status: Permit issued | Permit id: P1400505 | |||||
SCORE 96 Date: July 19, 2013 Contractor: Harold D Johnson Client: Amy Baier | Permit status: Permit issued | Permit id: P1306513 | |||||
SCORE 96 Date: July 19, 2013 Contractor: Harold D Johnson Client: Hanane Lemlih | Permit status: Permit issued | Permit id: P1306514 | |||||
SCORE 96 Date: August 20, 2013 Contractor: Harold D Johnson Client: Dumbarton Court Owners Inc | Permit status: Permit issued | Permit id: P1307317 | |||||
SCORE 96 Date: August 9, 2013 Contractor: Harold D Johnson Client: David E Shiffrin | Permit status: Permit issued | Permit id: P1307083 | |||||
SCORE 96 Date: October 27, 2014 Contractor: Harold D Johnson Client: Kenyatta K Jenkins | Permit status: Completed | Permit id: P1500719 | |||||
SCORE 96 Date: August 11, 2014 Contractor: Harold D Johnson Client: Jeremiah M Wolsk | Permit status: Completed | Permit id: P1407730 | |||||
SCORE 96 Date: October 1, 2014 Contractor: Harold D Johnson Client: Steven R Steury | Permit status: Completed | Permit id: P1500029 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Government Of The Republic Of France | Permit status: Completed | Permit id: P1407801 | |||||
SCORE 96 Date: August 28, 2014 Contractor: Harold D Johnson Client: Chesterfld Cooperative Inc | Permit status: Completed | Permit id: P1408203 | |||||
SCORE 96 Date: September 5, 2014 Contractor: Harold D Johnson Client: Rosemary C Harold | Permit status: Completed | Permit id: P1408369 | |||||
SCORE 96 Date: September 22, 2014 Contractor: Harold D Johnson Client: Christopher Rhee | Permit status: Completed | Permit id: P1408750 | |||||
SCORE 96 Date: March 28, 2014 Contractor: Harold D Johnson Client: Kaloust Yedlbalian | Permit status: Completed | Permit id: M1401495 | |||||
SCORE 96 Date: April 3, 2014 Contractor: Harold D Johnson Client: Clare Elizabeth Hastings Trust | Permit status: Completed | Permit id: M1401553 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: Ivel Real Estate Inc | Permit status: Completed | Permit id: M1401237 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: N Street Restorations 11 Llc | Permit status: Completed | Permit id: M1401238 | |||||
SCORE 96 Date: January 7, 2014 Contractor: Harold D Johnson Client: Lowell Llc | Permit status: Permit issued | Permit id: M1400851 | |||||
SCORE 96 Date: April 17, 2014 Contractor: Harold D Johnson Client: Raj Properties Llc | Permit status: Completed | Permit id: M1401665 | |||||
SCORE 96 Date: March 12, 2014 Contractor: Harold D Johnson Client: Matthew Jemal | Permit status: Completed | Permit id: M1401349 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Seth D Martin | Permit status: Completed | Permit id: M1401976 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Jarid Smith | Permit status: Completed | Permit id: M1401977 | |||||
SCORE 96 Date: February 19, 2014 Contractor: Harold D Johnson Client: Horace W Howells | Permit status: Completed | Permit id: P1403377 | |||||
SCORE 96 Date: February 21, 2014 Contractor: Harold D Johnson Client: Ivel Real Estate Inc | Permit status: Completed | Permit id: P1403466 | |||||
SCORE 96 Date: April 18, 2014 Contractor: Harold D Johnson Client: Melanie L Aitken | Permit status: Completed | Permit id: P1404908 | |||||
SCORE 96 Date: July 18, 2014 Contractor: Harold D Johnson Client: Christopher Wallace | Permit status: Completed | Permit id: P1407113 | |||||
SCORE 96 Date: January 8, 2014 Contractor: Harold D Johnson Client: Mark C Amorosi | Permit status: Permit issued | Permit id: M1400870 | |||||
SCORE 96 Date: November 25, 2014 Contractor: Harold D Johnson Client: Republic Of Albania | Permit status: Completed | Permit id: P1501533 | |||||
SCORE 96 Date: December 5, 2014 Contractor: Harold D Johnson Client: Watergate South Inc | Permit status: Completed | Permit id: P1501751 | |||||
SCORE 96 Date: September 29, 2014 Contractor: Harold D Johnson Client: John E Duffy | Permit status: Permit issued | Permit id: P1408959 | |||||
SCORE 96 Date: October 31, 2014 Contractor: Harold D Johnson Client: Glorgio Furloso | Permit status: Permit issued | Permit id: P1500878 | |||||
SCORE 96 Date: April 18, 2014 Contractor: Harold D Johnson Client: Horace W Howells | Permit status: Permit issued | Permit id: P1404907 | |||||
SCORE 96 Date: July 29, 2014 Contractor: Harold D Johnson Client: Ghassem M Tehranfar | Permit status: Permit issued | Permit id: P1407399 | |||||
SCORE 96 Date: September 3, 2014 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1408301 | |||||
SCORE 96 Date: May 13, 2014 Contractor: Harold D Johnson Client: Jeffrey J Kimbell | Permit status: Permit issued | Permit id: P1405489 | |||||
SCORE 96 Date: November 7, 2014 Contractor: Harold D Johnson Client: Vermont And T Llc | Permit status: Completed | Permit id: P1501059 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Evonne C Connolly | Permit status: Permit issued | Permit id: P1407800 | |||||
SCORE 96 Date: June 16, 2014 Contractor: Harold D Johnson Client: Melanie L Aitken | Permit status: Permit issued | Permit id: P1406277 | |||||
SCORE 96 Date: October 16, 2014 Contractor: Harold D Johnson Client: Hhr Ghdc Limited Partnership | Permit status: Permit issued | Permit id: P1500424 | |||||
SCORE 96 Date: March 26, 2014 Contractor: Harold D Johnson Client: Angela Yergin | Permit status: Permit issued | Permit id: P1404297 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Berkeley M Shervin | Permit status: Permit issued | Permit id: P1407515 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Dilek Barlas-Hayri Trustee | Permit status: Permit issued | Permit id: P1407516 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Elizabeth S Chapel | Permit status: Permit issued | Permit id: P1407517 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: President And Directors Of Gonzaga College | Permit status: Completed | Permit id: P1407520 | |||||
SCORE 96 Date: January 27, 2014 Contractor: Harold D Johnson Client: Clayland B Gray | Permit status: Permit issued | Permit id: P1402825 | |||||
SCORE 96 Date: January 9, 2015 Contractor: Harold D Johnson Client: Pinebrook District Property Llc | Permit status: Completed | Permit id: P1502551 | |||||
SCORE 96 Date: March 19, 2015 Contractor: Harold D Johnson Client: Jason P Schaengold | Permit status: Completed | Permit id: P1504341 | |||||
SCORE 96 Date: August 13, 2015 Contractor: Harold D Johnson Client: President And Directors Of Gonzaga College | Permit status: Permit issued | Permit id: Fb1500143 | |||||
SCORE 96 Date: June 10, 2015 Contractor: Harold D Johnson Client: Peter F Murphy | Permit status: Permit issued | Permit id: P1506491 | |||||
SCORE 96 Date: July 20, 2015 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1507611 | |||||
SCORE 96 Date: April 20, 2015 Contractor: Harold D Johnson Client: Watergate South Inc | Permit status: Permit issued | Permit id: P1505166 | |||||
SCORE 96 Date: January 21, 2015 Contractor: Harold D Johnson Client: University Club Dc Inc | Permit status: Permit issued | Permit id: P1502838 | |||||
SCORE 96 Date: March 11, 2015 Contractor: Harold D Johnson Client: K-26 Lp | Permit status: Completed | Permit id: P1504123 | |||||
SCORE 96 Date: March 11, 2015 Contractor: Harold D Johnson Client: Oregon Properties Llc | Permit status: Permit issued | Permit id: P1504122 | |||||
SCORE 96 Date: January 28, 2015 Contractor: Harold D Johnson Client: Karim Zia Trustee | Permit status: Completed | Permit id: P1503019 | |||||
SCORE 96 Date: January 30, 2015 Contractor: Harold D Johnson Client: Evonne C Connolly | Permit status: Completed | Permit id: P1503110 | |||||
SCORE 96 Date: September 22, 2015 Contractor: Harold D Johnson Client: Kevin L Page | Permit status: Completed | Permit id: P1509258 | |||||
SCORE 96 Date: October 21, 2015 Contractor: Harold D Johnson Client: Iris Partners Llc | Permit status: Permit issued | Permit id: P1600594 | |||||
SCORE 96 Date: December 24, 2015 Contractor: Harold D Johnson Client: Brian E Macauley | Permit status: Permit issued | Permit id: P1602421 | |||||
SCORE 96 Date: November 16, 2015 Contractor: Harold D Johnson Client: Jessica Crane | Permit status: Permit issued | Permit id: M1600448 | |||||
SCORE 96 Date: December 18, 2015 Contractor: Harold D Johnson Client: R P Schifter | Permit status: Permit issued | Permit id: P1602273 | |||||
SCORE 96 Date: December 18, 2015 Contractor: Harold D Johnson Client: Geryl T Pearl | Permit status: Permit issued | Permit id: P1602275 | |||||
SCORE 96 Date: November 30, 2015 Contractor: Harold D Johnson Client: Nadira B Deery | Permit status: Permit issued | Permit id: P1601681 | |||||
SCORE 96 Date: October 28, 2015 Contractor: Harold D Johnson Client: Gerard Boquel | Permit status: Permit issued | Permit id: P1600849 | |||||
SCORE 96 Date: July 13, 2016 Contractor: Harold D Johnson Client: Nancy J Herman | Permit status: Permit issued | Permit id: P1607768 | |||||
SCORE 96 Date: February 8, 2016 Contractor: Harold D Johnson Client: Richard A Molinaroli | Permit status: Permit issued | Permit id: P1603498 | |||||
SCORE 96 Date: July 26, 2016 Contractor: Harold D Johnson Client: David B Brooks | Permit status: Permit issued | Permit id: P1608199 | |||||
SCORE 96 Date: July 27, 2016 Contractor: Harold D Johnson Client: Iris Partners Llc | Permit status: Permit issued | Permit id: P1608237 | |||||
SCORE 96 Date: April 19, 2016 Contractor: Harold D Johnson Client: Cyrus B Mehri | Permit status: Permit issued | Permit id: P1605544 | |||||
SCORE 96 Date: February 23, 2016 Contractor: Harold D Johnson Client: Craig E Chason | Permit status: Permit issued | Permit id: P1603908 | |||||
SCORE 96 Date: May 2, 2016 Contractor: Harold D Johnson Client: Josephine Wang | Permit status: Permit issued | Permit id: P1605904 | |||||
SCORE 96 Date: April 27, 2016 Contractor: Harold D Johnson Client: Mark L Kovner | Permit status: Permit issued | Permit id: P1605786 | |||||
SCORE 96 Date: July 27, 2016 Contractor: Harold D Johnson Client: David J Casella | Permit status: Permit issued | Permit id: P1608235 | |||||
SCORE 96 Date: April 14, 2016 Contractor: Harold D Johnson Client: Ned Powell | Permit status: Permit issued | Permit id: P1605432 | |||||
SCORE 96 Date: June 28, 2016 Contractor: Harold D Johnson Client: Jeffrey S Kaufman | Permit status: Permit issued | Permit id: P1607351 | |||||
SCORE 96 Date: July 7, 2016 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1607610 | |||||
SCORE 96 Date: June 28, 2016 Contractor: Harold D Johnson Client: Michele M Dombo Construction Management Llc | Permit status: Permit issued | Permit id: P1607352 | |||||
SCORE 96 Date: July 27, 2016 Contractor: Harold D Johnson Client: Christopher R Cooper | Permit status: Permit issued | Permit id: P1608236 | |||||
SCORE 96 Date: June 28, 2016 Contractor: Harold D Johnson Client: Pamela Hyde Smith Trustee | Permit status: Permit issued | Permit id: P1607343 | |||||
SCORE 96 Date: March 15, 2016 Contractor: Harold D Johnson Client: Allan L Platt | Permit status: Permit issued | Permit id: P1604556 | |||||
SCORE 96 Date: February 23, 2016 Contractor: Harold D Johnson Client: Chevy Chase Arcade Llc | Permit status: Completed | Permit id: P1603914 | |||||
SCORE 96 Date: June 8, 2016 Contractor: Harold D Johnson Client: John T Daggett | Permit status: Permit issued | Permit id: P1606842 | |||||
SCORE 96 Date: April 8, 2016 Contractor: Harold D Johnson Client: Allen E Nelson | Permit status: Permit issued | Permit id: P1605273 | |||||
SCORE 96 Date: April 18, 2016 Contractor: Harold D Johnson Client: Fernando Lemons | Permit status: Permit issued | Permit id: P1605501 | |||||
SCORE 96 Date: June 19, 2012 Contractor: Harold D Johnson Client: A. Sachdev | Permit status: Permit issued | Permit id: P1205967 | |||||
SCORE 96 Date: March 19, 2012 Contractor: Harold D Johnson Client: Sam Reid | Permit status: Completed | Permit id: P1203889 | |||||
SCORE 96 Date: August 16, 2012 Contractor: Harold D Johnson Client: Georgina Canales-Gex | Permit status: Completed | Permit id: P1207361 | |||||
SCORE 96 Date: March 28, 2012 Contractor: Harold D Johnson Client: Mccabe | Permit status: Permit issued | Permit id: M1201404 | |||||
SCORE 96 Date: July 11, 2012 Contractor: Harold D Johnson Client: Marion P Gesell Trustee | Permit status: Completed | Permit id: M1202320 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Adam B Isacson | Permit status: Completed | Permit id: M1200909 | |||||
SCORE 96 Date: September 11, 2012 Contractor: Harold D Johnson Client: Meyer Kestnbaum | Permit status: Permit issued | Permit id: M1202934 | |||||
SCORE 96 Date: October 11, 2012 Contractor: Harold D Johnson Client: Thomas G Brokaw | Permit status: Permit issued | Permit id: M1300090 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: Welsh Strawbridge | Permit status: Permit issued | Permit id: M1300269 | |||||
SCORE 96 Date: June 18, 2012 Contractor: Harold D Johnson Client: Laura A Macedo | Permit status: Permit issued | Permit id: M1202086 | |||||
SCORE 96 Date: August 20, 2012 Contractor: Harold D Johnson Client: J C Garrison | Permit status: Permit issued | Permit id: P1207435 | |||||
SCORE 96 Date: August 28, 2012 Contractor: Harold D Johnson Client: Lara Logan | Permit status: Completed | Permit id: P1207613 | |||||
SCORE 96 Date: August 7, 2012 Contractor: Harold D Johnson Client: Edna M Batzell | Permit status: Completed | Permit id: P1207105 | |||||
SCORE 96 Date: May 22, 2012 Contractor: Harold D Johnson Client: Mehdi Fateh | Permit status: Permit issued | Permit id: P1205309 | |||||
SCORE 96 Date: June 11, 2012 Contractor: Harold D Johnson Client: Charles T Clark | Permit status: Permit issued | Permit id: P1205767 | |||||
SCORE 96 Date: March 14, 2012 Contractor: Harold D Johnson Client: Nelson W Cunningham | Permit status: Permit issued | Permit id: P1203776 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: William S Burke | Permit status: Permit issued | Permit id: P1202640 | |||||
SCORE 96 Date: January 20, 2012 Contractor: Harold D Johnson Client: John J Hanlon | Permit status: Completed | Permit id: M1200873 | |||||
SCORE 96 Date: November 21, 2012 Contractor: Harold D Johnson Permit status: Completed | Permit id: M1300396 | |||||
SCORE 96 Date: June 7, 2012 Contractor: Harold D Johnson Client: Nancy B Mcgovern | Permit status: Completed | Permit id: P1205682 | |||||
SCORE 96 Date: February 28, 2012 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1203479 | |||||
SCORE 96 Date: January 4, 2012 Contractor: Harold D Johnson Client: Emanuel Voyatzis | Permit status: Completed | Permit id: P1202192 | |||||
SCORE 96 Date: November 22, 2013 Contractor: Harold D Johnson Client: Peter Bernard Robinson Trustee | Permit status: Permit issued | Permit id: M1400531 | |||||
SCORE 96 Date: April 8, 2013 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: M1301322 | |||||
SCORE 96 Date: February 11, 2013 Contractor: Harold D Johnson Client: Kevin W Carr | Permit status: Completed | Permit id: M1300919 | |||||
SCORE 96 Date: September 25, 2013 Contractor: Harold D Johnson Client: Ximena V Del Carpio | Permit status: Permit issued | Permit id: M1303023 | |||||
SCORE 96 Date: May 22, 2013 Contractor: Harold D Johnson Client: Richard J Mann | Permit status: Permit issued | Permit id: M1301781 | |||||
SCORE 96 Date: November 19, 2013 Contractor: Harold D Johnson Client: Jorge Guajardo | Permit status: Permit issued | Permit id: M1400492 | |||||
SCORE 96 Date: May 3, 2013 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: M1301613 | |||||
SCORE 96 Date: March 19, 2013 Contractor: Harold D Johnson Client: Shelley H Guiley | Permit status: Permit issued | Permit id: M1301161 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Client: K Karr | Permit status: Completed | Permit id: M1400315 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: M1400314 | |||||
SCORE 96 Date: November 19, 2013 Contractor: Harold D Johnson Client: Michael Diamant | Permit status: Completed | Permit id: M1400493 | |||||
SCORE 96 Date: October 16, 2013 Contractor: Harold D Johnson Client: James I Valentine | Permit status: Completed | Permit id: M1400127 | |||||
SCORE 96 Date: October 1, 2013 Contractor: Harold D Johnson Client: Richard F Griffin | Permit status: Completed | Permit id: M1400013 | |||||
SCORE 96 Date: November 22, 2013 Contractor: Harold D Johnson Client: Hanlon Design Build Inc | Permit status: Completed | Permit id: M1400532 | |||||
SCORE 96 Date: September 5, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: M1302834 | |||||
SCORE 96 Date: September 5, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: M1302835 | |||||
SCORE 96 Date: October 24, 2013 Contractor: Harold D Johnson Client: Louise B Sindler | Permit status: Completed | Permit id: M1400260 | |||||
SCORE 96 Date: October 18, 2013 Contractor: Harold D Johnson Client: Steven Damato | Permit status: Permit issued | Permit id: P1400505 | |||||
SCORE 96 Date: April 19, 2013 Contractor: Harold D Johnson Client: Jeffrey D Blum | Permit status: Permit issued | Permit id: P1304387 | |||||
SCORE 96 Date: September 25, 2013 Contractor: Harold D Johnson Client: Bruce G Joseph | Permit status: Permit issued | Permit id: P1308157 | |||||
SCORE 96 Date: February 19, 2013 Contractor: Harold D Johnson Client: Sara M Hazelwood | Permit status: Permit issued | Permit id: P1302972 | |||||
SCORE 96 Date: May 1, 2013 Contractor: Harold D Johnson Client: Paul Shin | Permit status: Permit issued | Permit id: P1304673 | |||||
SCORE 96 Date: July 19, 2013 Contractor: Harold D Johnson Client: Hanane Lemlih | Permit status: Permit issued | Permit id: P1306514 | |||||
SCORE 96 Date: August 20, 2013 Contractor: Harold D Johnson Client: Dumbarton Court Owners Inc | Permit status: Permit issued | Permit id: P1307317 | |||||
SCORE 96 Date: September 4, 2013 Contractor: Harold D Johnson Client: Toni C Bickart | Permit status: Permit canceled | Permit id: P1307644 | |||||
SCORE 96 Date: July 19, 2013 Contractor: Harold D Johnson Client: Amy Baier | Permit status: Permit issued | Permit id: P1306513 | |||||
SCORE 96 Date: August 9, 2013 Contractor: Harold D Johnson Client: David E Shiffrin | Permit status: Permit issued | Permit id: P1307083 | |||||
SCORE 96 Date: November 12, 2013 Contractor: Harold D Johnson Client: Anthony A Lapham | Permit status: Completed | Permit id: P1401125 | |||||
SCORE 96 Date: February 7, 2013 Contractor: Harold D Johnson Client: Ronald G Russell | Permit status: Completed | Permit id: P1302724 | |||||
SCORE 96 Date: January 28, 2013 Contractor: Harold D Johnson Client: L C Carter | Permit status: Completed | Permit id: P1302445 | |||||
SCORE 96 Date: March 11, 2013 Contractor: Harold D Johnson Client: Brian Breheny | Permit status: Completed | Permit id: P1303376 | |||||
SCORE 96 Date: March 20, 2013 Contractor: Harold D Johnson Client: Ck Capital Investments Llc | Permit status: Completed | Permit id: P1303645 | |||||
SCORE 96 Date: May 29, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1305296 | |||||
SCORE 96 Date: October 18, 2013 Contractor: Harold D Johnson Client: Barbara J Richardson | Permit status: Completed | Permit id: P1400506 | |||||
SCORE 96 Date: November 15, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1401262 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Client: Mark Stumpf | Permit status: Completed | Permit id: P1400789 | |||||
SCORE 96 Date: July 8, 2013 Contractor: Harold D Johnson Client: John Goodman | Permit status: Completed | Permit id: P1306185 | |||||
SCORE 96 Date: November 20, 2013 Contractor: Harold D Johnson Client: John W Low | Permit status: Completed | Permit id: P1401337 | |||||
SCORE 96 Date: January 28, 2013 Contractor: Harold D Johnson Client: Elissa M Alben | Permit status: Completed | Permit id: P1302446 | |||||
SCORE 96 Date: August 8, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: P1307060 | |||||
SCORE 96 Date: October 3, 2013 Contractor: Harold D Johnson Client: J C Garrison | Permit status: Completed | Permit id: P1400111 | |||||
SCORE 96 Date: March 15, 2013 Contractor: Harold D Johnson Client: Amy L Riella | Permit status: Completed | Permit id: P1303555 | |||||
SCORE 96 Date: July 17, 2013 Contractor: Harold D Johnson Client: Larry Kanarek | Permit status: Completed | Permit id: P1306451 | |||||
SCORE 96 Date: January 7, 2014 Contractor: Harold D Johnson Client: Lowell Llc | Permit status: Permit issued | Permit id: M1400851 | |||||
SCORE 96 Date: January 8, 2014 Contractor: Harold D Johnson Client: Mark C Amorosi | Permit status: Permit issued | Permit id: M1400870 | |||||
SCORE 96 Date: March 12, 2014 Contractor: Harold D Johnson Client: Matthew Jemal | Permit status: Completed | Permit id: M1401349 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: Ivel Real Estate Inc | Permit status: Completed | Permit id: M1401237 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Jarid Smith | Permit status: Completed | Permit id: M1401977 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Seth D Martin | Permit status: Completed | Permit id: M1401976 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: N Street Restorations 11 Llc | Permit status: Completed | Permit id: M1401238 | |||||
SCORE 96 Date: April 3, 2014 Contractor: Harold D Johnson Client: Clare Elizabeth Hastings Trust | Permit status: Completed | Permit id: M1401553 | |||||
SCORE 96 Date: March 28, 2014 Contractor: Harold D Johnson Client: Kaloust Yedlbalian | Permit status: Completed | Permit id: M1401495 | |||||
SCORE 96 Date: April 17, 2014 Contractor: Harold D Johnson Client: Raj Properties Llc | Permit status: Completed | Permit id: M1401665 | |||||
SCORE 96 Date: April 18, 2014 Contractor: Harold D Johnson Client: Horace W Howells | Permit status: Permit issued | Permit id: P1404907 | |||||
SCORE 96 Date: January 27, 2014 Contractor: Harold D Johnson Client: Clayland B Gray | Permit status: Permit issued | Permit id: P1402825 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Chryssa Wolfe | Permit status: Permit issued | Permit id: P1202632 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Evonne C Connolly | Permit status: Permit issued | Permit id: P1407800 | |||||
SCORE 96 Date: March 16, 2012 Contractor: Harold D Johnson Client: Samuel S Reid | Permit status: Permit issued | Permit id: P1203866 | |||||
SCORE 96 Date: May 13, 2014 Contractor: Harold D Johnson Client: Jeffrey J Kimbell | Permit status: Permit issued | Permit id: P1405489 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Berkeley M Shervin | Permit status: Permit issued | Permit id: P1407515 | |||||
SCORE 96 Date: June 16, 2014 Contractor: Harold D Johnson Client: Melanie L Aitken | Permit status: Permit issued | Permit id: P1406277 | |||||
SCORE 96 Date: September 3, 2014 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1408301 | |||||
SCORE 96 Date: March 26, 2014 Contractor: Harold D Johnson Client: Angela Yergin | Permit status: Permit issued | Permit id: P1404297 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Dilek Barlas-Hayri Trustee | Permit status: Permit issued | Permit id: P1407516 | |||||
SCORE 96 Date: October 16, 2014 Contractor: Harold D Johnson Client: Hhr Ghdc Limited Partnership | Permit status: Permit issued | Permit id: P1500424 | |||||
SCORE 96 Date: October 31, 2014 Contractor: Harold D Johnson Client: Glorgio Furloso | Permit status: Permit issued | Permit id: P1500878 | |||||
SCORE 96 Date: July 29, 2014 Contractor: Harold D Johnson Client: Ghassem M Tehranfar | Permit status: Permit issued | Permit id: P1407399 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Elizabeth S Chapel | Permit status: Permit issued | Permit id: P1407517 | |||||
SCORE 96 Date: September 29, 2014 Contractor: Harold D Johnson Client: John E Duffy | Permit status: Permit issued | Permit id: P1408959 | |||||
SCORE 96 Date: November 25, 2014 Contractor: Harold D Johnson Client: Republic Of Albania | Permit status: Completed | Permit id: P1501533 | |||||
SCORE 96 Date: August 28, 2014 Contractor: Harold D Johnson Client: Chesterfld Cooperative Inc | Permit status: Completed | Permit id: P1408203 | |||||
SCORE 96 Date: October 27, 2014 Contractor: Harold D Johnson Client: Kenyatta K Jenkins | Permit status: Completed | Permit id: P1500719 | |||||
SCORE 96 Date: February 21, 2014 Contractor: Harold D Johnson Client: Ivel Real Estate Inc | Permit status: Completed | Permit id: P1403466 | |||||
SCORE 96 Date: September 22, 2014 Contractor: Harold D Johnson Client: Christopher Rhee | Permit status: Completed | Permit id: P1408750 | |||||
SCORE 96 Date: October 1, 2014 Contractor: Harold D Johnson Client: Steven R Steury | Permit status: Completed | Permit id: P1500029 | |||||
SCORE 96 Date: July 18, 2014 Contractor: Harold D Johnson Client: Christopher Wallace | Permit status: Completed | Permit id: P1407113 | |||||
SCORE 96 Date: September 5, 2014 Contractor: Harold D Johnson Client: Rosemary C Harold | Permit status: Completed | Permit id: P1408369 | |||||
SCORE 96 Date: February 19, 2014 Contractor: Harold D Johnson Client: Horace W Howells | Permit status: Completed | Permit id: P1403377 | |||||
SCORE 96 Date: August 11, 2014 Contractor: Harold D Johnson Client: Jeremiah M Wolsk | Permit status: Completed | Permit id: P1407730 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Government Of The Republic Of France | Permit status: Completed | Permit id: P1407801 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: President And Directors Of Gonzaga College | Permit status: Completed | Permit id: P1407520 | |||||
SCORE 96 Date: December 5, 2014 Contractor: Harold D Johnson Client: Watergate South Inc | Permit status: Completed | Permit id: P1501751 | |||||
SCORE 96 Date: November 7, 2014 Contractor: Harold D Johnson Client: Vermont And T Llc | Permit status: Completed | Permit id: P1501059 | |||||
SCORE 96 Date: February 3, 2012 Contractor: Harold D Johnson Client: Michael Frame | Permit status: Completed | Permit id: M1200966 | |||||
SCORE 96 Date: July 12, 2012 Contractor: Harold D Johnson Client: E Smith Yewell | Permit status: Permit issued | Permit id: P1206459 | |||||
SCORE 96 Date: May 7, 2012 Contractor: Harold D Johnson Client: Roger S Hillas Jr | Permit status: Permit issued | Permit id: M1201728 | |||||
SCORE 96 Date: July 25, 2012 Contractor: Harold D Johnson Client: E Graves | Permit status: Completed | Permit id: M1202457 | |||||
SCORE 96 Date: January 20, 2012 Contractor: Harold D Johnson Client: Mauricette O Hallet | Permit status: Completed | Permit id: M1200874 | |||||
SCORE 96 Date: September 21, 2012 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: M1203063 | |||||
SCORE 96 Date: August 7, 2012 Contractor: Harold D Johnson Client: Philip G Dufour | Permit status: Permit issued | Permit id: P1207102 | |||||
SCORE 96 Date: August 28, 2012 Contractor: Harold D Johnson Client: Nicholas J Patterson | Permit status: Completed | Permit id: P1207614 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: The Hat House Llc | Permit status: Permit issued | Permit id: P1300799 | |||||
SCORE 96 Date: May 18, 2012 Contractor: Harold D Johnson Client: Tracy Davis | Permit status: Permit issued | Permit id: P1205270 | |||||
SCORE 96 Date: January 30, 2012 Contractor: Harold D Johnson Client: Katherine Gensler | Permit status: Permit issued | Permit id: P1202727 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: Deborah J Lewis | Permit status: Permit issued | Permit id: M1300268 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Michael D Abrams | Permit status: Permit issued | Permit id: P1202639 | |||||
SCORE 96 Date: February 28, 2012 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1203480 | |||||
SCORE 96 Date: January 17, 2012 Contractor: Harold D Johnson Client: Hsbc Mortgage Corporation Usa | Permit status: Permit issued | Permit id: P1202434 | |||||
SCORE 96 Date: October 15, 2012 Contractor: Harold D Johnson Client: Sharon Wesley | Permit status: Completed | Permit id: M1300100 | |||||
SCORE 96 Date: March 26, 2012 Contractor: Harold D Johnson Client: Pamela S Reznick | Permit status: Completed | Permit id: M1201385 | |||||
SCORE 96 Date: November 14, 2012 Contractor: Harold D Johnson Client: Bradley E Singer | Permit status: Completed | Permit id: P1301016 | |||||
SCORE 96 Date: March 28, 2012 Contractor: Harold D Johnson Client: Richard C Fritsch | Permit status: Permit issued | Permit id: P1204111 | |||||
SCORE 96 Date: October 1, 2012 Contractor: Harold D Johnson Client: Keith W Stiles | Permit status: Permit issued | Permit id: P1300024 | |||||
SCORE 96 Date: October 31, 2012 Contractor: Harold D Johnson Client: Three Headed Llc | Permit status: Completed | Permit id: P1300661 | |||||
SCORE 96 Date: July 26, 2016 Contractor: Harold D Johnson Client: David B Brooks | Permit status: Permit issued | Permit id: P1608199 | |||||
SCORE 96 Date: February 8, 2016 Contractor: Harold D Johnson Client: Richard A Molinaroli | Permit status: Permit issued | Permit id: P1603498 | |||||
SCORE 96 Date: April 21, 2016 Contractor: Harold D Johnson Client: Richard A Molinaroli | Permit status: Permit issued | Permit id: P1605635 | |||||
SCORE 96 Date: July 13, 2016 Contractor: Harold D Johnson Client: Nancy J Herman | Permit status: Permit issued | Permit id: P1607768 | |||||
SCORE 96 Date: September 19, 2016 Contractor: Harold D Johnson Client: Iris Partners Llc | Permit status: Permit issued | Permit id: P1609548 | |||||
SCORE 96 Date: April 27, 2016 Contractor: Harold D Johnson Client: Mark L Kovner | Permit status: Permit issued | Permit id: P1605786 | |||||
SCORE 96 Date: September 30, 2016 Contractor: Harold D Johnson Client: Mark L Kovner | Permit status: Permit issued | Permit id: P1609898 | |||||
SCORE 96 Date: February 23, 2016 Contractor: Harold D Johnson Client: Craig E Chason | Permit status: Permit issued | Permit id: P1603908 | |||||
SCORE 96 Date: May 2, 2016 Contractor: Harold D Johnson Client: Josephine Wang | Permit status: Permit issued | Permit id: P1605904 | |||||
SCORE 96 Date: April 19, 2016 Contractor: Harold D Johnson Client: Cyrus B Mehri | Permit status: Permit issued | Permit id: P1605544 | |||||
SCORE 96 Date: April 14, 2016 Contractor: Harold D Johnson Client: Ned Powell | Permit status: Permit issued | Permit id: P1605432 | |||||
SCORE 96 Date: August 8, 2016 Contractor: Harold D Johnson Client: J Bates | Permit status: Permit issued | Permit id: P1608498 | |||||
SCORE 96 Date: July 7, 2016 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1607610 | |||||
SCORE 96 Date: June 28, 2016 Contractor: Harold D Johnson Client: Jeffrey S Kaufman | Permit status: Permit issued | Permit id: P1607351 | |||||
SCORE 96 Date: July 13, 2016 Contractor: Harold D Johnson Client: Sarah C Mccreary | Permit status: Permit issued | Permit id: P1607767 | |||||
SCORE 96 Date: July 27, 2016 Contractor: Harold D Johnson Client: David J Casella | Permit status: Permit issued | Permit id: P1608235 | |||||
SCORE 96 Date: July 27, 2016 Contractor: Harold D Johnson Client: Christopher R Cooper | Permit status: Permit issued | Permit id: P1608236 | |||||
SCORE 96 Date: September 22, 2016 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1609647 | |||||
SCORE 96 Date: September 30, 2016 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1609899 | |||||
SCORE 96 Date: June 28, 2016 Contractor: Harold D Johnson Client: Pamela Hyde Smith Trustee | Permit status: Permit issued | Permit id: P1607343 | |||||
SCORE 96 Date: March 15, 2016 Contractor: Harold D Johnson Client: Allan L Platt | Permit status: Permit issued | Permit id: P1604556 | |||||
SCORE 96 Date: September 28, 2016 Contractor: Harold D Johnson Client: Andrea Miano | Permit status: Permit issued | Permit id: P1609794 | |||||
SCORE 96 Date: April 8, 2016 Contractor: Harold D Johnson Client: Allen E Nelson | Permit status: Permit issued | Permit id: P1605273 | |||||
SCORE 96 Date: June 8, 2016 Contractor: Harold D Johnson Client: John T Daggett | Permit status: Permit issued | Permit id: P1606842 | |||||
SCORE 96 Date: April 18, 2016 Contractor: Harold D Johnson Client: Fernando Lemons | Permit status: Permit issued | Permit id: P1605501 | |||||
SCORE 96 Date: February 23, 2016 Contractor: Harold D Johnson Client: Chevy Chase Arcade Llc | Permit status: Completed | Permit id: P1603914 | |||||
SCORE 96 Date: June 28, 2016 Contractor: Harold D Johnson Client: Michele M Dombo Construction Management Llc | Permit status: Completed | Permit id: P1607352 | |||||
SCORE 96 Date: September 12, 2012 Contractor: Harold D Johnson Client: Monica Bussolati | Permit status: Completed | Permit id: P1207982 | |||||
SCORE 96 Date: September 30, 2016 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1609899 | |||||
SCORE 96 Date: September 22, 2016 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1609647 | |||||
SCORE 96 Date: September 28, 2016 Contractor: Harold D Johnson Client: Andrea Miano | Permit status: Permit issued | Permit id: P1609794 | |||||
SCORE 96 Date: September 5, 2014 Contractor: Harold D Johnson Client: Rosemary C Harold | Permit status: Completed | Permit id: P1408369 | |||||
SCORE 96 Date: July 18, 2014 Contractor: Harold D Johnson Client: Christopher Wallace | Permit status: Completed | Permit id: P1407113 | |||||
SCORE 96 Date: March 12, 2014 Contractor: Harold D Johnson Client: Matthew Jemal | Permit status: Completed | Permit id: M1401349 | |||||
SCORE 96 Date: February 19, 2014 Contractor: Harold D Johnson Client: Horace W Howells | Permit status: Completed | Permit id: P1403377 | |||||
SCORE 96 Date: January 27, 2014 Contractor: Harold D Johnson Client: Clayland B Gray | Permit status: Permit issued | Permit id: P1402825 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Jarid Smith | Permit status: Completed | Permit id: M1401977 | |||||
SCORE 96 Date: November 25, 2014 Contractor: Harold D Johnson Client: Republic Of Albania | Permit status: Completed | Permit id: P1501533 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Seth D Martin | Permit status: Completed | Permit id: M1401976 | |||||
SCORE 96 Date: October 27, 2014 Contractor: Harold D Johnson Client: Kenyatta K Jenkins | Permit status: Completed | Permit id: P1500719 | |||||
SCORE 96 Date: September 22, 2014 Contractor: Harold D Johnson Client: Christopher Rhee | Permit status: Completed | Permit id: P1408750 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: Ivel Real Estate Inc | Permit status: Completed | Permit id: M1401237 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Evonne C Connolly | Permit status: Permit issued | Permit id: P1407800 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Berkeley M Shervin | Permit status: Permit issued | Permit id: P1407515 | |||||
SCORE 96 Date: May 13, 2014 Contractor: Harold D Johnson Client: Jeffrey J Kimbell | Permit status: Permit issued | Permit id: P1405489 | |||||
SCORE 96 Date: October 1, 2014 Contractor: Harold D Johnson Client: Steven R Steury | Permit status: Completed | Permit id: P1500029 | |||||
SCORE 96 Date: August 28, 2014 Contractor: Harold D Johnson Client: Chesterfld Cooperative Inc | Permit status: Completed | Permit id: P1408203 | |||||
SCORE 96 Date: April 18, 2014 Contractor: Harold D Johnson Client: Melanie L Aitken | Permit status: Completed | Permit id: P1404908 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: N Street Restorations 11 Llc | Permit status: Completed | Permit id: M1401238 | |||||
SCORE 96 Date: March 26, 2014 Contractor: Harold D Johnson Client: Angela Yergin | Permit status: Permit issued | Permit id: P1404297 | |||||
SCORE 96 Date: August 11, 2014 Contractor: Harold D Johnson Client: Jeremiah M Wolsk | Permit status: Completed | Permit id: P1407730 | |||||
SCORE 96 Date: October 16, 2014 Contractor: Harold D Johnson Client: Hhr Ghdc Limited Partnership | Permit status: Permit issued | Permit id: P1500424 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Elizabeth S Chapel | Permit status: Permit issued | Permit id: P1407517 | |||||
SCORE 96 Date: September 29, 2014 Contractor: Harold D Johnson Client: John E Duffy | Permit status: Permit issued | Permit id: P1408959 | |||||
SCORE 96 Date: September 3, 2014 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1408301 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Government Of The Republic Of France | Permit status: Completed | Permit id: P1407801 | |||||
SCORE 96 Date: April 3, 2014 Contractor: Harold D Johnson Client: Clare Elizabeth Hastings Trust | Permit status: Completed | Permit id: M1401553 | |||||
SCORE 96 Date: April 17, 2014 Contractor: Harold D Johnson Client: Raj Properties Llc | Permit status: Completed | Permit id: M1401665 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: President And Directors Of Gonzaga College | Permit status: Completed | Permit id: P1407520 | |||||
SCORE 96 Date: December 5, 2014 Contractor: Harold D Johnson Client: Watergate South Inc | Permit status: Completed | Permit id: P1501751 | |||||
SCORE 96 Date: October 31, 2014 Contractor: Harold D Johnson Client: Glorgio Furloso | Permit status: Permit issued | Permit id: P1500878 | |||||
SCORE 96 Date: January 8, 2014 Contractor: Harold D Johnson Client: Mark C Amorosi | Permit status: Permit issued | Permit id: M1400870 | |||||
SCORE 96 Date: March 28, 2014 Contractor: Harold D Johnson Client: Kaloust Yedlbalian | Permit status: Completed | Permit id: M1401495 | |||||
SCORE 96 Date: July 29, 2014 Contractor: Harold D Johnson Client: Ghassem M Tehranfar | Permit status: Permit issued | Permit id: P1407399 | |||||
SCORE 96 Date: November 7, 2014 Contractor: Harold D Johnson Client: Vermont And T Llc | Permit status: Completed | Permit id: P1501059 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Dilek Barlas-Hayri Trustee | Permit status: Permit issued | Permit id: P1407516 | |||||
SCORE 96 Date: November 2, 2016 Contractor: Harold D Johnson Client: Melissa H Twomey | Permit status: Permit issued | Permit id: P1700872 | |||||
SCORE 96 Date: December 21, 2016 Contractor: Harold D Johnson Client: Robert Wuertz | Permit status: Permit issued | Permit id: P1702310 | |||||
SCORE 96 Date: November 16, 2016 Contractor: Harold D Johnson Client: Javier Beltran | Permit status: Permit issued | Permit id: P1701308 | |||||
SCORE 96 Date: December 8, 2016 Contractor: Harold D Johnson Client: David J Berkebile | Permit status: Permit issued | Permit id: P1701880 | |||||
SCORE 96 Date: December 5, 2016 Contractor: Harold D Johnson Client: The 1901 Columbia Road Trust | Permit status: Permit issued | Permit id: P1701788 | |||||
SCORE 96 Date: January 5, 2017 Contractor: Harold D Johnson Client: Franklin S Bush | Permit status: Permit issued | Permit id: M1700869 | |||||
SCORE 96 Date: January 5, 2017 Contractor: Harold D Johnson Client: Grant Barnette | Permit status: Permit issued | Permit id: P1702613 | |||||
SCORE 96 Date: June 19, 2012 Contractor: Harold D Johnson Client: A. Sachdev | Permit status: Permit issued | Permit id: P1205967 | |||||
SCORE 96 Date: March 28, 2012 Contractor: Harold D Johnson Client: Richard C Fritsch | Permit status: Permit issued | Permit id: P1204111 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Chryssa Wolfe | Permit status: Permit issued | Permit id: P1202632 | |||||
SCORE 96 Date: May 18, 2012 Contractor: Harold D Johnson Client: Tracy Davis | Permit status: Permit issued | Permit id: P1205270 | |||||
SCORE 96 Date: February 28, 2012 Contractor: Harold D Johnson Client: William Beard Trustees & Betty Beard Trustees | Permit status: Permit issued | Permit id: P1203480 | |||||
SCORE 96 Date: July 12, 2012 Contractor: Harold D Johnson Client: E Smith Yewell | Permit status: Permit issued | Permit id: P1206459 | |||||
SCORE 96 Date: January 30, 2012 Contractor: Harold D Johnson Client: Katherine Gensler | Permit status: Permit issued | Permit id: P1202727 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: The Hat House Llc | Permit status: Permit issued | Permit id: P1300799 | |||||
SCORE 96 Date: August 7, 2012 Contractor: Harold D Johnson Client: Philip G Dufour | Permit status: Permit issued | Permit id: P1207102 | |||||
SCORE 96 Date: August 20, 2012 Contractor: Harold D Johnson Client: J C Garrison | Permit status: Permit issued | Permit id: P1207435 | |||||
SCORE 96 Date: March 16, 2012 Contractor: Harold D Johnson Client: Samuel S Reid | Permit status: Permit issued | Permit id: P1203866 | |||||
SCORE 96 Date: March 14, 2012 Contractor: Harold D Johnson Client: Nelson W Cunningham | Permit status: Permit issued | Permit id: P1203776 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: William S Burke | Permit status: Permit issued | Permit id: P1202640 | |||||
SCORE 96 Date: October 1, 2012 Contractor: Harold D Johnson Client: Keith W Stiles | Permit status: Permit issued | Permit id: P1300024 | |||||
SCORE 96 Date: June 11, 2012 Contractor: Harold D Johnson Client: Charles T Clark | Permit status: Permit issued | Permit id: P1205767 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Michael D Abrams | Permit status: Permit issued | Permit id: P1202639 | |||||
SCORE 96 Date: May 22, 2012 Contractor: Harold D Johnson Client: Mehdi Fateh | Permit status: Permit issued | Permit id: P1205309 | |||||
SCORE 96 Date: January 17, 2012 Contractor: Harold D Johnson Client: Hsbc Mortgage Corporation Usa | Permit status: Permit issued | Permit id: P1202434 | |||||
SCORE 96 Date: October 31, 2012 Contractor: Harold D Johnson Client: Three Headed Llc | Permit status: Completed | Permit id: P1300661 | |||||
SCORE 96 Date: September 12, 2012 Contractor: Harold D Johnson Client: Monica Bussolati | Permit status: Completed | Permit id: P1207982 | |||||
SCORE 96 Date: August 28, 2012 Contractor: Harold D Johnson Client: Nicholas J Patterson | Permit status: Completed | Permit id: P1207614 | |||||
SCORE 96 Date: November 14, 2012 Contractor: Harold D Johnson Client: Bradley E Singer | Permit status: Completed | Permit id: P1301016 | |||||
SCORE 96 Date: August 28, 2012 Contractor: Harold D Johnson Client: Lara Logan | Permit status: Completed | Permit id: P1207613 | |||||
SCORE 96 Date: August 7, 2012 Contractor: Harold D Johnson Client: Edna M Batzell | Permit status: Completed | Permit id: P1207105 | |||||
SCORE 96 Date: June 7, 2012 Contractor: Harold D Johnson Client: Nancy B Mcgovern | Permit status: Completed | Permit id: P1205682 | |||||
SCORE 96 Date: February 28, 2012 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1203479 | |||||
SCORE 96 Date: September 25, 2012 Contractor: Harold D Johnson Permit type: Plumbing and gas | Permit status: Completed | Permit id: P1208314 | |||||
SCORE 96 Date: March 19, 2012 Contractor: Harold D Johnson Client: Sam Reid | Permit status: Completed | Permit id: P1203889 | |||||
SCORE 96 Date: January 4, 2012 Contractor: Harold D Johnson Client: Emanuel Voyatzis | Permit status: Completed | Permit id: P1202192 | |||||
SCORE 96 Date: August 16, 2012 Contractor: Harold D Johnson Client: Georgina Canales-Gex | Permit status: Completed | Permit id: P1207361 | |||||
SCORE 96 Date: January 20, 2012 Contractor: Harold D Johnson Client: John J Hanlon | Permit status: Completed | Permit id: M1200873 | |||||
SCORE 96 Date: November 21, 2012 Contractor: Harold D Johnson Permit status: Completed | Permit id: M1300396 | |||||
SCORE 96 Date: January 20, 2012 Contractor: Harold D Johnson Client: Mauricette O Hallet | Permit status: Completed | Permit id: M1200874 | |||||
SCORE 96 Date: July 25, 2012 Contractor: Harold D Johnson Client: E Graves | Permit status: Completed | Permit id: M1202457 | |||||
SCORE 96 Date: July 11, 2012 Contractor: Harold D Johnson Client: Marion P Gesell Trustee | Permit status: Completed | Permit id: M1202320 | |||||
SCORE 96 Date: February 3, 2012 Contractor: Harold D Johnson Client: Michael Frame | Permit status: Completed | Permit id: M1200966 | |||||
SCORE 96 Date: January 25, 2012 Contractor: Harold D Johnson Client: Adam B Isacson | Permit status: Completed | Permit id: M1200909 | |||||
SCORE 96 Date: March 26, 2012 Contractor: Harold D Johnson Client: Pamela S Reznick | Permit status: Completed | Permit id: M1201385 | |||||
SCORE 96 Date: March 28, 2012 Contractor: Harold D Johnson Client: Mccabe | Permit status: Permit issued | Permit id: M1201404 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: Welsh Strawbridge | Permit status: Permit issued | Permit id: M1300269 | |||||
SCORE 96 Date: June 18, 2012 Contractor: Harold D Johnson Client: Laura A Macedo | Permit status: Permit issued | Permit id: M1202086 | |||||
SCORE 96 Date: November 5, 2012 Contractor: Harold D Johnson Client: Deborah J Lewis | Permit status: Permit issued | Permit id: M1300268 | |||||
SCORE 96 Date: October 15, 2012 Contractor: Harold D Johnson Client: Sharon Wesley | Permit status: Completed | Permit id: M1300100 | |||||
SCORE 96 Date: September 11, 2012 Contractor: Harold D Johnson Client: Meyer Kestnbaum | Permit status: Permit issued | Permit id: M1202934 | |||||
SCORE 96 Date: October 11, 2012 Contractor: Harold D Johnson Client: Thomas G Brokaw | Permit status: Permit issued | Permit id: M1300090 | |||||
SCORE 96 Date: May 7, 2012 Contractor: Harold D Johnson Client: Roger S Hillas Jr | Permit status: Permit issued | Permit id: M1201728 | |||||
SCORE 96 Date: September 21, 2012 Contractor: Harold D Johnson Client: R Lp & C L Harris | Permit status: Permit issued | Permit id: M1203063 | |||||
SCORE 96 Date: July 19, 2013 Contractor: Harold D Johnson Client: Hanane Lemlih | Permit status: Permit issued | Permit id: P1306514 | |||||
SCORE 96 Date: May 1, 2013 Contractor: Harold D Johnson Client: Paul Shin | Permit status: Permit issued | Permit id: P1304673 | |||||
SCORE 96 Date: August 20, 2013 Contractor: Harold D Johnson Client: Dumbarton Court Owners Inc | Permit status: Permit issued | Permit id: P1307317 | |||||
SCORE 96 Date: February 19, 2013 Contractor: Harold D Johnson Client: Sara M Hazelwood | Permit status: Permit issued | Permit id: P1302972 | |||||
SCORE 96 Date: August 9, 2013 Contractor: Harold D Johnson Client: David E Shiffrin | Permit status: Permit issued | Permit id: P1307083 | |||||
SCORE 96 Date: April 19, 2013 Contractor: Harold D Johnson Client: Jeffrey D Blum | Permit status: Permit issued | Permit id: P1304387 | |||||
SCORE 96 Date: September 25, 2013 Contractor: Harold D Johnson Client: Bruce G Joseph | Permit status: Permit issued | Permit id: P1308157 | |||||
SCORE 96 Date: October 18, 2013 Contractor: Harold D Johnson Client: Steven Damato | Permit status: Permit issued | Permit id: P1400505 | |||||
SCORE 96 Date: September 4, 2013 Contractor: Harold D Johnson Client: Toni C Bickart | Permit status: Permit canceled | Permit id: P1307644 | |||||
SCORE 96 Date: November 12, 2013 Contractor: Harold D Johnson Client: Anthony A Lapham | Permit status: Completed | Permit id: P1401125 | |||||
SCORE 96 Date: March 20, 2013 Contractor: Harold D Johnson Client: Ck Capital Investments Llc | Permit status: Completed | Permit id: P1303645 | |||||
SCORE 96 Date: March 11, 2013 Contractor: Harold D Johnson Client: Brian Breheny | Permit status: Completed | Permit id: P1303376 | |||||
SCORE 96 Date: January 28, 2013 Contractor: Harold D Johnson Client: L C Carter | Permit status: Completed | Permit id: P1302445 | |||||
SCORE 96 Date: October 3, 2013 Contractor: Harold D Johnson Client: J C Garrison | Permit status: Completed | Permit id: P1400111 | |||||
SCORE 96 Date: May 29, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: P1305296 | |||||
SCORE 96 Date: January 28, 2013 Contractor: Harold D Johnson Client: Elissa M Alben | Permit status: Completed | Permit id: P1302446 | |||||
SCORE 96 Date: August 8, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: P1307059 | |||||
SCORE 96 Date: August 8, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: P1307060 | |||||
SCORE 96 Date: February 7, 2013 Contractor: Harold D Johnson Client: Ronald G Russell | Permit status: Completed | Permit id: P1302724 | |||||
SCORE 96 Date: March 15, 2013 Contractor: Harold D Johnson Client: Amy L Riella | Permit status: Completed | Permit id: P1303555 | |||||
SCORE 96 Date: July 8, 2013 Contractor: Harold D Johnson Client: John Goodman | Permit status: Completed | Permit id: P1306185 | |||||
SCORE 96 Date: November 20, 2013 Contractor: Harold D Johnson Client: John W Low | Permit status: Completed | Permit id: P1401337 | |||||
SCORE 96 Date: October 18, 2013 Contractor: Harold D Johnson Client: Barbara J Richardson | Permit status: Completed | Permit id: P1400506 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Client: Mark Stumpf | Permit status: Completed | Permit id: P1400789 | |||||
SCORE 96 Date: November 15, 2013 Contractor: Harold D Johnson Client: William Beard Trustees & Betty Beard Trustees | Permit status: Completed | Permit id: P1401262 | |||||
SCORE 96 Date: November 22, 2013 Contractor: Harold D Johnson Client: Hanlon Design Build Inc | Permit status: Completed | Permit id: M1400532 | |||||
SCORE 96 Date: September 5, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: M1302835 | |||||
SCORE 96 Date: September 5, 2013 Contractor: Harold D Johnson Client: Gallaudet University | Permit status: Completed | Permit id: M1302834 | |||||
SCORE 96 Date: October 1, 2013 Contractor: Harold D Johnson Client: Richard F Griffin | Permit status: Completed | Permit id: M1400013 | |||||
SCORE 96 Date: October 16, 2013 Contractor: Harold D Johnson Client: James I Valentine | Permit status: Completed | Permit id: M1400127 | |||||
SCORE 96 Date: November 19, 2013 Contractor: Harold D Johnson Client: Michael Diamant | Permit status: Completed | Permit id: M1400493 | |||||
SCORE 96 Date: October 24, 2013 Contractor: Harold D Johnson Client: Louise B Sindler | Permit status: Completed | Permit id: M1400260 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Client: K Karr | Permit status: Completed | Permit id: M1400315 | |||||
SCORE 96 Date: February 11, 2013 Contractor: Harold D Johnson Client: Kevin W Carr | Permit status: Completed | Permit id: M1300919 | |||||
SCORE 96 Date: October 29, 2013 Contractor: Harold D Johnson Permit status: Completed | Permit id: M1400314 | |||||
SCORE 96 Date: September 25, 2013 Contractor: Harold D Johnson Client: Ximena V Del Carpio | Permit status: Permit issued | Permit id: M1303023 | |||||
SCORE 96 Date: May 22, 2013 Contractor: Harold D Johnson Client: Richard J Mann | Permit status: Permit issued | Permit id: M1301781 | |||||
SCORE 96 Date: May 3, 2013 Contractor: Harold D Johnson Client: Michael L & L M Marshall Michael & Lydiamashall | Permit status: Permit issued | Permit id: M1301613 | |||||
SCORE 96 Date: March 19, 2013 Contractor: Harold D Johnson Client: Shelley H Guiley | Permit status: Permit issued | Permit id: M1301161 | |||||
SCORE 96 Date: November 22, 2013 Contractor: Harold D Johnson Client: Peter Bernard Robinson Trustee | Permit status: Permit issued | Permit id: M1400531 | |||||
SCORE 96 Date: October 16, 2014 Contractor: Harold D Johnson Client: Hhr Ghdc Limited Partnership | Permit status: Permit issued | Permit id: P1500424 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Dilek Barlas-Hayri Trustee | Permit status: Permit issued | Permit id: P1407516 | |||||
SCORE 96 Date: July 29, 2014 Contractor: Harold D Johnson Client: Ghassem M Tehranfar | Permit status: Permit issued | Permit id: P1407399 | |||||
SCORE 96 Date: October 31, 2014 Contractor: Harold D Johnson Client: Glorgio Furloso | Permit status: Permit issued | Permit id: P1500878 | |||||
SCORE 96 Date: September 3, 2014 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1408301 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: Berkeley M Shervin | Permit status: Permit issued | Permit id: P1407515 | |||||
SCORE 96 Date: March 26, 2014 Contractor: Harold D Johnson Client: Angela Yergin | Permit status: Permit issued | Permit id: P1404297 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Evonne C Connolly | Permit status: Permit issued | Permit id: P1407800 | |||||
SCORE 96 Date: May 13, 2014 Contractor: Harold D Johnson Client: Jeffrey J Kimbell | Permit status: Permit issued | Permit id: P1405489 | |||||
SCORE 96 Date: June 16, 2014 Contractor: Harold D Johnson Client: Melanie L Aitken | Permit status: Permit issued | Permit id: P1406277 | |||||
SCORE 96 Date: January 27, 2014 Contractor: Harold D Johnson Client: Clayland B Gray | Permit status: Permit issued | Permit id: P1402825 | |||||
SCORE 96 Date: April 18, 2014 Contractor: Harold D Johnson Client: Horace W Howells | Permit status: Permit issued | Permit id: P1404907 | |||||
SCORE 96 Date: September 5, 2014 Contractor: Harold D Johnson Client: Rosemary C Harold | Permit status: Completed | Permit id: P1408369 | |||||
SCORE 96 Date: July 18, 2014 Contractor: Harold D Johnson Client: Christopher Wallace | Permit status: Completed | Permit id: P1407113 | |||||
SCORE 96 Date: November 25, 2014 Contractor: Harold D Johnson Client: Republic Of Albania | Permit status: Completed | Permit id: P1501533 | |||||
SCORE 96 Date: September 22, 2014 Contractor: Harold D Johnson Client: Christopher Rhee | Permit status: Completed | Permit id: P1408750 | |||||
SCORE 96 Date: February 19, 2014 Contractor: Harold D Johnson Client: Horace W Howells | Permit status: Completed | Permit id: P1403377 | |||||
SCORE 96 Date: October 27, 2014 Contractor: Harold D Johnson Client: Kenyatta K Jenkins | Permit status: Completed | Permit id: P1500719 | |||||
SCORE 96 Date: August 28, 2014 Contractor: Harold D Johnson Client: Chesterfld Cooperative Inc | Permit status: Completed | Permit id: P1408203 | |||||
SCORE 96 Date: February 21, 2014 Contractor: Harold D Johnson Client: Ivel Real Estate Inc | Permit status: Completed | Permit id: P1403466 | |||||
SCORE 96 Date: October 1, 2014 Contractor: Harold D Johnson Client: Steven R Steury | Permit status: Completed | Permit id: P1500029 | |||||
SCORE 96 Date: April 18, 2014 Contractor: Harold D Johnson Client: Melanie L Aitken | Permit status: Completed | Permit id: P1404908 | |||||
SCORE 96 Date: August 13, 2014 Contractor: Harold D Johnson Client: Government Of The Republic Of France | Permit status: Completed | Permit id: P1407801 | |||||
SCORE 96 Date: December 5, 2014 Contractor: Harold D Johnson Client: Watergate South Inc | Permit status: Completed | Permit id: P1501751 | |||||
SCORE 96 Date: August 1, 2014 Contractor: Harold D Johnson Client: President And Directors Of Gonzaga College | Permit status: Completed | Permit id: P1407520 | |||||
SCORE 96 Date: November 7, 2014 Contractor: Harold D Johnson Client: Vermont And T Llc | Permit status: Completed | Permit id: P1501059 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Jarid Smith | Permit status: Completed | Permit id: M1401977 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: N Street Restorations 11 Llc | Permit status: Completed | Permit id: M1401238 | |||||
SCORE 96 Date: March 12, 2014 Contractor: Harold D Johnson Client: Matthew Jemal | Permit status: Completed | Permit id: M1401349 | |||||
SCORE 96 Date: April 3, 2014 Contractor: Harold D Johnson Client: Clare Elizabeth Hastings Trust | Permit status: Completed | Permit id: M1401553 | |||||
SCORE 96 Date: May 20, 2014 Contractor: Harold D Johnson Client: Seth D Martin | Permit status: Completed | Permit id: M1401976 | |||||
SCORE 96 Date: February 26, 2014 Contractor: Harold D Johnson Client: Ivel Real Estate Inc | Permit status: Completed | Permit id: M1401237 | |||||
SCORE 96 Date: January 7, 2014 Contractor: Harold D Johnson Client: Lowell Llc | Permit status: Permit issued | Permit id: M1400851 | |||||
SCORE 96 Date: April 17, 2014 Contractor: Harold D Johnson Client: Raj Properties Llc | Permit status: Completed | Permit id: M1401665 | |||||
SCORE 96 Date: March 28, 2014 Contractor: Harold D Johnson Client: Kaloust Yedlbalian | Permit status: Completed | Permit id: M1401495 | |||||
SCORE 96 Date: January 8, 2014 Contractor: Harold D Johnson Client: Mark C Amorosi | Permit status: Permit issued | Permit id: M1400870 | |||||
SCORE 96 Date: January 21, 2015 Contractor: Harold D Johnson Client: University Club Dc Inc | Permit status: Permit issued | Permit id: P1502838 | |||||
SCORE 96 Date: October 19, 2015 Contractor: Harold D Johnson Client: Karim Zia Trustee | Permit status: Permit issued | Permit id: P1600523 | |||||
SCORE 96 Date: October 28, 2015 Contractor: Harold D Johnson Client: Gerard Boquel | Permit status: Permit issued | Permit id: P1600849 | |||||
SCORE 96 Date: April 20, 2015 Contractor: Harold D Johnson Client: Watergate South Inc | Permit status: Permit issued | Permit id: P1505166 | |||||
SCORE 96 Date: June 10, 2015 Contractor: Harold D Johnson Client: Peter F Murphy | Permit status: Permit issued | Permit id: P1506491 | |||||
SCORE 96 Date: November 30, 2015 Contractor: Harold D Johnson Client: Nadira B Deery | Permit status: Permit issued | Permit id: P1601681 | |||||
SCORE 96 Date: March 11, 2015 Contractor: Harold D Johnson Client: Oregon Properties Llc | Permit status: Permit issued | Permit id: P1504122 | |||||
SCORE 96 Date: July 20, 2015 Contractor: Harold D Johnson Permit status: Permit issued | Permit id: P1507611 | |||||
SCORE 96 Date: October 5, 2015 Contractor: Harold D Johnson Client: Brian E Macauley | Permit status: Permit issued | Permit id: P1600116 | |||||
SCORE 96 Date: December 24, 2015 Contractor: Harold D Johnson Client: Brian E Macauley | Permit status: Permit issued | Permit id: P1602421 | |||||
SCORE 96 Date: December 18, 2015 Contractor: Harold D Johnson Client: Geryl T Pearl | Permit status: Permit issued | Permit id: P1602275 | |||||
SCORE 96 Date: October 21, 2015 Contractor: Harold D Johnson Client: Iris Partners Llc | Permit status: Permit issued | Permit id: P1600594 |