Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Date: April 23, 2015 Contractor: Green Metro Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201504238026 | |||||
SCORE 84 158 Beverly St San Francisco Ca Install lighting without changing wall and fixture location. Dry rot replace the window casing exterior siding repair the dryrot around sliding door in lightwell not street review. Install lights switches receptacles 1 dishwasher 1 garbage disposal 1 microwave 1 range and 1 smoke detectors. Date: June 24, 2014 Contractor: Green Metro Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E20140624618 | |||||
SCORE 84 2245 Beach St San Francisco Ca Unit 6: hall bathroom: replace tub faucet tub tile reinstall pedestal and toilet replace vanity light no change to tub and walls. Master bathroom: replace pedestal at same locatoin. New vanity light no change to shower. Date: May 20, 2014 Contractor: Green Metro Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201405209785 | |||||
SCORE 84 Date: April 23, 2015 Contractor: Green Metro Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150423975 | |||||
SCORE 84 Date: July 30, 2014 Contractor: Green Metro Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20140730841 | |||||
SCORE 84 158 Beverly St San Francisco Ca Remodel kitchen (not wall change) install lights without changing fixture location. Dryrot replace the window casing exterior siding; repair the dryrot around sliding door in light well (not street review). Date: June 24, 2014 Contractor: Green Metro Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140624750 | |||||
SCORE 84 158 Beverly St San Francisco Ca Full remodel kitchen install lighting (without changing wall & fixture location). Dry rot replace window casing exterior sliding repair the dryrot around sliding door in lightwell. Not street review. Date: June 24, 2014 Contractor: Green Metro Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20140624751 | |||||
SCORE 84 Unit 6 / 2245 Beach St San Francisco Ca Hall bathroom. Replace tub faucet tub tile reinstall pedestal and toilet. Replace vanity light no change to tub and walls. Master bathoom: replace pedestal at same lcation new vanity light no change to shower. Date: May 20, 2014 Contractor: Green Metro Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140520873 | |||||
SCORE 84 Unit 4 / 1995 Turk St San Francisco Ca Unit #4: 15 lights 13 switches receptacles 1 fan 1 dishwasher 1 garbage disposal 1 microwave 1 range 4 smoke detectors; electrical outlets for living kitchen and bedrooms Date: February 8, 2018 Contractor: Green Metro Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E20180208858 | |||||
SCORE 84 Date: February 8, 2018 Contractor: Green Metro Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20180208652 | |||||
SCORE 84 1 Santa Clara Av San Francisco Ca Upgrade entire house electrical: add entertainment room powder room laundry room @ basement. Remodel (e) kitchen & bathroom bedroom 1 family room 1/f remodel (e) bathrooms & bedrooms on 2/f. Date: July 30, 2014 Contractor: Green Metro Inc Permit type: Electrical permit | Permit status: Issued | Permit id: E201407301559 | |||||
SCORE 84 1 Santa Clara Av San Francisco Ca Upgrade all plumbing in entire house: add powder room & laundry room @ basement remodel (e) kitchen & bathroom @ 1/f remodel (e) 2 bathrom on 2/f. Date: July 30, 2014 Contractor: Green Metro Inc Permit type: Plumbing permit | Permit status: Pos sent | Permit id: Pp20140730840 |