Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 124 Sw 106th Ave Tigard Or Connection of existing residence to newly installed sewer line. Connection will made more than 5 from the house. The existing septic tank is to be pumped, filled and inspected or removed and inspected. Reimbursement fee of 5,597. 82 was paid on this date, 12 28 99. Date: December 28, 1999 Contractor: Geotech Construction Inc Client: Shelledy | Permit type: Plumbing | Permit status: Closed | Permit id: Plm1999-00445 |