Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 2107 Foxhall Rd Nw, Washington, Dc 20007 Two geotechnical borings, b-5 and b-6, will be drilled to a depth of 25 feet or refusal with hollow stem augers. No monitoring well will be installed. Waste will be containerized in 55-gallon drums, tested, and disposed of with cut soils and demolition debris during construction. Boreholes will be tremie-grouted with 2 lb bentonite:1-gallon water slurry upon completion. The closest intersection is w street nw and foxhall road nw. Date: December 22, 2014 Contractor: Felipe Paraud Phillips Park Llc Marc Tschibelu Client: Felipe Paraud - Phillips Park Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500086 |