Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 2605 Mapleton Av Boulder Co Interior remodel of existing two story townhome. Includes relocation of washer dryer on first floor. Relocation of bathroom fixtures on second floor creating master bedroom and new closet with addition of toilet and shower stall. Client: Erin King | Applicant: Erin King | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 30, 2011 | Current use: Townhomes, remo |