Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 69 1016 16 St Nw Replace existing controllers, hoist motor, signal operating fixture (ada), car door panel , hoist rope, wiring, roller guide and door operators, retain speed and capacity. Tie into existing fire alarm Date: June 20, 2012 Contractor: Elcon Elevator Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1201994 | |||||
SCORE 69 1233 20th St Nw, Washington, Dc 20036 Replace existing westinghouse 38 overhead traction machine with titan ii overhead traction machine Date: February 17, 2012 Contractor: Elcon Elevator Client: Br-Core 1233 20th Street Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1201008 | |||||
SCORE 69 25 Louisiana Ave Nw, Washington, Dc 20001 Replace existing hoist machine with new. Not changing speed, capacityor weight of car. Date: August 13, 2012 Contractor: Elcon Elevator Client: International Brotherhood Of Teamsters | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1202433 | |||||
SCORE 69 38 Reservoir Rd Nw, Washington, Dc 20057 Replace existing controllers, hoist motor, signal operating fixture (ada), car door panel , hoist rope, wiring, roller guide and door operators, retain speed and capacity. Tie into existing fire alarm Date: June 20, 2012 Contractor: Elcon Elevator Client: President & Directors Of Georgetown University | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1201995 | |||||
SCORE 69 1016 16 St Nw Washington Dc Replace existing controllers, hoist motor, signal operating fixture (ada), car door panel , hoist rope, wiring, roller guide and door operators, retain speed and capacity. Tie into existing fire alarm Date: June 20, 2012 Contractor: Elcon Elevator Client: Mexcan American Legal Defense & Educational Fund | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1201994 | |||||
SCORE 69 30 K St Nw, Washington, Dc 20007 Repair/replace exsiting flood damaged controllers, effected door equiptment, hydraulic piston, pump unit, refubish limit switches and wiring. All new material provided will meet the current code. ( this w3ork is in additon to the work being performed under elevator permit number er1101413. Date: February 9, 2012 Contractor: Elcon Elevator Client: Rp Mrp Washington Harbour Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1200904 |