SCORE 59 10 F St Nw, Washington, Dc 20004 A hollow stem auger will install 6 temporary dewatering wells to a depth of feet by advancing a 12 inch od and 8. 25 id bore hole. At depth, a 4 inch pvc flush joint well assembly will be installed and select filter placed. Into each well will be installed a 5 hp turbine submersible pump. Date: November 6, 2014 Contractor: Drew Turner Client: Jemals Up Against The Wall, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500024 | |||||
SCORE 59 655 New York Ave Nw, Washington, Dc 20001 A hollow stem auger will install temporary dewatering wells to a depth of feet by advancing a 12 inch od and 8. 25 inch id bore hole. At depth, a 4 inch pvc flush joint well assembly will be installed and select filter placed. Into each well will be installed a 1 hp turbine submersible pump. Date: December 12, 2014 Contractor: Drew Turner Client: Douglas Development Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500040 |