Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 745 College Av Boulder Co Installation of a 5. 06 kw flush-mount grid-tie photovoltaic array. Panels & racking system to remain below ridge, above eave & inside the rake edges of the roof. Date: October 14, 2010 Contractor: Denver Solar And Wind Client: Thomas Miller, Miller | Applicant: Denver Solar And Wind | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Single family d | |||||
SCORE 59 745 College Av Boulder Co Installation of a 5. 06 kw flush-mount grid-tie photovoltaic array. Panels & racking system to remain below ridge, above eave & inside the rake edges of the roof. Client: Thomas Miller | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04507 |