Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 813 C St Se, Washington, Dc 20003 Remove tub, toilet, and sink. Add second sink, gently relocate toilet 12 inches to left, and remove tub and install a shower. Minor electrical changes per drawings. Tile shower stall and floor. Install new fixtures. Date: May 26, 2016 Contractor: Denise Thigpen; Todd Mizrahi Client: Denise Thigpen | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1608670 |