Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 2201 18th St Nw, Washington, Dc 20009 Body of work: this is a revision to er1701105 (attached copy). The elevator will temporarily not stop at 2nd floor while the second floor is under construction. We will temporarily adjust the controls to eliminate the second at this time. Once construction is complete the elevator will resume use of second floor. Date: June 13, 2017 Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1702469 | |||||
SCORE 59 1221 36th St Nw, Washington, Dc 20007 Body of work: upgrading one: hydrauilic elevator -see attached scope of work Date: July 26, 2017 Client: Georgetown University | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1702776 |