SCORE

DCPL C O ROB E. TATE

ABOUT DCPL C O ROB E. TATE

Dcpl C O Rob E. Tate specializes in:

Dcpl C O Rob E. Tate offers services:

Based on the information received from , associated with Dcpl C O Rob E. Tate over the past .

If you are considering hiring Dcpl C O Rob E. Tate for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Dcpl C O Rob E. Tate has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
66
901 G Street Nw Washington Dc
Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) close existing, paving; mill and overlay, fixture; bike rack(s), fixture; bike share station, fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree fence(s), landscaping; tree planting

Permit status: 12 | Expiration date: April 14, 2018 | Permit id: 0
066901 G Street Nw Washington DcDcpl C O Rob E. Tate
SCORE
66
901 G Street Nw Washington Dc
Existing conditions have 3 curb cuts (one off 9th street nw and two along g place, nw) the curb cut along 9th street will be closed while the 1 feet wide curb cut for the loading dock will be reduced to 52 feet with 9 radius as previously approved by ddot. One new street tree will be added along g place and all existing tree pits along g place, 9th street, and g street (total of 16) will be enlarged. Ten new bike racks are proposed in public space. New bike share proposed in private space. Four trash receptacles will be removed and replaced after construction. New curb and gutter will be install along the curb closings. A new ada curb ramp will be constructed at 9th and g place, and the 2 existing ada curb ramps at 9th and g street will be replaced
Date:  March 6, 2017

Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Assigned | Expiration date: April 14, 2018 | Permit id: 0
2017/03/06066901 G Street Nw Washington DcDcpl C O Rob E. Tate
SCORE
66
901 G Street Nw Washington Dc
Existing conditions have 3 curb cuts (one off 9th street nw and two along g place, nw) the curb cut along 9th street will be closed while the 1 feet wide curb cut for the loading dock will be reduced to 52 feet with 9 radius as previously approved by ddot. One new street tree will be added along g place and all existing tree pits along g place, 9th street, and g street (total of 16) will be enlarged. Ten new bike racks are proposed in public space. New bike share proposed in private space. Four trash receptacles will be removed and replaced after construction. New curb and gutter will be install along the curb closings. A new ada curb ramp will be constructed at 9th and g place, and the 2 existing ada curb ramps at 9th and g street will be replaced

Permit status: Assigned | Expiration date: April 14, 2018 | Permit id: 0
066901 G Street Nw Washington DcDcpl C O Rob E. Tate
SCORE
66
901 G Street Nw Washington Dc
Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) close existing, paving; mill and overlay, fixture; bike rack(s), fixture; bike share station, fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree fence(s), landscaping; tree planting

Permit status: 12 | Expiration date: April 14, 2018 | Permit id: 0
066901 G Street Nw Washington DcDcpl C O Rob E. Tate
SCORE
66
901 G Street Nw Washington Dc
Existing conditions have 3 curb cuts (one off 9th street nw and two along g place, nw) the curb cut along 9th street will be closed while the 1 feet wide curb cut for the loading dock will be reduced to 52 feet with 9 radius as previously approved by ddot. One new street tree will be added along g place and all existing tree pits along g place, 9th street, and g street (total of 16) will be enlarged. Ten new bike racks are proposed in public space. New bike share proposed in private space. Four trash receptacles will be removed and replaced after construction. New curb and gutter will be install along the curb closings. A new ada curb ramp will be constructed at 9th and g place, and the 2 existing ada curb ramps at 9th and g street will be replaced

Permit status: Assigned | Expiration date: April 14, 2018 | Permit id: 0
066901 G Street Nw Washington DcDcpl C O Rob E. Tate
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.