Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 31 College Pl, Asheville, Nc 28801 September 15, 2011 4:33:36 pm ssalyer. Installation of new sprinkler system and exists through entire bld for all tenants as asheville office park building d;sls per will buie provideing the water system extension plans showing the connection to the citys water system backflo devices and service line to the building if grading and erosion control permits are required will be submitting site work at later date;sls; december 6, 2011 12:05:48 pm heatherr. Rec. Amendment for horizntal fire ratings; har; april 3, 2012 12:35:25 pm heatherr. Rec. Fire sprinkler plans and hydraulic calculations; har; october 4, 2012 3:01: pm ssalyer. Rec application and drawings for asheville office park building d private fire line extension;sls; september 17, 2013 10:15:13 am heatherr. Rec. Amendment for rear exit ramp with cange in materials going from wood ramp to concrete and degree turn in different location; har; september 15, 2011 4:43:24 pm ssalyer. Submitted as tbd will need to have gc information si Client: Ashe Office Pk Bld D | Permit type: Com: remodel | Permit status: Finaled | Current use: Commercial | Permit id: 11-05370 | Parcel: 7674 |