Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 201 East Capitol St Se, Washington, Dc 20003 Probe investigation which includes the removal of six marble panels on the exterior faade of the folger shakespeare library to see how they are attached to the building and why some are failing. Scaffolding to be built two sections wide and five sections high on the east or garden elevation that is completely fenced off and away from the sidewalk to access three of the marble panels. The remaining 4 panels are reachable from the ground level in the back alley elevation. Scaffolding drawings are stamped by an certified engineer and the contract documents are prepared by the design team john milner associates and the engineering firm robert silman associates. Date: August 23, 2013 Contractor: Dan Lepore Sons Company Client: Trustees Of Amherst College | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1310286 | |||||
SCORE 59 201 East Capitol St Se, Washington, Dc 20003 Probe investigation which includes the removal of six marble panels on the exterior faade of the folger shakespeare library to see how they are attached to the building and why some are failing. Scaffolding to be built two sections wide and five sections high on the east or garden elevation that is completely fenced off and away from the sidewalk to access three of the marble panels. The remaining 4 panels are reachable from the ground level in the back alley elevation. Scaffolding drawings are stamped by an certified engineer and the contract documents are prepared by the design team john milner associates and the engineering firm robert silman associates. Date: August 23, 2013 Contractor: Dan Lepore Sons Company Client: Trustees Of Amherst College | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1310286 |