SCORE 99 Date: February 24, 2016 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00118 | |||||
SCORE 99 1 Hamilton Av, Palo Alto, Ca 94301 Palantir: first floor remodel (2 sf) for (e) tenant. No exterior work Permit type: Project - building permit | Permit status: Approved | Permit id: 16000-00404 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 14-2363:field clarification and accessibility updates per inspector. Date: February 5, 2016 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 16rev-00076 | |||||
SCORE 99 Date: January 19, 2016 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00109 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 Spec space improvements 11834sf, include new restrooms and mechanical, electrical and plumbing. Enlarge existing stair opening. Tenant improvements to be separate permit. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02983 | |||||
SCORE 99 Date: October 27, 2015 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-02846 | |||||
SCORE 99 Date: September 3, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00509 | |||||
SCORE 99 Date: August 13, 2015 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02151 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 14-2961: revise plans to include garage design at basement and 1st floor office layout and restrooms to match previously approved bulletin #2 core and shell permit documents.. Associated mep. Date: July 22, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00421 | |||||
SCORE 99 Date: June 11, 2015 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01483 | |||||
SCORE 99 181 Lytton Av, Palo Alto, Ca 94301 Palantir: demoliton of below grid partition to convert a conference room to open office space. Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-01344 | |||||
SCORE 99 Date: May 13, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00283 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 14-2363: plans amended with entitlement 13pln-00267 and revised interior work. Includes mep and structural. Revised valaution 3,975,0 from 3,500,0 on main permit and collect associated fees. Date: May 5, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00263 | |||||
SCORE 99 Date: April 30, 2015 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01061 | |||||
SCORE 99 Date: April 30, 2015 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01062 | |||||
SCORE 99 Date: April 28, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00243 | |||||
SCORE 99 Date: April 9, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00221 | |||||
SCORE 99 7 Welch Rd, Palo Alto, Ca 94304 Non-structural interior demo (7293 sf) including dining room b and dining room c Date: April 8, 2015 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00875 | |||||
SCORE 99 Date: April 6, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00211 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 14000-02513: revise planting in the planter strip. Exterior changes to colored concrete, site furniture, and decorative screens. Date: March 20, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00170 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 15000-00156: replace two (2) rooftop units. Replacement equipment is shorter than (e) and is below the height of the roof screening. No change to noise levels. Date: March 31, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00203 | |||||
SCORE 99 9 Emerson St, Palo Alto, Ca 94301 Commercial (n) 7 sf detached parking structure with 11 parking stalls (14pln-00116) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02987 | |||||
SCORE 99 9 Emerson St, Palo Alto, Ca 94301 Commercial existing facade, electrical service upgrade to 400amp in new location, new rooftop hvac, and parapet. (14pln-00116) - this permit is for conversion to office use only (does not include a request for school use) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-03274 | |||||
SCORE 99 Date: January 30, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00052 | |||||
SCORE 99 Date: February 12, 2015 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00367 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 14000-02513: upgrade the facade at the west entrance to match the previously approved facade changes at the front of the building. A new accessible stall will replace the previously non-compliant stall. Revise to show accessibility compliance. Additional landscape area has been added. Date: January 23, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00031 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 Core and shell improvements (41,0 sf) includes accessible restroom facilities code compliant exit stair, voluntary seismic retrofit, new mechanical, electrical, plumbing. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02363 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 Minor facade upgrade, new landscaping, parking re-stripe and parking lot accessibility improvements. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02513 | |||||
SCORE 99 299 California Av, Suite Palo Alto, Ca 94306 Existing tenant "true salon " to demise space and condense to new 1100sf space on ground floor. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02988 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 Interior non-structural demo. Construct vehicle service and pedestrian path at alley. Date: May 8, 2014 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01099 | |||||
SCORE 99 2335 El Camino Real, Palo Alto, Ca 94306 Breast cancer connections: interior non-structural demo on first and second floor Date: June 6, 2014 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01342 | |||||
SCORE 99 101 Lytton Av, Palo Alto, Ca 94301 U&o and tenant improvement for "chamber of commerce". Non-profit firm to occupy suite #355 ~1247 sf on ground floor. (u&o sent 12-17-14) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01020 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 Commercial interior non-structural demo. Front two suites off of main entrance only. ~ 7,795 sf Date: April 23, 2014 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00961 | |||||
SCORE 99 181 Lytton Av, Palo Alto, Ca 94301 Minor remodel to (e) ti on first and second floor: create (n) counter in (e) lobby, convert break to open office, remodel break area on second floor, no exterior changes Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00577 | |||||
SCORE 99 Date: January 27, 2014 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00050 | |||||
SCORE 99 3825 El Camino Real, Palo Alto, Ca 94306 Agile physical therapy: ti & u&o tenant to occupy the entire single story building (55 sf). Scope of work includes new storefront and new tankless water heater. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02703 | |||||
SCORE 99 3 Lambert Av, Palo Alto, Ca 94306 13-2164: deferred gas cabinet install (revision not completed - waiting for fire approval) Date: September 20, 2013 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 13rev-00577 | |||||
SCORE 99 415 California Av, Palo Alto, Ca 94306 Interior non-structural demo permit. 10. 21. 13 note added that utilities will not be terminated on private side. Jc Date: August 23, 2013 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02261 | |||||
SCORE 99 Date: July 2, 2013 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00412 | |||||
SCORE 99 925 Alma St, Palo Alto, Ca 94301 Spec space: create two new accessable restrooms in existing space ~2 sq ft Date: May 20, 2013 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01359 | |||||
SCORE 99 2 Cambridge Av, Palo Alto, Ca 94306 Tenant improvements to existing three story building, scope of work includse new lighting and revised mechancial ducting, new non-structural interior paritions and ceilings, and break room cabinetry. Date: January 2, 2013 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00032 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 (ref permit #12-869)deferred submittal for structural steel stairs and revised structural detail for elevator. Date: December 17, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00699 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 (ref permit #12-869) deferrred submittal for site irrigation plan Date: December 13, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00691 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 12-869: revision to include; new transom windows at north and south elevations, light fixtures at entrance enlarge electric and elevator machinery room and revise size of external louvers. Misc revision to lighting. Deferred submittal for elevator structural details and calculations. Date: October 24, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00581 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 Cold shell parking improvement ground floor addition to an existing 1-story structure and site. The existing structure will be elevated and refurbished for office use; the ground floor will be revised to provide (future) tenant parking. Date: April 17, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00869 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 Project consists of a 1,238 sf expansion to the existing one-story building. Scope of work includes: new exterior concrete walls, new glass and steel window wall, new ipe sun screen, and two new feature windows. Date: April 26, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00977 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 12-1005: "palantir" revision includes deletion of proposed office spaces and associated electrical and mechanical. Date: September 21, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00525 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 Existing tenant "palantir" ,tenant improvement; interior walls, ceilings, finishes and lighting. Associated electrical, mechanical and plumbing work. No change in use, increased occupant load or exterior work. Interior non structural demo for first and third floors. Second floor interior non structural demo under(12-1006) Date: May 1, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01005 | |||||
SCORE 99 4243 Manuela Av, Palo Alto, Ca 94306 11-132: revise accessible parking space to code. Extend concrete into landscaping. Date: August 20, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00466 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 (ref permit #12-389) architectural and structural coordination changes of the roof screens and stairs Date: August 13, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00448 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 12000-00977: revision consists of revising the occupancy load calculations to refelct (e) conditions -total occupant load has decreased. Columns previously built under 11000-02403 are being extended through the roof to match the new columns built under this permit. Date: August 1, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00420 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 Interior non structural demolition (2nd floor only) in preparation for ti; ti under(12-1005) Date: May 1, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01006 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 12-1005; remove three offices from the second floor. No change of use, occupant load or exiting. Associated mechanical and electrical changes. Date: June 29, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00365 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 Interior non-structural demo permit. Under separate permit (12-869) existing one-story building is going to be elevated to become a second story and new parking will be provided underneath Date: June 22, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01481 | |||||
SCORE 99 Date: May 10, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00263 | |||||
SCORE 99 Date: May 1, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01008 | |||||
SCORE 99 435 Acacia Av, Palo Alto, Ca 94306 Equinox: entry improvements (turn single door into a pair of double doors), new interiorlift, and stairway Date: February 21, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00391 | |||||
SCORE 99 541 Bryant St, Palo Alto, Ca 94301 Exterior facade improvements including rebuilt lattice and awnings, replacing doors and glazing above doors. Arb under 11pln-334 Date: January 27, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00227 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 Equinox: 11-31 revision includes adding gas lines and increase water main line to 2. 5". Date: April 16, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00218 | |||||
SCORE 99 Date: April 2, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00736 | |||||
SCORE 99 Unit 383 / 1 El Camino Real, Suite 383, Palo Alto, Ca 94304 Remove the existing rear exit door and create new rear exit door in existing rear corridor. Date: March 22, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00648 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 Ref permit #11-2482: revised scope of work to coordinate with previously submitted permit landscape and storefront improvements. The scope of work has been revised to remove the parking which is now under permit #12rev-000 (parent permit #11-2403). Date: February 28, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00117 | |||||
SCORE 99 10 Corporation Wy, Palo Alto, Ca 94303 Spec space upgrade includes interior renovations, new roll-up garage door and parking striping. Tenant improvement and u&o on separate permit. Date: January 31, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00244 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 11000-02403: revisions include: relocate driveway approach (with new curb cuts), extend slab and slab blockouts Date: January 26, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00050 | |||||
SCORE 99 Date: January 21, 2010 Contractor: Cody Brock Inc Permit status: B-complete | |||||
SCORE 99 5 University Av, Palo Alto, Ca 94301 Interior non-structural demo 3000sf. Tenant improvement under separate permit. Date: February 26, 2016 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00457 | |||||
SCORE 99 2335 El Camino Real, Palo Alto, Ca 94306 Breast cancer connections ti and u&o: 50 on both first and second floors. Includes new rooftop equipment, (n) interior non-bearing partitions, light fixtures, and upgrades to (e) mechanical and electrical systems. [[ unreasonable hardship exception request for existing buildings approved]] u&o sent 10/29/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01449 | |||||
SCORE 99 Unit 200 / 261 Hamilton Av, Ste 200, Palo Alto, Ca 94301 U&o and office tenant improvement for "palantir" on suite 200,3 and 4 for total of 15000sf. U&o sent on 12 01 16 Permit type: Project - building permit | Permit status: Finaled | Permit id: 16000-01310 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 U&o and tenant improvements to existing two story building, scope of work includes new electrical and mechanical installation, new interior partitions and ceilings,. Minor works to ground floor include new bicycle enclosure. U&o sent 5/8/15 Date: October 2, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02465 | |||||
SCORE 99 Date: May 5, 2016 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-01071 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 U&o and office tenant improvement for "rofu a. G." design firm to occupy ~13,0 sf on basement and ground level with mezzanine. U&o sent 3 23 16 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02961 | |||||
SCORE 99 Date: July 19, 2016 Contractor: Cody Brock Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00460 | |||||
SCORE 99 925 Alma St, Palo Alto, Ca 94301 Venati: ti and u&o for a 5,302 sf tenant space on the first floor. Exterior work involves the removal of two (2) planter boxes near the front door. U&o sent 7 25 16 Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-02509 | |||||
SCORE 99 2175 Bryant St, Palo Alto, Ca 94301 Remodel of (e) basement. Remove interior walls, add a wall at the interior stairway, add lighting. Add a motorized gate on the driveway. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-02089 | |||||
SCORE 99 1985 Louis Rd, Palo Alto, Ca 94303 First congregational church of pa: 358 sf addition and 6,2 sf remodel including renovation of (e) kitchen, and new social hall (15pln-00043 and 15pln-00095) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01243 | |||||
SCORE 99 1101 Embarcadero Rd, Palo Alto, Ca 94303 Ti and u&o for sfpm 1101 occupying 11,562 sf on 1st & 2nd floor: scope includes (n) offices, conference room, (n) herculite glass door and windows, (n) counter and base cabinet to match (e), provide (n) toilet accessories at womens restroom, accessible grab bar and folding seat, (n) finishes to retrofit (e), new rooftop hvac :: see 15000-00147 for additional u&o information. U&o sent 9/29/15 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00686 | |||||
SCORE 99 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00725 | |||||
SCORE 99 4062 Fabian St, Palo Alto, Ca 94303 16000-00724: revision to change from a ramp to step with rails at second floor Date: January 27, 2017 Contractor: Cody Brock Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 17rev-00043 | |||||
SCORE 99 Date: December 14, 2016 Contractor: Cody Brock Inc Permit type: Revision-building permit | Permit status: In plan check | Permit id: 16rev-00771 | |||||
SCORE 99 299 California Av, Suite Palo Alto, Ca 94306 U&o and restaurant tenant improvement for "calave", eating and drinking firm to occupy ~1300sf on ground. Address assignment submitted for suite 115 on 04. 27. 2015 jc. U&o sent 9/28/15 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00158 | |||||
SCORE 99 Date: March 23, 2015 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00175 | |||||
SCORE 99 4 Emerson St, Palo Alto, Ca 94301 Avidbank: ti and u&o, scope of work is 8 sf on the second floor and includes new conference room and break room. Tenant is on all three floors and area of tenant space is 90 sf. Unreasonable hardship granted for accessibiliy upgrades. Same tenant but name change from the private bank of the peninsula to avidbank. U&o sent 7/10/14 Date: September 14, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02299 | |||||
SCORE 99 164 Hamilton Av, Palo Alto, Ca 94301 T. I. Remodel to existing tenant "palantir" on third floor, area of work (222 sf): addition of hallway/corridor to secure access to floor, install 2 (n) card readers Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00536 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 05/17/14 permit application expired - plans discarded on 3/20/15. Palantir: commercial remodel (4161 sf) for existing tenant on the fourth floor. Date: May 17, 2013 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Void | Permit id: 13000-01329 | |||||
SCORE 99 1985 Louis Rd, Palo Alto, Ca 94303 15000-01243: replace sub panels as required by the building inspector Date: December 23, 2016 Contractor: Cody Brock Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00794 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 Suite 100, coho data: ti and u&o for a 12,215 sf tenant space. Tenant to occupy the entire first floor. Scope of work includes infilling one exterior door and chaning the swing on a door. U&o sent 12/10/15 Permit type: Project - building permit | Permit status: Finaled | Permit id: 15000-00156 | |||||
SCORE 99 2 Cambridge Av, Palo Alto, Ca 94306 Use and occupancy and tenant improvements for "alticecale" ~350sf on suite 103 to existing three story building, scope of work includes new telephone rooms, new break room and remodel office area. (u&o sent 7/11/14) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02324 | |||||
SCORE 99 Date: January 27, 2017 Contractor: Cody Brock Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 17rev-00042 | |||||
SCORE 99 2175 Bryant St, Palo Alto, Ca 94301 16-2089: clarification electrical work new and proposed at basement. Date: January 27, 2017 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Submitted | Permit id: 17000-00175 | |||||
SCORE 99 1985 Louis Rd, Palo Alto, Ca 94303 15000-01243: revision to modify the parking lot on embarcadero, move the trash enclosure 9. 5 ft east Date: November 14, 2016 Contractor: Cody Brock Inc Permit type: Revision-building permit | Permit status: In plan check | Permit id: 16rev-00719 | |||||
SCORE 99 3 Lambert Av, Palo Alto, Ca 94306 U&o and t. I. For (medical office, "jill l. Hessler mdpc") 4,0 sf, scope of work includes (n) non-structural interior partitions, (n) lighting, break room cabinetry, accessible path of travel. U&o sent 2/12/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02164 | |||||
SCORE 99 4062 Fabian St, Palo Alto, Ca 94303 Kittyhawk: u&o and tenant improvement for tenant to occupy entire building ( 22862 sf)scope of work includes seismic upgrade. Exterior changes and interior model for r&d machine shop. New cool roof. New landscape and driveway. Install new fire sprinklers. Upgrade electric service to 800amps. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00724 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 Equinox: u&o and partial demolition (483 sf) of an existing one-story building, construction of a new electrical room (98 sf), ti throughout (5743 sf). New mep systems and screened roof top mechanical systems. U&o sent 5/1/14 Date: February 21, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00389 | |||||
SCORE 99 151 Lytton Av, Palo Alto, Ca 94301 U&o and tenant improvement for "palantir technologies" tech firm to occupy - 4825sf on 1st floor. Includes new office space layout. U&o sent 4/29/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01442 | |||||
SCORE 99 158 University Av, Palo Alto, Ca 94301 U&o and storage / office tenant improvement for "palantir". U&o sent 4/25/14 Date: December 26, 2012 Contractor: Cody Brock Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-03136 | |||||
SCORE 99 25 Embarcadero Rd, Palo Alto, Ca 94303 07-03210: add barrier railings to second floor to reducethe exit egress travel distance Date: January 10, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00016 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Sidewalk refresh landscape for 261 hamilton and 541 ramona Date: March 23, 2015 Contractor: Cody Brock Inc Permit status: In plan check | Permit id: 15rev-00175 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 San Diego Ca 05 17 14 permit application expired - plans discarded on 3 20 15. Palantir: commercial remodel (4161 sf) for existing tenant on the fourth floor. Date: May 17, 2013 Contractor: Cody Brock Inc Permit status: Void | Permit id: 13000-01329 | |||||
SCORE 99 164 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca T. I. Remodel to existing tenant "palantir" on third floor, area of work (222 sf): addition of hallway corridor to secure access to floor, install 2 (n) card readers Permit status: Permit issued | Permit id: 15000-00536 | |||||
SCORE 99 Date: January 30, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15rev-00052 | |||||
SCORE 99 9 Emerson St, Palo Alto, Ca 94301 San Diego Ca Commercial (n) 7 sf detached parking structure with 11 parking stalls (14pln-00116) Permit status: Permit issued | Permit id: 14000-02987 | |||||
SCORE 99 Date: February 12, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15000-00367 | |||||
SCORE 99 Unit 104 / 2 Cambridge Av, Ste 104, Palo Alto, Ca 94306 San Diego Ca 17-2326: revision scope includes new office layout and breakroom. Date: December 5, 2017 Contractor: Cody Brock Inc Permit status: In plan check | Permit id: 17rev-00762 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 San Diego Ca 14000-02513: upgrade the facade at the west entrance to match the previously approved facade changes at the front of the building. A new accessible stall will replace the previously non-compliant stall. Revise to show accessibility compliance. Additional landscape area has been added. Date: January 23, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15rev-00031 | |||||
SCORE 99 9 Emerson St, Palo Alto, Ca 94301 San Diego Ca Commercial existing facade, electrical service upgrade to 600amp in new location, new rooftop hvac, and parapet. (14pln-00116) - this permit is for conversion to office use only (does not include a request for school use) Permit status: Permit issued | Permit id: 14000-03274 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 San Diego Ca Minor facade upgrade, new landscaping, parking re-stripe and parking lot accessibility improvements. Permit status: Permit issued | Permit id: 14000-02513 | |||||
SCORE 99 299 California Av, Suite Palo Alto, Ca 94306 San Diego Ca Existing tenant "true salon " to demise space and condense to new 1100sf space on ground floor. Permit status: Permit issued | Permit id: 14000-02988 | |||||
SCORE 99 2 Cambridge Av, Palo Alto, Ca 94306 San Diego Ca Use and occupancy and tenant improvements for "alticecale" ~350sf on suite 103 to existing three story building, scope of work includes new telephone rooms, new break room and remodel office area. (u&o sent 7 11 14) Permit status: Permit issued | Permit id: 13000-02324 | |||||
SCORE 99 4 Emerson St, Palo Alto, Ca 94301 San Diego Ca Avidbank: ti and u&o, scope of work is 8 sf on the second floor and includes new conference room and break room. Tenant is on all three floors and area of tenant space is 90 sf. Unreasonable hardship granted for accessibiliy upgrades. Same tenant but name change from the private bank of the peninsula to avidbank. U&o sent 7 10 14 Date: September 14, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-02299 | |||||
SCORE 99 2335 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Breast cancer connections: interior non-structural demo on first and second floor Date: June 6, 2014 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 14000-01342 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Interior non-structural demo. Construct vehicle service and pedestrian path at alley. Date: May 8, 2014 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 14000-01099 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Equinox: u&o and partial demolition (483 sf) of an existing one-story building, construction of a new electrical room (98 sf), ti throughout (5743 sf). New mep systems and screened roof top mechanical systems. U&o sent 5 1 14 Date: February 21, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00389 | |||||
SCORE 99 151 Lytton Av, Palo Alto, Ca 94301 San Diego Ca U&o and tenant improvement for "palantir technologies" tech firm to occupy - 4825sf on 1st floor. Includes new office space layout. U&o sent 4 29 14 Permit status: Permit issued | Permit id: 13000-01442 | |||||
SCORE 99 158 University Av, Palo Alto, Ca 94301 San Diego Ca U&o and storage office tenant improvement for "palantir". U&o sent 4 25 14 Date: December 26, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-03136 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 San Diego Ca Commercial interior non-structural demo. Front two suites off of main entrance only. ~ 7,795 sf Date: April 23, 2014 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 14000-00961 | |||||
SCORE 99 181 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Minor remodel to (e) ti on first and second floor: create (n) counter in (e) lobby, convert break to open office, remodel break area on second floor, no exterior changes Permit status: Permit issued | Permit id: 14000-00577 | |||||
SCORE 99 3 Lambert Av, Palo Alto, Ca 94306 San Diego Ca U&o and t. I. For (medical office, "jill l. Hessler mdpc") 4,0 sf, scope of work includes (n) non-structural interior partitions, (n) lighting, break room cabinetry, accessible path of travel. U&o sent 2 12 14 Permit status: Permit issued | Permit id: 13000-02164 | |||||
SCORE 99 151 Lytton Av, Palo Alto, Ca 94301 San Diego Ca (13000-01442) revised floor plan and (2) new phone rooms. Date: January 27, 2014 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 14rev-00050 | |||||
SCORE 99 3825 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Agile physical therapy: ti & u&o tenant to occupy the entire single story building (55 sf). Scope of work includes new storefront and new tankless water heater. Permit status: Permit issued | Permit id: 13000-02703 | |||||
SCORE 99 415 California Av, Palo Alto, Ca 94306 San Diego Ca Interior non-structural demo permit. 10. 21. 13 note added that utilities will not be terminated on private side. Jc Date: August 23, 2013 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 13000-02261 | |||||
SCORE 99 3 Lambert Av, Palo Alto, Ca 94306 San Diego Ca 13-2164: deferred gas cabinet install (revision not completed - waiting for fire approval) Date: September 20, 2013 Contractor: Cody Brock Inc Permit status: Completed | Permit id: 13rev-00577 | |||||
SCORE 99 Date: July 2, 2013 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 13rev-00412 | |||||
SCORE 99 925 Alma St, Palo Alto, Ca 94301 San Diego Ca Spec space: create two new accessable restrooms in existing space ~2 sq ft Date: May 20, 2013 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 13000-01359 | |||||
SCORE 99 2 Cambridge Av, Palo Alto, Ca 94306 San Diego Ca Tenant improvements to existing three story building, scope of work includse new lighting and revised mechancial ducting, new non-structural interior paritions and ceilings, and break room cabinetry. Date: January 2, 2013 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 13000-00032 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 San Diego Ca Cold shell parking improvement ground floor addition to an existing 1-story structure and site. The existing structure will be elevated and refurbished for office use; the ground floor will be revised to provide (future) tenant parking. Date: April 17, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00869 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 San Diego Ca (ref permit #12-869)deferred submittal for structural steel stairs and revised structural detail for elevator. Date: December 17, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00699 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 San Diego Ca 12-869: revision to include; new transom windows at north and south elevations, light fixtures at entrance enlarge electric and elevator machinery room and revise size of external louvers. Misc revision to lighting. Deferred submittal for elevator structural details and calculations. Date: October 24, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00581 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 San Diego Ca (ref permit #12-869) deferrred submittal for site irrigation plan Date: December 13, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00691 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Project consists of a 1,238 sf expansion to the existing one-story building. Scope of work includes: new exterior concrete walls, new glass and steel window wall, new ipe sun screen, and two new feature windows. Date: April 26, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00977 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 San Diego Ca 12-1005: "palantir" revision includes deletion of proposed office spaces and associated electrical and mechanical. Date: September 21, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00525 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 San Diego Ca Existing tenant "palantir" ,tenant improvement; interior walls, ceilings, finishes and lighting. Associated electrical, mechanical and plumbing work. No change in use, increased occupant load or exterior work. Interior non structural demo for first and third floors. Second floor interior non structural demo under(12-1006) Date: May 1, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-01005 | |||||
SCORE 99 4243 Manuela Av, Palo Alto, Ca 94306 San Diego Ca 11-132: revise accessible parking space to code. Extend concrete into landscaping. Date: August 20, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00466 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 San Diego Ca (ref permit #12-389) architectural and structural coordination changes of the roof screens and stairs Date: August 13, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00448 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 San Diego Ca 12000-00977: revision consists of revising the occupancy load calculations to refelct (e) conditions -total occupant load has decreased. Columns previously built under 11000-02403 are being extended through the roof to match the new columns built under this permit. Date: August 1, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00420 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 San Diego Ca Interior non structural demolition (2nd floor only) in preparation for ti; ti under(12-1005) Date: May 1, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-01006 | |||||
SCORE 99 151 University Av, Palo Alto, Ca 94301 San Diego Ca 12-1005; remove three offices from the second floor. No change of use, occupant load or exiting. Associated mechanical and electrical changes. Date: June 29, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00365 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 San Diego Ca Interior non-structural demo permit. Under separate permit (12-869) existing one-story building is going to be elevated to become a second story and new parking will be provided underneath Date: June 22, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-01481 | |||||
SCORE 99 4243 Manuela Av, Palo Alto, Ca 94306 San Diego Ca 11-1332: connect two (e) downspouts to new draining area Date: May 10, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00263 | |||||
SCORE 99 Date: May 1, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-01008 | |||||
SCORE 99 435 Acacia Av, Palo Alto, Ca 94306 San Diego Ca Equinox: entry improvements (turn single door into a pair of double doors), new interiorlift, and stairway Date: February 21, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00391 | |||||
SCORE 99 541 Bryant St, Palo Alto, Ca 94301 San Diego Ca Exterior facade improvements including rebuilt lattice and awnings, replacing doors and glazing above doors. Arb under 11pln-334 Date: January 27, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00227 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Equinox: 11-31 revision includes adding gas lines and increase water main line to 2. 5". Date: April 16, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00218 | |||||
SCORE 99 Date: April 2, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00736 | |||||
SCORE 99 Unit 383 / 1 El Camino Real, Suite 383, Palo Alto, Ca 94304 San Diego Ca Remove the existing rear exit door and create new rear exit door in existing rear corridor. Date: March 22, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00648 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Ref permit #11-2482: revised scope of work to coordinate with previously submitted permit landscape and storefront improvements. The scope of work has been revised to remove the parking which is now under permit #12rev-000 (parent permit #11-2403). Date: February 28, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00117 | |||||
SCORE 99 10 Corporation Wy, Palo Alto, Ca 94303 San Diego Ca Spec space upgrade includes interior renovations, new roll-up garage door and parking striping. Tenant improvement and u&o on separate permit. Date: January 31, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-00244 | |||||
SCORE 99 3127 El Camino Real, Palo Alto, Ca 94306 San Diego Ca 11000-02403: revisions include: relocate driveway approach (with new curb cuts), extend slab and slab blockouts Date: January 26, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00050 | |||||
SCORE 99 25 Embarcadero Rd, Palo Alto, Ca 94303 San Diego Ca 07-03210: add barrier railings to second floor to reducethe exit egress travel distance Date: January 10, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12rev-00016 | |||||
SCORE 99 181 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Palantir: demoliton of below grid partition to convert a conference room to open office space. Permit status: Approved | Permit id: 15000-01344 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 San Diego Ca 15000-00156: replace two (2) rooftop units. Replacement equipment is shorter than (e) and is below the height of the roof screening. No change to noise levels. Date: March 31, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15rev-00203 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca 14-2363: plans amended with entitlement 13pln-00267 and revised interior work. Includes mep and structural. Revised valaution 3,975,0 from 3,500,0 on main permit and collect associated fees. Date: May 5, 2015 Contractor: Cody Brock Inc Permit status: In plan check | Permit id: 15rev-00263 | |||||
SCORE 99 Date: April 6, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15rev-00211 | |||||
SCORE 99 Date: April 28, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15rev-00243 | |||||
SCORE 99 7 Welch Rd, Palo Alto, Ca 94304 San Diego Ca Non-structural interior demo (7293 sf) including dining room b and dining room c Date: April 8, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15000-00875 | |||||
SCORE 99 Date: April 9, 2015 Contractor: Cody Brock Inc Permit status: In plan check | Permit id: 15rev-00221 | |||||
SCORE 99 1 Channing Av, Palo Alto, Ca 94301 San Diego Ca 17000-00854: revision for accessibility hardship since (e) single occupancy toilet is too small. Date: September 21, 2017 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 17rev-00597 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 San Diego Ca 14000-02513: revise planting in the planter strip. Exterior changes to colored concrete, site furniture, and decorative screens. Date: March 20, 2015 Contractor: Cody Brock Inc Permit status: Completed | Permit id: 15rev-00170 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Core and shell improvements (41,0 sf) includes accessible restroom facilities code compliant exit stair, voluntary seismic retrofit, new mechanical, electrical, plumbing. Permit status: Permit issued | Permit id: 14000-02363 | |||||
SCORE 99 Date: April 30, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15000-01062 | |||||
SCORE 99 Date: April 30, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15000-01061 | |||||
SCORE 99 Date: June 11, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15000-01483 | |||||
SCORE 99 Date: March 24, 2017 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 17rev-00183 | |||||
SCORE 99 2175 Bryant St, Palo Alto, Ca 94301 San Diego Ca Remodel of (e) basement. Remove interior walls, add a wall at the interior stairway, add lighting. Add a motorized gate on the driveway. Permit status: Finaled | Permit id: 16000-02089 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 San Diego Ca 14000-02513: deferred submittal for exterior rain screen Date: May 13, 2015 Contractor: Cody Brock Inc Permit status: In plan check | Permit id: 15rev-00283 | |||||
SCORE 99 435 Portage Av, Palo Alto, Ca 94306 San Diego Ca U&o and tenant improvements to existing two story building, scope of work includes new electrical and mechanical installation, new interior partitions and ceilings,. Minor works to ground floor include new bicycle enclosure. U&o sent 5 8 15 Date: October 2, 2012 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 12000-02465 | |||||
SCORE 99 4062 Fabian St, Palo Alto, Ca 94303 San Diego Ca 16000-00724: revision to include removal of handrails at ramp near janitor laundry and ee lab (1st fl) updated detail on door schedule (door closer) revisions were redlined in original permit on pages a2 &13 Date: March 30, 2016 Contractor: Cody Brock Inc Permit status: In plan check | Permit id: 17rev-00202 | |||||
SCORE 99 Unit 110 / 299 California Av, Suite 110, Palo Alto, Ca 94306 San Diego Ca U&o and restaurant tenant improvement for "calave", eating and drinking firm to occupy ~1300sf on ground. Address assignment submitted for suite 115 on 04. 27. 2015 jc. U&o sent 9 28 15 Date: January 16, 2015 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 15000-00158 | |||||
SCORE 99 4062 Fabian St, Palo Alto, Ca 94303 San Diego Ca 16000-00724: increase the weight of two (2) pieces of equipment Date: April 7, 2017 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 17rev-00212 | |||||
SCORE 99 844 E Charleston Rd, Palo Alto, Ca 94303 San Diego Ca Landlord improvement: scope of work includes replacing all exterior glazing within existing frames, removing mezzanine, removing and replacing bathroom core and removal of interior structural walls. Scope of work includes new rooftop equipment Permit status: Permit issued | Permit id: 17000-00859 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca 14-2961: revise plans to include garage design at basement and 1st floor office layout and restrooms to match previously approved bulletin #2 core and shell permit documents.. Associated mep. Date: July 22, 2015 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 15rev-00421 | |||||
SCORE 99 Unit 1 / 4 Lytton Av, Ste 1, Palo Alto, Ca 94301 San Diego Ca New sprinklered covered trash enclosure (1 sf) to serve office building. Permit status: Permit issued | Permit id: 17000-02158 | |||||
SCORE 99 Unit 1 / 4 Lytton Av, Ste 1, Palo Alto, Ca 94301 San Diego Ca Commercial rebuild and u&o for "wing vc" to occupy entire two story building (6204 sf). Scope of work includes reframing entire second floor and roof, utility upgrades, adding fire sprinklers to the building, and replacing the side walk at the perimeter of the site. Permit status: Permit issued | Permit id: 17000-02157 | |||||
SCORE 99 418 Florence St, Palo Alto, Ca 94301 San Diego Ca Remodel for existing tenant "nokia growth partners" on the first floor (1956 sf) Permit status: Permit issued | Permit id: 17000-01109 | |||||
SCORE 99 1 Channing Av, Palo Alto, Ca 94301 San Diego Ca Landlord improvment to convert auto repair shop to office. Scope of work includes adding a vent fan to the roof, adding egress lighting, restripe parking lot, add accessible entry upgrades Permit status: Finaled | Permit id: 17000-00854 | |||||
SCORE 99 Unit 200 / 261 Hamilton Av, Ste 200, Palo Alto, Ca 94301 San Diego Ca U&o and office tenant improvement for "palantir" on suite 200,3 and 4 for total of 15000sf. U&o sent on 12 01 16 Date: May 31, 2016 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 16000-01310 | |||||
SCORE 99 4062 Fabian St, Palo Alto, Ca 94303 San Diego Ca Kittyhawk: u&o and tenant improvement for tenant to occupy entire building ( 22862 sf)scope of work includes seismic upgrade. Exterior changes and interior model for r&d machine shop. New cool roof. New landscape and driveway. Install new fire sprinklers. Upgrade electric service to 800amps. U&o sent 05 02 17 Permit status: Finaled | Permit id: 16000-00724 | |||||
SCORE 99 925 Alma St, Palo Alto, Ca 94301 San Diego Ca Venati: ti and u&o for a 5,302 sf tenant space on the first floor. Exterior work involves the removal of two (2) planter boxes near the front door. U&o sent 7 25 16 Date: September 22, 2015 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 15000-02509 | |||||
SCORE 99 1101 Embarcadero Rd, Palo Alto, Ca 94303 San Diego Ca Ti and u&o for sfpm 1101 occupying 11,562 sf on 1st & 2nd floor: scope includes (n) offices, conference room, (n) herculite glass door and windows, (n) counter and base cabinet to match (e), provide (n) toilet accessories at womens restroom, accessible grab bar and folding seat, (n) finishes to retrofit (e), new rooftop hvac :: see 15000-00147 for additional u&o information. U&o sent 9 29 15 Date: March 19, 2015 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 15000-00686 | |||||
SCORE 99 4151 Middlefield Rd, Palo Alto, Ca 94303 San Diego Ca Suite 100, coho data: ti and u&o for a 12,215 sf tenant space. Tenant to occupy the entire first floor. Scope of work includes infilling one exterior door and chaning the swing on a door. U&o sent 12 10 15 Date: January 16, 2015 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 15000-00156 | |||||
SCORE 99 261 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca U&o and office tenant improvement for "rofu a. G." design firm to occupy ~13,0 sf on basement and ground level with mezzanine. U&o sent 3 23 16 Date: November 14, 2014 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 14000-02961 | |||||
SCORE 99 2335 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Breast cancer connections ti and u&o: 50 on both first and second floors. Includes new rooftop equipment, (n) interior non-bearing partitions, light fixtures, and upgrades to (e) mechanical and electrical systems. [[ unreasonable hardship exception request for existing buildings approved]] u&o sent 10 29 14 Date: June 18, 2014 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 14000-01449 | |||||
SCORE 99 101 Lytton Av, Palo Alto, Ca 94301 San Diego Ca U&o and tenant improvement for "chamber of commerce". Non-profit firm to occupy suite #355 ~1247 sf on ground floor. (u&o sent 12-17-14) Date: April 30, 2014 Contractor: Cody Brock Inc Permit status: Finaled | Permit id: 14000-01020 | |||||
SCORE 99 Date: June 13, 2017 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 17000-01311 | |||||
SCORE 99 437 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Ti and u&o for new tenant "avidbank" new interior partition walls , offices, restrooms, and break room. 28 sf. New roof top unit. Permit status: Permit issued | Permit id: 17000-01307 | |||||
SCORE 99 475 Homer Av, Palo Alto, Ca 94301 San Diego Ca Accessibility upgrades and interior remodel for esisting tenant "womens club". New gas insert with dedicated gas line. Seismic upgrade. Reinforce chimney. Permit status: Permit issued | Permit id: 17000-01064 | |||||
SCORE 99 Unit 1 / 4 Lytton Av, Ste 1, Palo Alto, Ca 94301 San Diego Ca Non-structural interior demo only (60 sf) Permit status: Permit issued | Permit id: 17000-02542 | |||||
SCORE 99 Date: August 1, 2017 Contractor: Cody Brock Inc Permit status: Permit issued | Permit id: 17rev-00468 | |||||
SCORE 99 303 Parkside Dr, Palo Alto, Ca 94306 San Diego Ca Refurbish existing community pool, install plaster concrete, replace pumps Permit status: In plan check | Permit id: 17000-01750 | |||||
SCORE 99 821 San Antonio Av, Palo Alto, Ca 94303 San Diego Ca Owner improvements 10306 sf to first and second floors scope of work includes new restrooms, new stair, complete re roof and new roof screening Permit status: Permit issued | Permit id: 17000-02159 | |||||
SCORE 99 Permit status: In plan check | Permit id: 17000-01432 | |||||
SCORE 99 303 Parkside Dr, Palo Alto, Ca 94306 San Diego Ca New community building (1908 sf) and site improvements. Building is unconditioned. Concurrent review with planning application 16pln-00395 Permit status: In plan check | Permit id: 17000-01431 | |||||
SCORE 99 Client: Silver Oak Ii Llc | Permit status: B-4. Complete, e-4. Compl | Parcel: 67807018 | |||||
SCORE 99 25 Embarcadero Rd, Palo Alto, Ca 94303 07-03210: add barrier railings to second floor to reducethe exit egress travel distance Date: January 10, 2012 Contractor: Cody Brock Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00016 |