Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 209 10th Ave S 105 Nashville Tn 37203 4-14-2015-carla-added 976. 82 additional fee for additional cost of 100,000. For a generator to rehab suite #105 for zayo group communications z colo. Pursuant to ordinance no. 2006-1263 of the metropolitan code of laws, i (the holder on this permit) hereby certify that all construction and demolition waste generated by any and all activities governed by this permit shall be disposed of in an approved landfill. Further, i certify that no construction and demolition waste shall be stored on the property in violation of any provision of the metropolitan code. Permit type: Building commercial | Permit id: 201503226 | Parcel: 9309032000 | |||||
SCORE 88 725 Phipps Blvd Ne, Atlanta, Ga 30342 We will install a temporary pole with a 1 amp service entrance panel. From that pole, we will extend 6 branch circuits overhead (aerial) to 4-6 light poles that we will mount. Date: November 15, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Closed - passed | Permit id: Be-201309720 | |||||
SCORE 88 Date: November 14, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201309699 | |||||
SCORE 88 2 Williams St Nw, Atlanta, Ga 30303 New feeder from existing bus duct to feed a new 4 ton chiller on the rooftop for internap network services whos offices are on the bridge level suite e100. Date: September 30, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201308057 | |||||
SCORE 88 0 Hartsfield Jackson Intl Airport Sw, Atlanta, Ga 3032 Installation of voice and data structural cabling Date: September 12, 2013 Contractor: Cleveland Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201307501 | |||||
SCORE 88 1 Ivan Allen Jr Blvd Nw, Atlanta, Ga 30313 Electrical work for new building being built, including underground conduit and wiring as well as above ground feeders, branch circuits, and electrical equipment. Customer will bring plans in for review awatson 6 4 2013 Date: June 3, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201304285 | |||||
SCORE 88 Date: May 24, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201304078 | |||||
SCORE 88 Date: May 24, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201304080 | |||||
SCORE 88 10 Techwood Dr Nw, Atlanta, Ga 30318 Installation of outside generator to provide back-up energy power. 2 new electrical room to be constructes from interior space available 1020, 1030. Generator work previously permitted under permit # bb-201203486 Date: May 17, 2013 Contractor: Cleveland Electric Company Permit type: Alteration | Permit status: Issued | Permit id: Bb-201302632 | |||||
SCORE 88 Date: April 24, 2013 Contractor: Cleveland Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201303200 | |||||
SCORE 88 Date: April 10, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201302815 | |||||
SCORE 88 0 Hartsfield Atlanta, Atlanta, Ga Replace (10) light fixtures. Add (1) new dedicated circuit for security. Date: March 25, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201302384 | |||||
SCORE 88 Date: February 11, 2013 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201301103 | |||||
SCORE 88 10 Techwood Dr Nw, Atlanta, Ga 30318 Processed per don rosenthal customer obtained permit via online, license holder responsible Date: December 6, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201209688 | |||||
SCORE 88 Date: November 19, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201209268 | |||||
SCORE 88 Date: November 12, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201209081 | |||||
SCORE 88 2 Williams St Nw, Atlanta, Ga 30303 Electrical work-install temporary cabling for cousins provided temporary generator. Cabling to be removed after building generator repair. Date: October 25, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201208641 | |||||
SCORE 88 0 Hartsfield Atlanta, Atlanta, Ga Buildout of space at new international terminal. Will be a full service restaurant inside the international terminal. Adding a panelboard and transformer to feed this space Date: October 15, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201208341 | |||||
SCORE 88 Date: September 25, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201207760 | |||||
SCORE 88 0 Hartsfield Jackson Intl Airport Sw, Atlanta, Ga 3032 Convert an existing 4 sf storage room on level 1 of the t concourse to a ups room that will house a new 2x225 kva ups system and associated systems. A fm2 fire protection system, hvac unit, 2 exauhst fans, wall and ceiling ratings, roof, and switchboard re-feeding around existing new loads will also be installed. Date: September 20, 2012 Contractor: Cleveland Electric Company Permit type: Na | Permit status: Complete | Permit id: Bb-201204714 | |||||
SCORE 88 33 Peachtree Rd Ne, Atlanta, Ga 30326 Electrical installation associated with the addition to the marta buckhead station of the north entrance and pedestrian bridges Date: September 10, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201207355 | |||||
SCORE 88 Date: September 10, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201207349 | |||||
SCORE 88 10 Techwood Dr Nw, Atlanta, Ga 30318 Installtion of two generators and associated electrical duct banks (utility work only) Date: July 18, 2012 Contractor: Cleveland Electric Company Permit type: Miscellaneous | Permit status: Issued | Permit id: Bb-201203486 | |||||
SCORE 88 0 Hartsfield Jackson Intl Airport Sw, Atlanta, Ga 3032 Build out of shell space--do not process no approved plans yet 7-20-12 sjj Date: June 29, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201205767 | |||||
SCORE 88 Date: June 6, 2012 Contractor: Cleveland Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201204556 | |||||
SCORE 88 Date: May 16, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201203968 | |||||
SCORE 88 Date: May 10, 2012 Contractor: Cleveland Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201203830 | |||||
SCORE 88 Date: April 18, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201203108 | |||||
SCORE 88 0 Hartsfield Jackson Intl Airport Sw, Atlanta, Ga 3032 Additional 1000a distribution panel for concessions on depatures level, door revisions and ticket work Date: April 17, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201203072 | |||||
SCORE 88 0 Hartsfield Jackson Intl Airport Sw, Atlanta, Ga 3032 C1 mercantile building - building commercial alteration na - tenant build out of an existing retail space to include framing, sheetrock, acoustical, painting, flooring, millwork installation, hvac, and electrical. Date: March 28, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201202470 | |||||
SCORE 88 2 Williams St Nw, Atlanta, Ga 30303 Electrical installation for new generator, busway and paralleling switchgear Date: February 24, 2012 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201201520 | |||||
SCORE 88 Date: December 21, 2011 Contractor: Cleveland Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201108947 | |||||
SCORE 88 Date: December 16, 2011 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201108866 | |||||
SCORE 88 1201 West Peachtree St Ne, Atlanta, Ga Inspect and clean switchgear in the garage sat. 11 19 11 disconnect, reconnect only required. Date: November 15, 2011 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201108156 | |||||
SCORE 88 0 Hartsfield Atlanta, Atlanta, Ga Buildout of shell space for a restaurant retail at new international terminal Date: November 8, 2011 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201107958 | |||||
SCORE 88 1201 West Peachtree St Ne, Atlanta, Ga Perform electrical preventative maintenance on main switches sat. 11 19 11 6: pm disconnect-reconnect only required Date: November 7, 2011 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201107936 | |||||
SCORE 88 2 Williams St Nw, Atlanta, Ga 30303 Power feeders for new ups system, two new dry coolers, two new air conditioning units, replace three existing pumps Date: October 11, 2011 Contractor: Cleveland Electric Company Permit type: Electrical | Permit status: Issued | Permit id: Be-201107271 | |||||
SCORE 88 Date: August 23, 2011 Contractor: Cleveland Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201105996 | |||||
SCORE 88 Date: June 3, 2011 Contractor: Cleveland Electric Company Client: Riddle, Guy | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02391 | Parcel: 261318 | |||||
SCORE 88 209 10th Ave S 105 Nashville, Tn 37203 4-14-2015-carla-added 976. 82 additional fee for additional cost of 100,000. For a generator to rehab suite #105 for zayo group communications z colo. Pursuant to ordinance no. 2006-1263 of the metropolitan code of laws, i (the holder on this permit) hereby certify that all construction and demolition waste generated by any and all activities governed by this permit shall be disposed of in an approved landfill. Further, i certify that no construction and demolition waste shall be stored on the property in violation of any provision of the metropolitan code. Permit type: Building commercial - rehab | Permit id: 201503226 | Parcel: 09309032000 |