Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Date: July 23, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk483116 | Parcel: 0501256000 | |||||
SCORE 82 62 Boylston St Boston Ma 02116 Rebuilding sprinkler fire pump bfd paid detail required ;1 officer and 4 firefighters plus fire engine pumper to support system.; pump will need to be tested by fire prevention division at later date Date: May 13, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk464191 | |||||
SCORE 82 Date: July 22, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk490641 | Parcel: 2102565015 | |||||
SCORE 82 Date: June 12, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk476262 | Parcel: 2100891000 | |||||
SCORE 82 185 Dartmouth St Boston Ma 02116 Only one zone shall be impaired at any given time within the building for less than 8 hours.... Installation shall comply with 7 cmr and nfpa 13 Date: August 3, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk496557 | Parcel: 0401088000 | |||||
SCORE 82 10 Guest St Brighton Ma 02135 Note only one zone shall be impaired at any given time within the building.... All impairments shall be;coordinate with the buildings impairment coordinated which is required by 527 cmr 1. 00;section 16. 3 Date: July 21, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk492908 | Parcel: 2201906010 | |||||
SCORE 82 85 Devonshire St Boston Ma 02109 Adding and relocating sprinkler heads for proper coverage in-accordance with 7 cmr and nfpa 13 Date: August 3, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk496296 | |||||
SCORE 82 16 Beacon St Boston Ma 02108 Installing new os&;y valves bfd paid detail required... 1-officer &; 3-firefighters with pump Date: June 26, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk478727 | Parcel: 0304690001 | |||||
SCORE 82 38 Chauncy St Boston Ma 02111 Installing new piping on 13 and 14th floors only one floor shall be impaired at any given time Date: July 9, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk467542 | Parcel: 0304557000 | |||||
SCORE 82 Date: May 13, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk464160 | Parcel: 2101844000 | |||||
SCORE 82 11 Leon St Boston Ma 02115 Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: July 27, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk494395 | Parcel: 0402128010 | |||||
SCORE 82 140 148 E Berkeley St Roxbury Ma 02118 Installing proper sprinkler coverage if system connected to mings market... Impair only when unoccupied Date: July 1, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk485138 | Parcel: 0306335000 | |||||
SCORE 82 Date: July 16, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk480043 | Parcel: 1402800002 | |||||
SCORE 82 Date: June 10, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk473030 | Parcel: 2005903000 | |||||
SCORE 82 Date: August 11, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk497087 | |||||
SCORE 82 Date: December 21, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk548042 | Parcel: 0501314000 | |||||
SCORE 82 1102 Washington St Roxbury Ma 02118 Any impairment to the exiting sprinkler system shall be done in non business hours. The;sprinkler system shall be fully functioning during business hours. No hot work shall be permitted during sprinkler impairment. Installation shall comply with the requirements of 7 cmr and nfpa 13 Date: June 25, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk476686 | |||||
SCORE 82 8 Park Pz Boston Ma 02116 There shall be no other impaired in the building during this schedule work. Date: May 11, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk464209 | |||||
SCORE 82 Date: June 25, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk479782 | Parcel: 0903449000 | |||||
SCORE 82 1079 Commonwealth Av Allston Ma 02134 Coordinate impairment so that only one zone is impaired at any given time within the building Date: June 29, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk483103 | Parcel: 2100477000 | |||||
SCORE 82 12 Wales St Dorchester Ma 02121 Installing a new nfpa 13 sprinkler system 12 wales st dorchester ma 02124 Date: July 16, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk480050 | Parcel: 1402800020 | |||||
SCORE 82 Date: July 30, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk476288 | Parcel: 0602701002 | |||||
SCORE 82 1241 1251 Adams St Mattapan Ma 02124 Repairing main feed sprinkler pipe bfd paid detail required... 1-officer &; 3-firefighters with pump Date: August 14, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk503467 | Parcel: 1704031010 | |||||
SCORE 82 71 Fargo St Boston Ma 02210 ;installation per the requirements of 7 cmr and nfpa 13. Note only one zone shall be impaired at any given time throughout the building Date: June 24, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk478750 | Parcel: 0602834006 | |||||
SCORE 82 18 32 Penniman Rd Allston Ma 02134 Installation per the requirements of 7 cmr and nfpa 13. Note only one zone shall be impaired at any given time throughout the building Date: June 24, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk478737 | |||||
SCORE 82 99 Chauncy St Boston Ma 02111 Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: July 30, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk496036 | |||||
SCORE 82 Date: July 9, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk476882 | Parcel: 0303888000 | |||||
SCORE 82 Date: August 3, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk496190 | Parcel: 2101567001 | |||||
SCORE 82 1245 Adams St Mattapan Ma 02124 Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management... Installation shall comply with the requirements of 7 cmr and nfpa 13 Date: May 12, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk467597 | Parcel: 1704031600 | |||||
SCORE 82 Date: August 28, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk501903 | Parcel: 0306400000 | |||||
SCORE 82 151 Merrimac St West End Ma 02114 Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: August 28, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk509334 | |||||
SCORE 82 Date: August 28, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk509239 | Parcel: 0502819000 | |||||
SCORE 82 121 123 Beach St Boston Ma 02111 Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: September 9, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk509394 | Parcel: 0305346000 | |||||
SCORE 82 421 423 Hanover St Boston Ma 02113 System shall be tested in accordance with nfpa 25 table 5. 5. 1 bfd paid detail required Date: September 15, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk511040 | Parcel: 0303127000 | |||||
SCORE 82 9 Alvan Te Dorchester Ma 02125 Installing sprinkler system. Work to be done per nfpa stands 7 cmr one. Date: September 22, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk519538 | Parcel: 0704016000 | |||||
SCORE 82 Date: September 22, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk519654 | Parcel: 0305457000 | |||||
SCORE 82 26 Stillman St Boston Ma 02113 Relocate 3 sprinkler head. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. Date: September 22, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk520237 | Parcel: 0302469058 | |||||
SCORE 82 725 743 Tremont St Roxbury Ma 02118 Installing new sprinkler system. Work to be done per nfpa 13;stands. And 7 cmr. Date: September 22, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk520018 | Parcel: 0402600000 | |||||
SCORE 82 Date: September 22, 2015 Contractor: Clarion Fire Protection Permit type: Bfd other | Permit status: Na | Permit id: Sprk497429 | Parcel: 0501340000 | |||||
SCORE 82 Date: July 23, 2015 Contractor: Clarion Fire Protection Client: Lowe Real Estate Tr Of Ne | Permit type: Bfd sprinkler system | Permit id: Sprk483116 | Parcel: 0501256000 | |||||
SCORE 82 62 Boylston St Boston Ma Rebuilding sprinkler fire pump bfd paid detail required ;1 officer and 4 firefighters plus fire engine pumper to support system.; pump will need to be tested by fire prevention division at later date Date: May 13, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk464191 | |||||
SCORE 82 Date: July 22, 2015 Contractor: Clarion Fire Protection Client: Jewish Community House | Permit type: Bfd sprinkler system | Permit id: Sprk490641 | Parcel: 2102565015 | |||||
SCORE 82 Date: June 12, 2015 Contractor: Clarion Fire Protection Client: Blanchards Inc | Permit type: Bfd sprinkler system | Permit id: Sprk476262 | Parcel: 2100891000 | |||||
SCORE 82 185 Dartmouth St Boston Ma Only one zone shall be impaired at any given time within the building for less than 8 hours.... Installation shall comply with 7 cmr and nfpa 13 Date: August 3, 2015 Contractor: Clarion Fire Protection Client: The Copley 441 | Permit type: Bfd sprinkler system | Permit id: Sprk496557 | Parcel: 0401088000 | |||||
SCORE 82 10 Guest St Brighton Ma Note only one zone shall be impaired at any given time within the building.... All impairments shall be;coordinate with the buildings impairment coordinated which is required by 527 cmr 1. 00;section 16. 3 Date: July 21, 2015 Contractor: Clarion Fire Protection Client: Brighton Landin | Permit type: Bfd sprinkler system | Permit id: Sprk492908 | Parcel: 2201906010 | |||||
SCORE 82 85 Devonshire St Boston Ma Adding and relocating sprinkler heads for proper coverage in-accordance with 7 cmr and nfpa 13 Date: August 3, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk496296 | |||||
SCORE 82 16 Beacon St Boston Ma Installing new os&;y valves bfd paid detail required... 1-officer &; 3-firefighters with pump Date: June 26, 2015 Contractor: Clarion Fire Protection Client: Boston Bar Foun | Permit type: Bfd sprinkler system | Permit id: Sprk478727 | Parcel: 0304690001 | |||||
SCORE 82 38 Chauncy St Boston Ma Installing new piping on 13 and 14th floors only one floor shall be impaired at any given time Date: July 9, 2015 Contractor: Clarion Fire Protection Client: Fiveoo Commerc | Permit type: Bfd sprinkler system | Permit id: Sprk467542 | Parcel: 0304557000 | |||||
SCORE 82 Date: May 13, 2015 Contractor: Clarion Fire Protection Client: Washow Lps | Permit type: Bfd sprinkler system | Permit id: Sprk464160 | Parcel: 2101844000 | |||||
SCORE 82 11 Leon St Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: July 27, 2015 Contractor: Clarion Fire Protection Client: Hellenic Assn O | Permit type: Bfd sprinkler system | Permit id: Sprk494395 | Parcel: 0402128010 | |||||
SCORE 82 140 148 E Berkeley S Boston Ma Installing proper sprinkler coverage if system connected to mings market... Impair only when unoccupied Date: July 1, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk485138 | Parcel: 0306335000 | |||||
SCORE 82 Date: July 16, 2015 Contractor: Clarion Fire Protection Client: Bay State Prope | Permit type: Bfd sprinkler system | Permit id: Sprk480043 | Parcel: 1402800002 | |||||
SCORE 82 Date: June 10, 2015 Contractor: Clarion Fire Protection Client: Stonehedge Conv | Permit type: Bfd sprinkler system | Permit id: Sprk473030 | Parcel: 2005903000 | |||||
SCORE 82 Date: August 11, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk497087 | |||||
SCORE 82 1102 Washington St Boston Ma Any impairment to the exiting sprinkler system shall be done in non business hours. The;sprinkler system shall be fully functioning during business hours. No hot work shall be permitted during sprinkler impairment. Installation shall comply with the requirements of 7 cmr and nfpa 13 Date: June 25, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk476686 | |||||
SCORE 82 44 46 Winter St Boston Ma Impairment shall be coordinated with the buildings impairment coordinator so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. Date: October 24, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk526529 | Parcel: 0304767000 | |||||
SCORE 82 437 447 D St Boston Ma Impairment shall be coordinated with the buildings impairment coordinator so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. Date: October 24, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk526478 | Parcel: 0602833000 | |||||
SCORE 82 Date: November 12, 2015 Contractor: Clarion Fire Protection Client: Herb Chambers | Permit type: Bfd sprinkler system | Permit id: Sprk532015 | Parcel: 0501350000 | |||||
SCORE 82 Date: November 13, 2015 Contractor: Clarion Fire Protection Client: Ping An Condominium | Permit type: Bfd sprinkler system | Permit id: Sprk481809 | Parcel: 2100146000 | |||||
SCORE 82 85 Devonshire St Boston Ma Coordinate impairment with the building owners designated impairment coordinator so that only one zone is impaired at any time with the building. Installation shall comply with the requirements of 7 cmr and nfpa standards Date: November 21, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk532320 | |||||
SCORE 82 Date: November 21, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk530068 | Parcel: 0602699000 | |||||
SCORE 82 5 Lincoln St Allston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinated sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: November 27, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk535256 | Parcel: 2201638000 | |||||
SCORE 82 Leon St Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: July 27, 2015 Contractor: Clarion Fire Protection Client: Ralph C. Martin Ii Authorized Agent | Permit type: Bfd sprinkler system | Permit id: Sprk494399 | Parcel: 0402222010 | |||||
SCORE 82 137 139 South St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: December 14, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk543662 | Parcel: 0304324000 | |||||
SCORE 82 Date: December 21, 2015 Contractor: Clarion Fire Protection Client: Orika 121 Inc | Permit type: Bfd sprinkler system | Permit id: Sprk548042 | Parcel: 0501314000 | |||||
SCORE 82 35 37 Stanhope St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: January 4, 2016 Contractor: Clarion Fire Protection Client: Gordon Anthony O | Permit type: Bfd sprinkler system | Permit id: Sprk549080 | Parcel: 0401123000 | |||||
SCORE 82 535 541 Boylston St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: January 19, 2016 Contractor: Clarion Fire Protection Client: Regency Boylston Llc | Permit type: Bfd sprinkler system | Permit id: Sprk551553 | Parcel: 0501297000 | |||||
SCORE 82 Date: May 11, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk464209 | |||||
SCORE 82 Date: June 25, 2015 Contractor: Clarion Fire Protection Client: Maple Common Assoc Lmtd Ptnshp | Permit type: Bfd sprinkler system | Permit id: Sprk479782 | Parcel: 0903449000 | |||||
SCORE 82 1079 Commonwealth Av Allston Ma Coordinate impairment so that only one zone is impaired at any given time within the building Date: June 29, 2015 Contractor: Clarion Fire Protection Client: Hamilton Realty | Permit type: Bfd sprinkler system | Permit id: Sprk483103 | Parcel: 2100477000 | |||||
SCORE 82 Date: July 16, 2015 Contractor: Clarion Fire Protection Client: Dalin Multi Family Fund Lp | Permit type: Bfd sprinkler system | Permit id: Sprk480050 | Parcel: 1402800020 | |||||
SCORE 82 Date: July 30, 2015 Contractor: Clarion Fire Protection Client: Two- Summer L | Permit type: Bfd sprinkler system | Permit id: Sprk476288 | Parcel: 0602701002 | |||||
SCORE 82 1241 1251 Adams St Mattapan Ma Repairing main feed sprinkler pipe bfd paid detail required... 1-officer &; 3-firefighters with pump Date: August 14, 2015 Contractor: Clarion Fire Protection Client: Baker Square Co | Permit type: Bfd sprinkler system | Permit id: Sprk503467 | Parcel: 1704031010 | |||||
SCORE 82 71 Fargo St Boston Ma ;installation per the requirements of 7 cmr and nfpa 13. Note only one zone shall be impaired at any given time throughout the building Date: June 24, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk478750 | Parcel: 0602834006 | |||||
SCORE 82 18 32 Penniman Rd Allston Ma Installation per the requirements of 7 cmr and nfpa 13. Note only one zone shall be impaired at any given time throughout the building Date: June 24, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk478737 | |||||
SCORE 82 99 Chauncy St Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: July 30, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk496036 | |||||
SCORE 82 Date: July 9, 2015 Contractor: Clarion Fire Protection Client: Atlantic Bank | Permit type: Bfd sprinkler system | Permit id: Sprk476882 | Parcel: 0303888000 | |||||
SCORE 82 Date: August 3, 2015 Contractor: Clarion Fire Protection Client: Cinema Realty Trust | Permit type: Bfd sprinkler system | Permit id: Sprk496190 | Parcel: 2101567001 | |||||
SCORE 82 1245 Adams St Mattapan Ma Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management... Installation shall comply with the requirements of 7 cmr and nfpa 13 Date: May 12, 2015 Contractor: Clarion Fire Protection Client: Baker Sq Limite | Permit type: Bfd sprinkler system | Permit id: Sprk467597 | Parcel: 1704031600 | |||||
SCORE 82 Date: August 28, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk501903 | Parcel: 0306400000 | |||||
SCORE 82 151 Merrimac St West End Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: August 28, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk509334 | |||||
SCORE 82 Date: August 28, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk509239 | Parcel: 0502819000 | |||||
SCORE 82 121 123 Beach St Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: September 9, 2015 Contractor: Clarion Fire Protection Client: Beach St Condominium Trust | Permit type: Bfd sprinkler system | Permit id: Sprk509394 | Parcel: 0305346000 | |||||
SCORE 82 421 423 Hanover St Boston Ma System shall be tested in accordance with nfpa 25 table 5. 5. 1 bfd paid detail required Date: September 15, 2015 Contractor: Clarion Fire Protection Client: Acs Hanover Llc | Permit type: Bfd sprinkler system | Permit id: Sprk511040 | Parcel: 0303127000 | |||||
SCORE 82 Date: September 22, 2015 Contractor: Clarion Fire Protection Client: Fannie Mae | Permit type: Bfd sprinkler system | Permit id: Sprk519538 | Parcel: 0704016000 | |||||
SCORE 82 Date: September 22, 2015 Contractor: Clarion Fire Protection Client: Chow Uyiu K | Permit type: Bfd sprinkler system | Permit id: Sprk519654 | Parcel: 0305457000 | |||||
SCORE 82 26 Stillman St Boston Ma Relocate 3 sprinkler head. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. Date: September 22, 2015 Contractor: Clarion Fire Protection Client: Sammon John G | Permit type: Bfd sprinkler system | Permit id: Sprk520237 | Parcel: 0302469058 | |||||
SCORE 82 725 743 Tremont St Boston Ma Installing new sprinkler system. Work to be done per nfpa 13;stands. And 7 cmr. Date: September 22, 2015 Contractor: Clarion Fire Protection Client: Concord House | Permit type: Bfd sprinkler system | Permit id: Sprk520018 | Parcel: 0402600000 | |||||
SCORE 82 Date: September 22, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk497429 | Parcel: 0501340000 | |||||
SCORE 82 Date: October 10, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk522180 | |||||
SCORE 82 Date: October 19, 2015 Contractor: Clarion Fire Protection Client: Tale Constantine G | Permit type: Bfd sprinkler system | Permit id: Sprk525069 | Parcel: 2100835000 | |||||
SCORE 82 414 Tremont St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: February 17, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk557048 | |||||
SCORE 82 Date: June 22, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk593486 | |||||
SCORE 82 21 Temple Pl Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: June 15, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk591719 | |||||
SCORE 82 Winter Pl Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: July 1, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk601976 | |||||
SCORE 82 1 Guest St Brighton Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. Date: March 4, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk564314 | |||||
SCORE 82 Date: May 13, 2015 Contractor: Clarion Fire Protection Client: Washow Lps | Permit type: Bfd sprinkler system | Permit id: Sprk464160 | Parcel: 2101844000 | |||||
SCORE 82 38 Chauncy St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: July 6, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk606912 | |||||
SCORE 82 33 Union St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (nfpa 241 report) so that only one zone is impaired at any given time within the building Date: March 17, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk567489 | |||||
SCORE 82 1 Brighton Av Allston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: April 1, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk572874 | |||||
SCORE 82 178 Brooks St East Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Date: July 5, 2016 Contractor: Clarion Fire Protection Client: Branger Andres E | Permit type: Bfd sprinkler system | Permit id: Sprk604960 | Parcel: 0102839000 | |||||
SCORE 82 Date: June 12, 2015 Contractor: Clarion Fire Protection Client: Blanchards Inc Mass Corp | Permit type: Bfd sprinkler system | Permit id: Sprk476262 | Parcel: 2100891000 | |||||
SCORE 82 7579 Summer St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards bfd paid detail required Date: May 24, 2016 Contractor: Clarion Fire Protection Client: Dwf Iv Synergy 71-87 Summer | Permit type: Bfd sprinkler system | Permit id: Sprk586830 | Parcel: 0304562000 | |||||
SCORE 82 121123 Beach St Boston Ma Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: September 9, 2015 Contractor: Clarion Fire Protection Client: Beach Street Condominium Tr | Permit type: Bfd sprinkler system | Permit id: Sprk509394 | Parcel: 0305346000 | |||||
SCORE 82 725743 Tremont St Boston Ma Installing new sprinkler system. Work to be done per nfpa 13;stands. And 7 cmr. Date: September 22, 2015 Contractor: Clarion Fire Protection Client: Concord Houses Assoc Lp | Permit type: Bfd sprinkler system | Permit id: Sprk520018 | Parcel: 0402600000 | |||||
SCORE 82 Date: July 5, 2016 Contractor: Clarion Fire Protection Client: Fishbein Hal Etal | Permit type: Bfd sprinkler system | Permit id: Sprk604449 | Parcel: 0501185004 | |||||
SCORE 82 Date: June 22, 2016 Contractor: Clarion Fire Protection Client: Harrison Court Condo Trust | Permit type: Bfd sprinkler system | Permit id: Sprk588296 | Parcel: 0801401010 | |||||
SCORE 82 4 Washington St Brighton Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: June 16, 2016 Contractor: Clarion Fire Protection Client: Argirios Alexander A Ts | Permit type: Bfd sprinkler system | Permit id: Sprk594887 | Parcel: 2205159000 | |||||
SCORE 82 3537 Stanhope St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: January 4, 2016 Contractor: Clarion Fire Protection Client: Gordon Anthony O | Permit type: Bfd sprinkler system | Permit id: Sprk549080 | Parcel: 0401123000 | |||||
SCORE 82 535541 Boylston St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: January 19, 2016 Contractor: Clarion Fire Protection Client: John Hancock Life Insurance | Permit type: Bfd sprinkler system | Permit id: Sprk551553 | Parcel: 0501297000 | |||||
SCORE 82 12411251 Adams St Mattapan Ma Repairing main feed sprinkler pipe bfd paid detail required... 1-officer &; 3-firefighters with pump Date: August 14, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk503467 | |||||
SCORE 82 1832 Penniman Rd Allston Ma Installation per the requirements of 7 cmr and nfpa 13. Note only one zone shall be impaired at any given time throughout the building Date: June 24, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk478737 | |||||
SCORE 82 28 Quint Av Allston Ma Installation and testing ;shall comply with the requirements of 7 cmr nfpa 13 and nfpa25 bfd;paid detail 1-4;ff w pump! ; Date: April 14, 2016 Contractor: Clarion Fire Protection Client: Twenty 8 Quint Av Condo Tr | Permit type: Bfd sprinkler system | Permit id: Sprk575415 | Parcel: 2100921000 | |||||
SCORE 82 421423 Hanover St Boston Ma System shall be tested in accordance with nfpa 25 table 5. 5. 1 bfd paid detail required Date: September 15, 2015 Contractor: Clarion Fire Protection Client: Acs Hanover Llc | Permit type: Bfd sprinkler system | Permit id: Sprk511040 | Parcel: 0303127000 | |||||
SCORE 82 715 Tremont St Boston Ma Only one zone shall be impaired at any given time within the building.... Installation shall comply with the requirements of 7 cmr and nfpa 13 Date: April 30, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk578270 | |||||
SCORE 82 1249 Commonwealth Av Allston Ma Relocating sprinkler riser installing upright protection and relocating fire dept connection. Date: May 12, 2016 Contractor: Clarion Fire Protection Client: Comm Ave Bricks Llc | Permit type: Bfd sprinkler system | Permit id: Sprk578328 | Parcel: 2100865001 | |||||
SCORE 82 145 South St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: June 10, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk591055 | |||||
SCORE 82 4446 Winter St Boston Ma Impairment shall be coordinated with the buildings impairment coordinator so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. Date: October 24, 2015 Contractor: Clarion Fire Protection Client: Forty Four-46 Winter St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk526529 | Parcel: 0304767000 | |||||
SCORE 82 Date: April 1, 2016 Contractor: Clarion Fire Protection Client: Stuart Street Holdings Llc | Permit type: Bfd sprinkler system | Permit id: Sprk573336 | Parcel: 0401088000 | |||||
SCORE 82 234236 Clarendon St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: February 3, 2016 Contractor: Clarion Fire Protection Client: Jamestown 234-236 Clarendon | Permit type: Bfd sprinkler system | Permit id: Sprk552775 | Parcel: 0501359000 | |||||
SCORE 82 8183 Essex St Boston Ma Contactor shall submit test procedure code of record;to bfd prior to scheduling test Date: February 23, 2016 Contractor: Clarion Fire Protection Client: Essex St Primary Condo Tr | Permit type: Bfd sprinkler system | Permit id: Sprk559689 | Parcel: 0304450000 | |||||
SCORE 82 22 Liberty Dr Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: March 16, 2016 Contractor: Clarion Fire Protection Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk568046 | Parcel: 0602671025 | |||||
SCORE 82 Date: July 30, 2015 Contractor: Clarion Fire Protection Client: Channel Holdings Llc | Permit type: Bfd sprinkler system | Permit id: Sprk476288 | Parcel: 0602701002 | |||||
SCORE 82 Date: November 21, 2015 Contractor: Clarion Fire Protection Client: Two 74 Summer Street Nominee | Permit type: Bfd sprinkler system | Permit id: Sprk530068 | Parcel: 0602699000 | |||||
SCORE 82 960960h William T M Dorchester Ma Installing heads in tenant space bfd paid detail required ;if buildings affected are vacant at the time of work - no detail required. If buildings affected are occupied at the time of work - detail required. Date: August 22, 2016 Contractor: Clarion Fire Protection Client: Market Place Morrissey Llc | Permit type: Bfd sprinkler system | Permit id: Sprk578746 | Parcel: 1602500000 | |||||
SCORE 82 2 Newbury St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per nfpa 241);so that only one zone is impaired at any given time within the building Date: March 17, 2016 Contractor: Clarion Fire Protection Client: Two Newbury St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk567765 | Parcel: 0503148000 | |||||
SCORE 82 152 Hampden St Boston Ma Sprinkler repair work . The sprinkler system is down. No cutting burning! System out of service fire alarm system operational approved: paul p. Keeeley Date: March 22, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk568155 | Parcel: 0800791000 | |||||
SCORE 82 99111 Seaport Bl Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: July 5, 2016 Contractor: Clarion Fire Protection Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk603454 | Parcel: 0602640030 | |||||
SCORE 82 2 Newbury St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building. Date: March 4, 2016 Contractor: Clarion Fire Protection Client: Two Newbury St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk564433 | Parcel: 0503148000 | |||||
SCORE 82 253 Summer St Boston Ma Replacing corroded piping and leaking valves on sprinkle system . Bfd paid detail required Date: June 20, 2016 Contractor: Clarion Fire Protection Client: Summer Melcher Spe Llc | Permit type: Bfd sprinkler system | Permit id: Sprk592165 | Parcel: 0601163005 | |||||
SCORE 82 1 Tremont St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: March 17, 2016 Contractor: Clarion Fire Protection Client: Gregoriadis George | Permit type: Bfd sprinkler system | Permit id: Sprk566547 | Parcel: 0304842002 | |||||
SCORE 82 197 Marlborough St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards and isd approved shop drawings. Date: April 15, 2016 Contractor: Clarion Fire Protection Client: Weiner Jay M | Permit type: Bfd sprinkler system | Permit id: Sprk574009 | Parcel: 0502657000 | |||||
SCORE 82 Date: August 28, 2015 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk501903 | |||||
SCORE 82 Date: March 16, 2016 Contractor: Clarion Fire Protection Permit type: Bfd sprinkler system | Permit id: Sprk567482 | Parcel: 2001367000 | |||||
SCORE 82 437447 D St Boston Ma Impairment shall be coordinated with the buildings impairment coordinator so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25. Date: October 24, 2015 Contractor: Clarion Fire Protection Client: Four 37 D Street Condominium | Permit type: Bfd sprinkler system | Permit id: Sprk526478 | Parcel: 0602833000 | |||||
SCORE 82 25 Worcester Sq Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards....... Date: June 15, 2016 Contractor: Clarion Fire Protection Client: Twenty 5 Worcester Square | Permit type: Bfd sprinkler system | Permit id: Sprk593353 | Parcel: 0801516000 | |||||
SCORE 82 104104a Prince St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards Date: September 6, 2016 Contractor: Clarion Fire Protection Client: Pedi Joyce M | Permit type: Bfd sprinkler system | Permit id: Sprk590478 | Parcel: 0301414000 | |||||
SCORE 82 Date: June 6, 2016 Contractor: Clarion Fire Protection Client: Dwf Iv 38 Chauncy Llc | Permit type: Bfd sprinkler system | Permit id: Sprk589426 | Parcel: 0304557000 | |||||
SCORE 82 1 Harbor St Boston Ma Repairing backflow to building sprinkler sytem. Building sprinkler shut down during work. Bfd paid detail required 1 and 3 firefighters ; Date: June 6, 2016 Contractor: Clarion Fire Protection Client: Economic Development And | Permit type: Bfd sprinkler system | Permit id: Sprk596705 | Parcel: 0602674000 | |||||
SCORE 82 137139 South St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building Date: December 14, 2015 Contractor: Clarion Fire Protection Client: One 37 South St Condo Tr | Permit type: Bfd sprinkler system | Permit id: Sprk543662 | Parcel: 0304324000 | |||||
SCORE 82 Date: June 13, 2016 Contractor: Clarion Fire Protection Client: Atchinson Robert | Permit type: Bfd sprinkler system | Permit id: Sprk587489 | Parcel: 0502926000 | |||||
SCORE 82 Post Office Sq Boston Ma Note separate permit shall be submitted for installing new system: installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building bfd paid detail required Date: June 17, 2016 Contractor: Clarion Fire Protection Client: Shigo Po Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk596508 | Parcel: 0303880000 | |||||
SCORE 82 140148 E Berkeley S Boston Ma Installing proper sprinkler coverage if system connected to mings market... Impair only when unoccupied Date: July 1, 2015 Contractor: Clarion Fire Protection Client: Mattei Angelo Ts | Permit type: Bfd sprinkler system | Permit id: Sprk485138 | Parcel: 0306335000 | |||||
SCORE 82 4 Newbury St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per buildings nfpa 241 report )so that only one zone is impaired at any given time within the building Date: November 22, 2016 Contractor: Clarion Fire Protection Client: Tribeca Newbury St Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk571237 | Parcel: 0501253000 |