Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 69 Permit status: Other | Permit id: 247-B6972 | |||||
SCORE 69 Date: November 7, 1979 Contractor: Cascade Design Permit type: Building | Permit status: Expired | Current use: Residential | Permit id: 247-B6972 | |||||
SCORE 69 Date: October 28, 2008 Contractor: Cascade Design Permit type: Electrical | Permit status: Permit issued | Expiration date: October 28, 2009 | Current use: Commercial | Permit id: 6199009 | |||||
SCORE 69 38 1st Ave S Seattle Wa Supply 480vac 3 phase pwr to 480/400vac step down trnsfrmer then to fused disconnect to wire edm machine. 400vac, 10kva, 18 amps, 3 phase, hz. Supply pwr to related chiller 480vac 3 ph, 60hz, 6. 25 amps separately. Date: November 1, 2004 Contractor: Cascade Design Permit type: Electrical | Permit status: Permit finaled | Completion date: November 29, 2007 | Expiration date: November 1, 2007 | Current use: Commercial | Permit id: 6045739 | |||||
SCORE 69 38 1st Ave S Seattle Wa 4 amp service from 1000a switchboard to distribution center. Ground floor warehouse ok per ken (in house commercial electrician) 8/3/05 mlb: permit about to expire letter sent. 12/1/05 bew renewed permit Permit type: Electrical | Permit status: Permit finaled | Completion date: November 29, 2007 | Expiration date: September 20, 2006 | Current use: Commercial | Permit id: 6039034 |