Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 2914 P St Nw, Washington, Dc 20007 Renovation of master bathroom and walk in closets. Second floor of residence. Walk in closets will be installed where current bathroom is while new bathroom will be installed where walk-in closets are. Toilets will be moved to new location, new vanity and new bathtub will be installed, new flooring, new lightning, new plumbing. Steel beam will be installed to open access between walk in closet and bathroom. Date: July 19, 2012 Contractor: Carolyn Campbell Jean Amiel Jourdan Client: Carolyn M Campbell | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1210651 |