Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Date: June 26, 2017 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52013918101 | |||||
SCORE 98 Date: September 20, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32051665101 | |||||
SCORE 98 Date: September 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000732201 | |||||
SCORE 98 Date: January 20, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005482301 | |||||
SCORE 98 Date: January 30, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008901001 | |||||
SCORE 98 Date: December 17, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50020793802 | |||||
SCORE 98 Date: November 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006435002 | |||||
SCORE 98 Date: June 2, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50065207302 | |||||
SCORE 98 Date: December 10, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit reissued | Permit id: 52025684701 | |||||
SCORE 98 Date: November 25, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023802901 | |||||
SCORE 98 Date: September 8, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006435001 | |||||
SCORE 98 Date: March 1, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008009101 | |||||
SCORE 98 Date: September 28, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006342201 | |||||
SCORE 98 Date: April 16, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003411401 | |||||
SCORE 98 Date: September 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006440301 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006331502 | |||||
SCORE 98 Date: December 6, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006331501 | |||||
SCORE 98 Date: April 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006433202 | |||||
SCORE 98 Date: November 18, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005117601 | |||||
SCORE 98 Date: April 13, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005396801 | |||||
SCORE 98 Date: January 16, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50081707502 | |||||
SCORE 98 Date: February 14, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005664301 | |||||
SCORE 98 Date: December 9, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005261001 | |||||
SCORE 98 Date: September 10, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000699301 | |||||
SCORE 98 Date: September 8, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000761601 | |||||
SCORE 98 Date: September 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000736801 | |||||
SCORE 98 Date: September 8, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000762501 | |||||
SCORE 98 Date: September 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000731301 | |||||
SCORE 98 Date: March 31, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006021901 | |||||
SCORE 98 Date: April 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010345001 | |||||
SCORE 98 Date: December 11, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52002466001 | |||||
SCORE 98 Date: May 6, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003569401 | |||||
SCORE 98 Date: January 20, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008561101 | |||||
SCORE 98 Date: August 4, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023960701 | |||||
SCORE 98 Date: August 12, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004221201 | |||||
SCORE 98 Date: July 15, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004148201 | |||||
SCORE 98 Date: January 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52002608901 | |||||
SCORE 98 Date: January 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011250101 | |||||
SCORE 98 Date: November 15, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50090085803 | |||||
SCORE 98 Date: June 8, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50069732902 | |||||
SCORE 98 Date: October 21, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50069733802 | |||||
SCORE 98 Date: February 29, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51004362201 | |||||
SCORE 98 Date: December 6, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006321701 | |||||
SCORE 98 Date: September 10, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000701901 | |||||
SCORE 98 Date: October 21, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000721501 | |||||
SCORE 98 Date: June 15, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006781901 | |||||
SCORE 98 Date: September 13, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50070850302 | |||||
SCORE 98 Date: September 1, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001767801 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006343102 | |||||
SCORE 98 Date: October 28, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006343101 | |||||
SCORE 98 Date: April 20, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52019269301 | |||||
SCORE 98 Date: April 20, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51000338101 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006321702 | |||||
SCORE 98 Date: February 25, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51005610901 | |||||
SCORE 98 Date: December 8, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001745501 | |||||
SCORE 98 Date: October 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50090102702 | |||||
SCORE 98 Date: May 2, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005317402 | |||||
SCORE 98 Date: January 31, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011159301 | |||||
SCORE 98 Date: September 10, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000697501 | |||||
SCORE 98 Date: November 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009989302 | |||||
SCORE 98 Date: June 5, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005255802 | |||||
SCORE 98 Date: October 18, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010727801 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011577701 | |||||
SCORE 98 Date: October 3, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006166501 | |||||
SCORE 98 Date: February 20, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016940601 | |||||
SCORE 98 Date: April 12, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50081699502 | |||||
SCORE 98 Date: September 8, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000737701 | |||||
SCORE 98 Date: August 17, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010094301 | |||||
SCORE 98 Date: September 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000733101 | |||||
SCORE 98 Date: September 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000734001 | |||||
SCORE 98 Date: September 8, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000739501 | |||||
SCORE 98 Date: September 9, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001153001 | |||||
SCORE 98 Date: September 10, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000698401 | |||||
SCORE 98 Date: September 10, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000700001 | |||||
SCORE 98 Date: October 21, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000719901 | |||||
SCORE 98 Date: January 31, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011158401 | |||||
SCORE 98 Date: November 9, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005161101 | |||||
SCORE 98 Date: December 2, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005099801 | |||||
SCORE 98 Date: June 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009297001 | |||||
SCORE 98 Date: October 8, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001536801 | |||||
SCORE 98 Date: October 22, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001590101 | |||||
SCORE 98 Date: July 2, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50090085802 | |||||
SCORE 98 Date: August 5, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51004362201 | |||||
SCORE 98 Date: October 21, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000720601 | |||||
SCORE 98 Date: January 20, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005622401 | |||||
SCORE 98 Date: May 7, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52019114001 | |||||
SCORE 98 Date: September 3, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32019829101 | |||||
SCORE 98 Date: May 10, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12050195601 | |||||
SCORE 98 Date: February 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008012601 | |||||
SCORE 98 Date: October 24, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016442901 | |||||
SCORE 98 Date: October 21, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000722401 | |||||
SCORE 98 Date: December 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016790701 | |||||
SCORE 98 Date: September 22, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001145101 | |||||
SCORE 98 Date: May 3, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006889001 | |||||
SCORE 98 Date: May 8, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 10426916802 | |||||
SCORE 98 Date: March 22, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12038798201 | |||||
SCORE 98 Date: June 8, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50073013102 | |||||
SCORE 98 Date: January 20, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52002483901 | |||||
SCORE 98 Date: February 24, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009067801 | |||||
SCORE 98 Date: January 7, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50041544603 | |||||
SCORE 98 Date: December 11, 2007 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50041544602 | |||||
SCORE 98 Date: March 16, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006116501 | |||||
SCORE 98 Date: September 23, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006513502 | |||||
SCORE 98 Date: September 23, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006514402 | |||||
SCORE 98 Date: November 9, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010734901 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014783101 | |||||
SCORE 98 Date: September 8, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000738601 | |||||
SCORE 98 Date: March 5, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009049101 | |||||
SCORE 98 Date: October 14, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000810701 | |||||
SCORE 98 Date: September 27, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009912501 | |||||
SCORE 98 Date: April 13, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006318101 | |||||
SCORE 98 Date: January 17, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008823501 | |||||
SCORE 98 Date: May 2, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50047299003 | |||||
SCORE 98 Date: May 4, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50047299002 | |||||
SCORE 98 Date: July 10, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024043601 | |||||
SCORE 98 Date: December 23, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005477001 | |||||
SCORE 98 Date: August 21, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021852201 | |||||
SCORE 98 Date: November 29, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007346501 | |||||
SCORE 98 Date: May 18, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006321601 | |||||
SCORE 98 Date: November 17, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006537701 | |||||
SCORE 98 Date: November 14, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001767802 | |||||
SCORE 98 Date: November 17, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006508201 | |||||
SCORE 98 Date: September 23, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006509102 | |||||
SCORE 98 Date: September 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003479301 | |||||
SCORE 98 Date: July 8, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016701501 | |||||
SCORE 98 Date: January 7, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005657201 | |||||
SCORE 98 Date: November 17, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006505501 | |||||
SCORE 98 Date: January 5, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024851701 | |||||
SCORE 98 Date: June 23, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023232901 | |||||
SCORE 98 Date: August 25, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016701502 | |||||
SCORE 98 Date: November 20, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006282401 | |||||
SCORE 98 Date: October 4, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010614401 | |||||
SCORE 98 Date: November 15, 2001 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 40117814001 | |||||
SCORE 98 Date: November 27, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016139701 | |||||
SCORE 98 Date: September 21, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51001091601 | |||||
SCORE 98 Date: July 23, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32017722301 | |||||
SCORE 98 Date: September 17, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32006889501 | |||||
SCORE 98 Date: October 22, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010614401 | |||||
SCORE 98 Date: December 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit reissued | Permit id: 52023638901 | |||||
SCORE 98 Date: March 21, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50034657401 | |||||
SCORE 98 Date: March 1, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50009661001 | |||||
SCORE 98 Date: November 9, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008170401 | |||||
SCORE 98 Date: June 3, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003841401 | |||||
SCORE 98 Date: March 2, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005654501 | |||||
SCORE 98 Date: December 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014093601 | |||||
SCORE 98 Date: November 20, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016812101 | |||||
SCORE 98 Date: November 5, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001870201 | |||||
SCORE 98 Date: March 13, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011155701 | |||||
SCORE 98 Date: November 18, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005116701 | |||||
SCORE 98 Date: December 11, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001594701 | |||||
SCORE 98 Date: January 10, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011723001 | |||||
SCORE 98 Date: July 1, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006412601 | |||||
SCORE 98 Date: April 27, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001535901 | |||||
SCORE 98 Date: September 22, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004670801 | |||||
SCORE 98 Date: January 20, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50026262702 | |||||
SCORE 98 Date: December 23, 2008 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51005890001 | |||||
SCORE 98 Date: January 16, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006008701 | |||||
SCORE 98 Date: May 20, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006775801 | |||||
SCORE 98 Date: August 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010744701 | |||||
SCORE 98 Date: October 21, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000718001 | |||||
SCORE 98 Date: September 28, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006439601 | |||||
SCORE 98 Date: October 17, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006438702 | |||||
SCORE 98 Date: October 12, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006438701 | |||||
SCORE 98 Date: June 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009296101 | |||||
SCORE 98 Date: December 11, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001596501 | |||||
SCORE 98 Date: January 20, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001595601 | |||||
SCORE 98 Date: January 5, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008626401 | |||||
SCORE 98 Date: March 1, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009158801 | |||||
SCORE 98 Date: January 4, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50062127701 | |||||
SCORE 98 Date: March 3, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52013843101 | |||||
SCORE 98 Date: April 15, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50039754501 | |||||
SCORE 98 Date: July 10, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000113101 | |||||
SCORE 98 Date: August 25, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000113102 | |||||
SCORE 98 Date: May 3, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009592201 | |||||
SCORE 98 Date: September 7, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000735901 | |||||
SCORE 98 Date: September 15, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001819601 | |||||
SCORE 98 Date: September 15, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003006502 | |||||
SCORE 98 Date: October 6, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52002703301 | |||||
SCORE 98 Date: July 25, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006909601 | |||||
SCORE 98 Date: September 14, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004619201 | |||||
SCORE 98 Date: February 9, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005063001 | |||||
SCORE 98 Date: October 14, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001966701 | |||||
SCORE 98 Date: February 17, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50009807502 | |||||
SCORE 98 Date: March 21, 1995 Contractor: Capital Contr P And H Corp Permit status: Permit reissued | Permit id: 50009807501 | |||||
SCORE 98 Date: July 29, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004086601 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006328002 | |||||
SCORE 98 Date: December 6, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006328001 | |||||
SCORE 98 Date: March 30, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009535201 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006327102 | |||||
SCORE 98 Date: December 6, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006327101 | |||||
SCORE 98 Date: July 29, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001274401 | |||||
SCORE 98 Date: March 31, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003254401 | |||||
SCORE 98 Date: April 13, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006222601 | |||||
SCORE 98 Date: July 16, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010069401 | |||||
SCORE 98 Date: September 23, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50046644402 | |||||
SCORE 98 Date: March 13, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012040401 | |||||
SCORE 98 Date: March 13, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012039701 | |||||
SCORE 98 Date: October 1, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006511703 | |||||
SCORE 98 Date: February 7, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011580201 | |||||
SCORE 98 Date: March 3, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 54008798401 | |||||
SCORE 98 Date: October 10, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016435801 | |||||
SCORE 98 Date: July 29, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011279801 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006535901 | |||||
SCORE 98 Date: February 19, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023080201 | |||||
SCORE 98 Date: July 22, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52002871902 | |||||
SCORE 98 Date: May 20, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006773001 | |||||
SCORE 98 Date: May 20, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006772101 | |||||
SCORE 98 Date: March 22, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52025451801 | |||||
SCORE 98 Date: March 3, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014394202 | |||||
SCORE 98 Date: March 13, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012042201 | |||||
SCORE 98 Date: March 31, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011154802 | |||||
SCORE 98 Date: March 31, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011155702 | |||||
SCORE 98 Date: March 24, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020685701 | |||||
SCORE 98 Date: May 20, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006766901 | |||||
SCORE 98 Date: May 20, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006767801 | |||||
SCORE 98 Date: May 20, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006769601 | |||||
SCORE 98 Date: December 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024767001 | |||||
SCORE 98 Date: December 23, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020746402 | |||||
SCORE 98 Date: December 16, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021076201 | |||||
SCORE 98 Date: June 5, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024339901 | |||||
SCORE 98 Date: October 24, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020805201 | |||||
SCORE 98 Date: December 23, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020919502 | |||||
SCORE 98 Date: December 4, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007577501 | |||||
SCORE 98 Date: November 21, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004172102 | |||||
SCORE 98 Date: October 1, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006514403 | |||||
SCORE 98 Date: May 4, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021094001 | |||||
SCORE 98 Date: February 18, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit reissued | Permit id: 52023478201 | |||||
SCORE 98 Date: June 4, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006431402 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006536801 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006539501 | |||||
SCORE 98 Date: October 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024521701 | |||||
SCORE 98 Date: June 19, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024123901 | |||||
SCORE 98 Date: June 26, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023898401 | |||||
SCORE 98 Date: October 19, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023945701 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006533101 | |||||
SCORE 98 Date: May 7, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 11046246401 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006532201 | |||||
SCORE 98 Date: July 23, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020934601 | |||||
SCORE 98 Date: March 17, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32132315301 | |||||
SCORE 98 Date: August 14, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012082301 | |||||
SCORE 98 Date: February 11, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009092703 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006540201 | |||||
SCORE 98 Date: January 5, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006543801 | |||||
SCORE 98 Date: May 4, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021030701 | |||||
SCORE 98 Date: July 29, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52018520001 | |||||
SCORE 98 Date: September 23, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006512602 | |||||
SCORE 98 Date: March 17, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52019889301 | |||||
SCORE 98 Date: July 29, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020178101 | |||||
SCORE 98 Date: December 13, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003076001 | |||||
SCORE 98 Date: December 13, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003078801 | |||||
SCORE 98 Date: December 9, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003271301 | |||||
SCORE 98 Date: February 22, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003271302 | |||||
SCORE 98 Date: October 27, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003494401 | |||||
SCORE 98 Date: February 17, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003462201 | |||||
SCORE 98 Date: June 6, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52002588301 | |||||
SCORE 98 Date: June 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003487301 | |||||
SCORE 98 Date: September 8, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006433201 | |||||
SCORE 98 Date: September 8, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006434101 | |||||
SCORE 98 Date: December 6, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006330601 | |||||
SCORE 98 Date: September 8, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006432301 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007313401 | |||||
SCORE 98 Date: December 21, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003693302 | |||||
SCORE 98 Date: April 5, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51002665001 | |||||
SCORE 98 Date: April 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006432302 | |||||
SCORE 98 Date: April 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006329902 | |||||
SCORE 98 Date: April 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006340402 | |||||
SCORE 98 Date: April 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006330602 | |||||
SCORE 98 Date: September 24, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007576602 | |||||
SCORE 98 Date: June 4, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014133801 | |||||
SCORE 98 Date: June 6, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004599601 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006534001 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006541101 | |||||
SCORE 98 Date: November 19, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12045172301 | |||||
SCORE 98 Date: August 26, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005192401 | |||||
SCORE 98 Date: August 26, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005195101 | |||||
SCORE 98 Date: March 8, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005421701 | |||||
SCORE 98 Date: March 8, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005317401 | |||||
SCORE 98 Date: June 15, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005674101 | |||||
SCORE 98 Date: March 16, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006114701 | |||||
SCORE 98 Date: April 16, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011836401 | |||||
SCORE 98 Date: December 16, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009829701 | |||||
SCORE 98 Date: December 13, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014229301 | |||||
SCORE 98 Date: June 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50070821902 | |||||
SCORE 98 Date: November 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024544001 | |||||
SCORE 98 Date: September 13, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006326101 | |||||
SCORE 98 Date: May 15, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012964601 | |||||
SCORE 98 Date: December 5, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006532101 | |||||
SCORE 98 Date: December 5, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006533001 | |||||
SCORE 98 Date: April 5, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52022129701 | |||||
SCORE 98 Date: September 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006254801 | |||||
SCORE 98 Date: September 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006253901 | |||||
SCORE 98 Date: September 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006167401 | |||||
SCORE 98 Date: September 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006255701 | |||||
SCORE 98 Date: January 11, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006533002 | |||||
SCORE 98 Date: March 19, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 10179733402 | |||||
SCORE 98 Date: May 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006946101 | |||||
SCORE 98 Date: May 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006947001 | |||||
SCORE 98 Date: November 20, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010754401 | |||||
SCORE 98 Date: November 20, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004172101 | |||||
SCORE 98 Date: June 21, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006880901 | |||||
SCORE 98 Date: November 9, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007152801 | |||||
SCORE 98 Date: March 1, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007486501 | |||||
SCORE 98 Date: May 3, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007442801 | |||||
SCORE 98 Date: May 3, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007441901 | |||||
SCORE 98 Date: May 3, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007443701 | |||||
SCORE 98 Date: November 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016675701 | |||||
SCORE 98 Date: April 6, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 34031054001 | |||||
SCORE 98 Date: October 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024421801 | |||||
SCORE 98 Date: March 9, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52019170102 | |||||
SCORE 98 Date: November 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009988402 | |||||
SCORE 98 Date: April 22, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52026369701 | |||||
SCORE 98 Date: March 28, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52025930901 | |||||
SCORE 98 Date: April 22, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52026368801 | |||||
SCORE 98 Date: April 14, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021030702 | |||||
SCORE 98 Date: November 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016715901 | |||||
SCORE 98 Date: April 5, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007578401 | |||||
SCORE 98 Date: February 24, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008011701 | |||||
SCORE 98 Date: February 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008008201 | |||||
SCORE 98 Date: February 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008013501 | |||||
SCORE 98 Date: February 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008014401 | |||||
SCORE 98 Date: March 1, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008010801 | |||||
SCORE 98 Date: April 5, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007796001 | |||||
SCORE 98 Date: July 20, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007831701 | |||||
SCORE 98 Date: June 28, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009091801 | |||||
SCORE 98 Date: October 27, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52019532401 | |||||
SCORE 98 Date: November 10, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 14021596001 | |||||
SCORE 98 Date: October 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52024520801 | |||||
SCORE 98 Date: April 19, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 34018888901 | |||||
SCORE 98 Date: April 22, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52026370401 | |||||
SCORE 98 Date: April 22, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52022373001 | |||||
SCORE 98 Date: April 22, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52026367901 | |||||
SCORE 98 Date: April 18, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 54008863401 | |||||
SCORE 98 Date: July 13, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020890801 | |||||
SCORE 98 Date: May 23, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006255601 | |||||
SCORE 98 Date: March 6, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008578201 | |||||
SCORE 98 Date: March 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021851301 | |||||
SCORE 98 Date: December 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011576801 | |||||
SCORE 98 Date: January 23, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007314301 | |||||
SCORE 98 Date: June 6, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014085601 | |||||
SCORE 98 Date: June 28, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011506301 | |||||
SCORE 98 Date: May 18, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014782201 | |||||
SCORE 98 Date: April 20, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 34030791001 | |||||
SCORE 98 Date: February 8, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008877001 | |||||
SCORE 98 Date: February 29, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008737001 | |||||
SCORE 98 Date: February 14, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007906701 | |||||
SCORE 98 Date: June 28, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52009092701 | |||||
SCORE 98 Date: June 27, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014393301 | |||||
SCORE 98 Date: June 28, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009092701 | |||||
SCORE 98 Date: November 20, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016717701 | |||||
SCORE 98 Date: October 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020869502 | |||||
SCORE 98 Date: January 17, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005255801 | |||||
SCORE 98 Date: April 5, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009402201 | |||||
SCORE 98 Date: April 20, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009350401 | |||||
SCORE 98 Date: October 18, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009538901 | |||||
SCORE 98 Date: April 12, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009630601 | |||||
SCORE 98 Date: August 22, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32046298601 | |||||
SCORE 98 Date: July 13, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010083601 | |||||
SCORE 98 Date: July 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009990001 | |||||
SCORE 98 Date: July 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009988401 | |||||
SCORE 98 Date: May 30, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012490901 | |||||
SCORE 98 Date: April 18, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 54008797501 | |||||
SCORE 98 Date: March 28, 2016 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52025931801 | |||||
SCORE 98 Date: October 28, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006341301 | |||||
SCORE 98 Date: November 20, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010755301 | |||||
SCORE 98 Date: April 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006341302 | |||||
SCORE 98 Date: April 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010261001 | |||||
SCORE 98 Date: July 11, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014547801 | |||||
SCORE 98 Date: March 12, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52018446101 | |||||
SCORE 98 Date: September 13, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009818001 | |||||
SCORE 98 Date: September 13, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009540501 | |||||
SCORE 98 Date: July 11, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005748301 | |||||
SCORE 98 Date: July 11, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009983901 | |||||
SCORE 98 Date: July 11, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52014546901 | |||||
SCORE 98 Date: July 11, 2013 Contractor: Capital Contr P And H Corp Permit type: Equipment work | Permit status: Permit issued | Permit id: 52005748301 | |||||
SCORE 98 Date: December 6, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006329901 | |||||
SCORE 98 Date: August 31, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010668901 | |||||
SCORE 98 Date: July 1, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006773901 | |||||
SCORE 98 Date: July 19, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52005450102 | |||||
SCORE 98 Date: August 28, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010881001 | |||||
SCORE 98 Date: October 15, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011041501 | |||||
SCORE 98 Date: July 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014343401 | |||||
SCORE 98 Date: July 29, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006116502 | |||||
SCORE 98 Date: September 27, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011055801 | |||||
SCORE 98 Date: July 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50073274502 | |||||
SCORE 98 Date: July 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006338801 | |||||
SCORE 98 Date: February 7, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011581101 | |||||
SCORE 98 Date: July 25, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014756401 | |||||
SCORE 98 Date: August 29, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12104193301 | |||||
SCORE 98 Date: July 29, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006114702 | |||||
SCORE 98 Date: September 28, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006765001 | |||||
SCORE 98 Date: July 23, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50090579102 | |||||
SCORE 98 Date: July 23, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 54002485501 | |||||
SCORE 98 Date: July 23, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006793501 | |||||
SCORE 98 Date: April 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010262901 | |||||
SCORE 98 Date: March 16, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006115601 | |||||
SCORE 98 Date: May 19, 2011 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 51000488901 | |||||
SCORE 98 Date: May 19, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51000717201 | |||||
SCORE 98 Date: March 8, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 42017620401 | |||||
SCORE 98 Date: February 15, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012220601 | |||||
SCORE 98 Date: October 28, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012499001 | |||||
SCORE 98 Date: February 25, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012252701 | |||||
SCORE 98 Date: April 3, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006434102 | |||||
SCORE 98 Date: April 5, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012342901 | |||||
SCORE 98 Date: October 12, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006340401 | |||||
SCORE 98 Date: July 30, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006336001 | |||||
SCORE 98 Date: July 31, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014759101 | |||||
SCORE 98 Date: September 28, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006777601 | |||||
SCORE 98 Date: July 18, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52011442001 | |||||
SCORE 98 Date: November 23, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12255278101 | |||||
SCORE 98 Date: August 16, 2013 Contractor: Capital Contr P And H Corp Permit type: Equipment work | Permit status: Permit issued | Permit id: 52008100901 | |||||
SCORE 98 Date: December 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023641401 | |||||
SCORE 98 Date: October 1, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006513503 | |||||
SCORE 98 Date: July 23, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 50090593302 | |||||
SCORE 98 Date: January 16, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50081708402 | |||||
SCORE 98 Date: December 14, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52003693301 | |||||
SCORE 98 Date: January 14, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004429202 | |||||
SCORE 98 Date: September 4, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12100574002 | |||||
SCORE 98 Date: September 4, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12104193302 | |||||
SCORE 98 Date: October 18, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52008980401 | |||||
SCORE 98 Date: August 22, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014263001 | |||||
SCORE 98 Date: August 22, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014257801 | |||||
SCORE 98 Date: September 12, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52007553302 | |||||
SCORE 98 Date: August 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014896501 | |||||
SCORE 98 Date: December 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52023637001 | |||||
SCORE 98 Date: July 8, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021838101 | |||||
SCORE 98 Date: July 15, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50081848502 | |||||
SCORE 98 Date: September 14, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012082302 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52010419101 | |||||
SCORE 98 Date: September 27, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 32076975301 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50070819303 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011673001 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011518901 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52010419101 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011762201 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012237701 | |||||
SCORE 98 Date: July 17, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012665801 | |||||
SCORE 98 Date: January 16, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50081706602 | |||||
SCORE 98 Date: August 13, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12100574001 | |||||
SCORE 98 Date: August 3, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004165001 | |||||
SCORE 98 Date: March 24, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009837701 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52011762201 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012235901 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52012236801 | |||||
SCORE 98 Date: October 30, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016254601 | |||||
SCORE 98 Date: June 5, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006430502 | |||||
SCORE 98 Date: November 12, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52005867801 | |||||
SCORE 98 Date: November 5, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit reissued | Permit id: 52019852601 | |||||
SCORE 98 Date: January 23, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52021750501 | |||||
SCORE 98 Date: August 5, 2011 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007171501 | |||||
SCORE 98 Date: September 22, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001144201 | |||||
SCORE 98 Date: October 18, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51001091602 | |||||
SCORE 98 Date: November 30, 2015 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32124056301 | |||||
SCORE 98 Date: October 30, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52001144202 | |||||
SCORE 98 Date: September 13, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50070819302 | |||||
SCORE 98 Date: November 4, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014279201 | |||||
SCORE 98 Date: October 24, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016439401 | |||||
SCORE 98 Date: November 12, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52005863201 | |||||
SCORE 98 Date: November 14, 2013 Contractor: Capital Contr P And H Corp Permit type: Plumbing | Permit status: Permit issued | Permit id: 52016503501 | |||||
SCORE 98 Date: November 14, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016552501 | |||||
SCORE 98 Date: November 17, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006507301 | |||||
SCORE 98 Date: July 19, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009989301 | |||||
SCORE 98 Date: December 14, 2012 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 12138194001 | |||||
SCORE 98 Date: March 19, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50062856401 | |||||
SCORE 98 Date: March 19, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50062855501 | |||||
SCORE 98 Date: February 4, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52007576603 | |||||
SCORE 98 Date: February 20, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52018202501 | |||||
SCORE 98 Date: May 2, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52004266802 | |||||
SCORE 98 Date: August 22, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014258701 | |||||
SCORE 98 Date: August 22, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014264901 | |||||
SCORE 98 Date: September 13, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006334201 | |||||
SCORE 98 Date: December 17, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32059478101 | |||||
SCORE 98 Date: March 24, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52009838601 | |||||
SCORE 98 Date: July 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006339701 | |||||
SCORE 98 Date: July 30, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006335101 | |||||
SCORE 98 Date: September 13, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006326201 | |||||
SCORE 98 Date: September 26, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006436901 | |||||
SCORE 98 Date: October 22, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016359001 | |||||
SCORE 98 Date: January 14, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50068993502 | |||||
SCORE 98 Date: February 11, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 32085863901 | |||||
SCORE 98 Date: July 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006337901 | |||||
SCORE 98 Date: May 30, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50068236203 | |||||
SCORE 98 Date: October 2, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006322601 | |||||
SCORE 98 Date: October 2, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006323501 | |||||
SCORE 98 Date: January 29, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52018068801 | |||||
SCORE 98 Date: July 19, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006437801 | |||||
SCORE 98 Date: May 27, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014967901 | |||||
SCORE 98 Date: May 6, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014597701 | |||||
SCORE 98 Date: May 22, 2013 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52006255602 | |||||
SCORE 98 Date: May 22, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006279901 | |||||
SCORE 98 Date: May 22, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006275301 | |||||
SCORE 98 Date: April 22, 2010 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52002871901 | |||||
SCORE 98 Date: June 2, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 51006426101 | |||||
SCORE 98 Date: December 26, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52020919501 | |||||
SCORE 98 Date: May 21, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52000185401 | |||||
SCORE 98 Date: June 17, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52019040901 | |||||
SCORE 98 Date: July 9, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52018475501 | |||||
SCORE 98 Date: July 31, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52014388001 | |||||
SCORE 98 Date: August 12, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52016634701 | |||||
SCORE 98 Date: October 22, 2009 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 50065528501 | |||||
SCORE 98 Date: July 29, 2014 Contractor: Capital Contr P And H Corp Permit status: Permit issued | Permit id: 52019869701 |