Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 4308 Georgia Avenue Nw Washington Dc Inspect and removal/abandoment of water services in public psace. Removal/abandonment of two small water services(1") from 8"w in iowa avenue. Inspect abandonment/removal of two 4" sewer laterals for 12"s in georgia avenue. Client: Busy Services | Permit type: Excavation; sewer se | Permit id: Pa104914 | |||||
SCORE 100 4308 Georgia Avenue Nw Washington Dc Abandon existing water service at main, install 18 linear feet of 2" domestic water service. Abandon existing sewer service, install linear feet of 4" sch pvc with once cleanout for new sewer lateral. Install linear feet of 4" sch pvc with one cleanout for new storm drain lateral. Client: Busy Services | Permit type: Excavation; sewer la | |||||
SCORE 100 17 H Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; install 23lf of 8" replace in place water main with 4" domestic and 4" fire connections with water meter and water meter vault; abandon remove existing water service; attached plans and conditions are part of this permit Date: September 6, 2012 Contractor: Busy Services Permit type: Excavation; repair water main line, excavation; water meter manhole (over 2" pipe), excavation; valves (excavation), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench) | Permit status: Permit expired | Expiration date: September 19, 2012 | Permit id: Pa71572-R1 | |||||
SCORE 100 1728 14th Street Nw Washington Dc Install 13 feet of 12" dip and 35 of 2" copper for fire and domestic services install 22 of 4" sch pvc and 1 cleanout for new sewer line lateral install 18 of 8" sch pvc and 2 manholes for storm drain lateral Date: October 7, 2013 Contractor: Busy Services Permit type: Excavation; sewer lateral connection to 4" (trench), excavation; water lateral conn over 2" pipe (trench), excavation; clean out (sewer), excavation; manhole installation | Permit status: Permit expired | Expiration date: December 5, 2013 | Permit id: Pa82671-R1 | |||||
SCORE 100 1351 H Street Ne Washington Dc Abandon existing domestic service; install 37 linear feet of new 4" fire service and 2" domestic service; install linear feet of new 4" storm lateral Date: May 14, 2014 Contractor: Busy Services Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: July 14, 2014 | Permit id: Pa90598-R1 | |||||
SCORE 100 528 H Street Ne Washington Dc Install 1 1 2'' domestic and 3" fire service; abandon existing water service; install cleanout to sewer alteral and storm drain Date: January 11, 2017 Contractor: Busy Services Permit type: Excavation; water service lateral abandonment | Permit status: Assigned | Expiration date: March 27, 2017 | |||||
SCORE 100 2465 18th Street Nw Washington Dc Excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) Contractor: Busy Services Permit status: 1 | Expiration date: August 24, 2017 | Permit id: 0 | |||||
SCORE 100 528 H Street Ne Washington Dc Install 1 1 2'' domestic and 3" fire service; abandon existing water service; install cleanout to sewer alteral and storm drain Date: June 5, 2017 Contractor: Busy Services Permit type: Excavation; water service lateral abandonment | Permit status: Issued | Expiration date: August 3, 2017 | Permit id: Pa199145-R1 | |||||
SCORE 100 Date: March 1, 2017 Contractor: Busy Services Permit type: Excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) | Permit status: Approved (pending payment | Expiration date: August 24, 2017 | Permit id: 0 | |||||
SCORE 100 Contractor: Busy Services Permit status: Approved (pending payment | Expiration date: August 24, 2017 | Permit id: 0 | |||||
SCORE 100 736 Chesapeake Street Se Washington Dc Refer to approved occupancy permit for permitted hours of work; traffic control plan (tcp) expiration date same as public space permit expiration date; install 4" fire and 1" domestic water service to existing 8" water main; install 4" sanitary sewer lateral to existing 10" sewer main; install 6" storm sewer lateral to existing 18" storm sewer main; abandon remove small water and sewer services; attached plans and conditions are aprt of this permit Date: July 5, 2011 Contractor: Busy Services Permit type: Excavation; water lateral conn over 2" pipe | Permit status: Permit expired | Expiration date: February 27, 2012 | Permit id: Pa63758 | |||||
SCORE 100 1728 14th Street Nw Washington Dc Suspended street - extended restoration may be required; excavate within 14th street nw to cap existing water service excavate within rear alley to proved sewer line abandonment Date: March 20, 2013 Contractor: Busy Services Permit type: Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Permit expired | Expiration date: June 20, 2013 | Permit id: Pa80651 | |||||
SCORE 100 1619 Massachusetts Avenue Nw Washington Dc Install 6" dip fire service into existing 8" water main within 5 of building face; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact sytem inspection oversight division (siod) before permanent restoration of public space at 202-645-70 msut apply and obtain occupancy permit before start of work. Date: April 23, 2010 Contractor: Busy Services Client: Damon Ellis | Permit type: Excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) | Permit status: Permit expired | Expiration date: August 29, 2010 | Permit id: Pa55107 | |||||
SCORE 100 1928 I Street Nw Washington Dc Install 2" domestic water service to existing 12" dip watermain located within the sidewalk; install 4" sanitary sewer service to existing sewer main; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. . Date: July 22, 2010 Contractor: Busy Services Client: Busy Service | Permit type: Excavation; clean out (sewer), excavation; water meter pit (to 2" pipe), excavation; sewer lateral connection over 4" pipe (trench), excavation; water lateral connection to 2" (trench) | Permit status: Permit expired | Expiration date: October 23, 2010 | Permit id: Pa56769 | |||||
SCORE 100 2608 Connecticut Avenue Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; tcp expiration date same as public space permit expiration date; no work in roadway; technology fee paid; "a separate permit will be required if steel plates are utilized"; install 6" storm sewer lateral to existing 18" storm main; install 4" sanitary sewer lateral to existing 12" sewer main; attached plans and conditions are part of this permit; must contact system inspection oversight division before start of work and before permanent restoration of public space at 202-645-7050 Date: November 4, 2010 Contractor: Busy Services Permit type: Excavation; clean out (sewer), excavation; sewer lateral connection over 4" pipe (trench), excavation; storm lateral conn over 4" (trench) | Permit status: Permit expired | Expiration date: June 7, 2011 | Permit id: Pa58434 | |||||
SCORE 100 2612 Connecticut Avenue Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; tcp expiration date same as public space permit expiration date; work is on 24th street; technology fee paid; "a separate permit will be required if steel plates are utilized"; install 4" fire service to existing 8" water main; install 2" domestic water service to existing8" water main; attached plans and conditions are part of this permit; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050 Date: November 4, 2010 Contractor: Busy Services Permit type: Excavation; water meter pit (to 2" pipe), excavation; water lateral connection to 2" (trench) | Permit status: Permit expired | Expiration date: June 7, 2011 | Permit id: Pa58438 | |||||
SCORE 100 731 8th Street Se Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; tcp expiration date same as public space permit expiration date; install 4" dip fire service and 1 1 2" copper domestic service to existing 12" water main; install 4" cleanout to existing 4" sewer line; install new 4" pvc storm drain to existing 15" sewer main; abandon remove exsting 1" water service line; attached plans and conditions are part of this permit; "a separate permit will be required if steel plates are utilized". Date: January 6, 2011 Contractor: Busy Services Permit type: Excavation; clean out | Permit status: Permit expired | Expiration date: August 23, 2011 | Permit id: Pa59335 | |||||
SCORE 100 524 22nd Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; tcp expiration date same as public space permit expiration date; install 2" combination (fire and domestic) water service to existing 6" water main; install new doghouse manhole over existing 8" combination sewer main with 6" sanitary and 6" storm laterals; abandon remove small water and sewer services; attached plans and conditions are part of this permit; please read conditions. Date: February 22, 2011 Contractor: Busy Services Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: September 27, 2011 | Permit id: Pa60242 | |||||
SCORE 100 4308 Georgia Avenue Nw Washington Dc Excavation; sewer lateral connection to 4" (trench), excavation; sewer service lateral abandonment, excavation; clean out (sewer), excavation; storm lateral conn over 4" (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe), excavation; water service lateral abandonment (trench) Date: December 4, 2015 Contractor: Busy Services Permit type: Excavation; sewer lateral connection to 4" | Permit status: Permit expired | Expiration date: April 2, 2016 | Permit id: Pa120050 | |||||
SCORE 100 7 C Street Se Washington Dc Two ea. Connect to existing 8" waterline, install 44 linear feet of 6" dip for domestic and fire services, install one water meter vault: install linear feet of 40pvc, linear feet of trench drain and four drain basins for storm drain ( see attached plan ) Date: February 20, 2016 Contractor: Busy Services Permit type: Excavation; valves | Permit status: Permit expired | Expiration date: May 14, 2016 | Permit id: Pa123521 | |||||
SCORE 100 17 H Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; install 23lf of 8" replace in place water main with 4" domestic and 4" fire connections with water meter and water meter vault; abandon remove existing water service; attached plans and conditions are part of this permit Date: April 26, 2012 Contractor: Busy Services Permit type: Excavation; repair water main line, excavation; water meter manhole (over 2" pipe), excavation; valves (excavation), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench) | Permit status: Permit expired | Expiration date: August 16, 2012 | Permit id: Pa71572 | |||||
SCORE 100 5 Penn Street Ne Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; tcp expiration date same as public space permit expiration date; install 8" water main with 6" fire and 3" domestic water service; install fire hydrant; install 6" sanitary sewer lateral to existing 12" sewer main; attached plans and conditions are part of this permit Date: December 22, 2011 Contractor: Busy Services Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: August 24, 2012 | Permit id: Pa68108 | |||||
SCORE 100 2025 Massachusetts Avenue Nw Washington Dc Excavation; sewer lateral connection to 4" (trench), excavation; sewer service lateral abandonment, excavation; water lateral connection to 2" (trench), excavation; water service lateral abandonment (trench), excavation; clean out (sewer), excavation; water meter pit (to 2" pipe), excavation; manhole installation, excavation; water lateral conn over 2" pipe (trench), excavation; storm lateral conn over 4" (trench) Date: June 12, 2012 Contractor: Busy Services Permit type: Excavation; sewer lateral connection to 4" | Permit status: Permit expired | Expiration date: September 15, 2012 | Permit id: Pa72777 | |||||
SCORE 100 1777 Church Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; install 1" water service to existing 6" water main with water meter; install 4" sanitary and 4" storm sewer lateral to existing 12" sewer main; attached plans and conditions are part of this permit Date: July 11, 2012 Contractor: Busy Services Permit type: Excavation; sewer lateral connection to 4" (trench), excavation; water meter pit (to 2" pipe), excavation; water lateral connection to 2" (trench), excavation; storm lateral conn to 4" (trench) | Permit status: Permit expired | Expiration date: October 27, 2012 | Permit id: Pa73613 | |||||
SCORE 100 1728 14th Street Nw Washington Dc Install 13 feet of 12" dip and 35 of 2" copper for fire and domestic services install 22 of 4" sch pvc and 1 cleanout for new sewer line lateral install 18 of 8" sch pvc and 2 manholes for storm drain lateral Date: May 15, 2013 Contractor: Busy Services Permit type: Excavation; sewer lateral connection to 4" (trench), excavation; water lateral conn over 2" pipe (trench), excavation; clean out (sewer), excavation; manhole installation | Permit status: Permit expired | Expiration date: September 28, 2013 | Permit id: Pa82671 | |||||
SCORE 100 1241 Pennsylvania Avenue Se Washington Dc Excavation; water lateral connection to 2" (trench), excavation; sewer lateral connection to 4" (trench), excavation; water lateral conn over 2" pipe (trench), excavation; water meter pit (to 2" pipe), excavation; water service lateral abandonment (trench), excavation; clean out (sewer) Date: April 17, 2013 Contractor: Busy Services Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: August 22, 2013 | Permit id: Pa81649 | |||||
SCORE 100 1351 H Street Ne Washington Dc Excavation; water lateral connection to 2" (trench), excavation; clean out (sewer), excavation; water lateral conn over 2" pipe (trench), excavation; water meter pit (to 2" pipe), excavation; storm lateral conn to 4" (trench) Date: January 13, 2014 Contractor: Busy Services Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: May 2, 2014 | Permit id: Pa90598 | |||||
SCORE 100 4308 Georgia Avenue Nw Washington Dc Inspect and removal abandoment of water services in public psace. Removal abandonment of two small water services(1") from 8"w in iowa avenue. Inspect abandonment removal of two 4" sewer laterals for 12"s in georgia avenue. Date: January 15, 2015 Contractor: Busy Services Permit type: Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Permit expired | Expiration date: April 9, 2015 | Permit id: Pa104914 | |||||
SCORE 100 528 H Street Ne Washington Dc Excavation; water service lateral abandonment (trench), excavation; clean out (sewer), excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) Date: March 27, 2017 Contractor: Busy Services Permit status: Permit expired | Expiration date: May 19, 2017 | Permit id: Pa199145 | |||||
SCORE 100 2465 18th Street Nw Washington Dc Excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) Date: July 6, 2017 Contractor: Busy Services Permit status: Permit expired | Expiration date: August 24, 2017 | Permit id: Pa201639 | |||||
SCORE 100 1777 Church Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; install 1" water service to existing 6" water main with water meter; install 4" sanitary and 4" storm sewer lateral to existing 12" sewer main; attached plans and conditions are part of this permit Date: July 11, 2012 Contractor: Busy Services Permit type: Excavation; sewer lateral connection to 4" (trench), excavation; water meter pit (to 2" pipe), excavation; water lateral connection to 2" (trench), excavation; storm lateral conn to 4" (trench) | Permit status: Permit expired | Expiration date: October 27, 2012 | Permit id: Pa73613 | |||||
SCORE 100 Date: March 1, 2017 Contractor: Busy Services Permit type: Excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe) | Permit status: Permit expired | Expiration date: August 24, 2017 | Permit id: Pa201639 | |||||
SCORE 100 528 H Street Ne Washington Dc Install 1 1 2'' domestic and 3" fire service; abandon existing water service; install cleanout to sewer alteral and storm drain Date: June 5, 2017 Contractor: Busy Services Permit type: Excavation; water service lateral abandonment | Permit status: Permit expired | Expiration date: August 3, 2017 | Permit id: Pa199145-R1 |