SCORE 95 Permit type: Electrical | Permit status: Application accepted | Expiration date: September 29, 2017 | Current use: Commercial | Permit id: 6554762 | |||||
SCORE 95 Date: September 14, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: September 14, 2017 | Current use: Commercial | Permit id: 6548601 | |||||
SCORE 95 Date: September 28, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: September 28, 2017 | Current use: Commercial | Permit id: 6548599 | |||||
SCORE 95 403 Belmont Ave E Seattle Wa Days get started for branch circuits only. Plan review done under permit #6543169 Date: June 28, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 22, 2016 | Expiration date: July 28, 2016 | Current use: Multifamily | Permit id: 6543171 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit issued | Expiration date: August 22, 2017 | Current use: Multifamily | Permit id: 6542091 | |||||
SCORE 95 Date: June 7, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 8, 2016 | Expiration date: September 7, 2016 | Current use: Multifamily | Permit id: 6539057 | |||||
SCORE 95 Date: May 18, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2016 | Expiration date: May 18, 2017 | Current use: Multifamily | Permit id: 6535662 | |||||
SCORE 95 Date: May 18, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 18, 2016 | Expiration date: May 18, 2017 | Current use: Multifamily | Permit id: 6535667 | |||||
SCORE 95 12 E Pike St Seattle Wa Install (2) 2 amp service (for possible future development) three phase panels, connect two hvac systems, one sign circuit (suite a) (okay per dr - approx 10 sq. Ft. Subject to field inspection) Date: March 2, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2016 | Expiration date: March 2, 2017 | Current use: Commercial | Permit id: 6521918 | |||||
SCORE 95 12 E Pike St Seattle Wa Install (1) 2 amp three phase panels, connect (1) havac systems, one sign circuit in suite b. Date: March 2, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2016 | Expiration date: March 2, 2017 | Current use: Commercial | Permit id: 6521926 | |||||
SCORE 95 531 Queen Anne Ave N Seattle Wa Day get started to be on site for fire alarm only - plan review under 6509464. Assoc bldg permit 6352578. Date: December 14, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 30, 2016 | Expiration date: January 14, 2016 | Current use: Commercial | Permit id: 6509466 | |||||
SCORE 95 531 Queen Anne Ave N Seattle Wa Install new fire alarm & fire fighter phone systems; assoc bldg permit 6352578. Date: February 11, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 21, 2016 | Expiration date: February 11, 2017 | Current use: Commercial | Permit id: 6509464 | |||||
SCORE 95 Date: August 26, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 13, 2015 | Expiration date: August 25, 2016 | Current use: Single family / duplex | Permit id: 6491664 | |||||
SCORE 95 Date: July 30, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 14, 2015 | Expiration date: July 29, 2016 | Current use: Commercial | Permit id: 6487180 | |||||
SCORE 95 Date: May 18, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: May 18, 2016 | Current use: Multifamily | Permit id: 6474633 | |||||
SCORE 95 Date: October 27, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: January 8, 2015 | Expiration date: January 27, 2015 | Current use: Multifamily | Permit id: 6443311 | |||||
SCORE 95 2301 S Jackson St Seattle Wa Inspecter requires meter to be inspected in order for power to be energized Date: October 27, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 29, 2014 | Expiration date: October 27, 2015 | Current use: Commercial | Permit id: 6443268 | |||||
SCORE 95 Date: January 16, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 12, 2015 | Expiration date: January 16, 2016 | Current use: Commercial | Permit id: 6441487 | |||||
SCORE 95 8 Ne 67th St Seattle Wa (3) 2 amp temp power only drops on the same property all to be inspected on the same trip; for crane use - okay per tim rasmussen. Assoc bldg permit 6391699 Date: September 19, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: November 6, 2014 | Expiration date: September 19, 2015 | Current use: Multifamily | Permit id: 6437476 | |||||
SCORE 95 8 Ne 67th St Seattle Wa (3) 2 amp temp power only drops on the same property all to be inspected on the same trip; if not they need separate permits - okay per tim rasmussen. Assoc bldg permit 6391699 Date: July 28, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 29, 2014 | Expiration date: July 28, 2015 | Current use: Multifamily | Permit id: 6420916 | |||||
SCORE 95 Date: June 20, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 23, 2014 | Expiration date: June 20, 2015 | Current use: Commercial | Permit id: 6423669 | |||||
SCORE 95 Date: June 3, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 12, 2014 | Expiration date: June 3, 2015 | Current use: Commercial | Permit id: 6420922 | |||||
SCORE 95 Date: April 24, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2014 | Expiration date: April 24, 2015 | Current use: Commercial | Permit id: 6414846 | |||||
SCORE 95 Date: April 24, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 28, 2015 | Expiration date: April 24, 2015 | Current use: Commercial | Permit id: 6414639 | |||||
SCORE 95 Date: April 23, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: May 2, 2014 | Expiration date: April 23, 2015 | Current use: Commercial | Permit id: 6414603 | |||||
SCORE 95 Date: April 11, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: April 16, 2014 | Expiration date: April 11, 2015 | Current use: Multifamily | Permit id: 6412919 | |||||
SCORE 95 Date: March 31, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: April 9, 2014 | Expiration date: March 31, 2015 | Current use: Multifamily | Permit id: 6410985 | |||||
SCORE 95 Date: March 5, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 13, 2014 | Expiration date: March 5, 2015 | Current use: Commercial | Permit id: 6407022 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit closed | Completion date: October 14, 2014 | Expiration date: January 22, 2015 | Current use: Multifamily | Permit id: 6384777 | |||||
SCORE 95 Date: September 8, 2010 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 3, 2010 | Expiration date: September 8, 2011 | Current use: Single family / duplex | Permit id: 6260212 | |||||
SCORE 95 Date: December 7, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2011 | Expiration date: December 7, 2010 | Current use: Commercial | Permit id: 6235015 | |||||
SCORE 95 Date: October 2, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 30, 2009 | Expiration date: October 2, 2010 | Current use: Commercial | Permit id: 6228952 | |||||
SCORE 95 57 24th Ave Nw Seattle Wa Install new fire alarm - joint venture between boone electric & hawks electric Date: August 19, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 12, 2012 | Expiration date: August 19, 2010 | Current use: Commercial | Permit id: 6221362 | |||||
SCORE 95 Date: June 19, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 23, 2009 | Expiration date: June 19, 2010 | Current use: Commercial | Permit id: 6219241 | |||||
SCORE 95 Date: June 24, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2010 | Expiration date: June 24, 2010 | Current use: Commercial | Permit id: 6219116 | |||||
SCORE 95 Date: March 12, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: January 12, 2010 | Expiration date: March 12, 2010 | Current use: Single family / duplex | Permit id: 6208616 | |||||
SCORE 95 Date: March 12, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 23, 2009 | Expiration date: March 12, 2010 | Current use: Single family / duplex | Permit id: 6210592 | |||||
SCORE 95 Date: March 5, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 29, 2009 | Expiration date: April 5, 2009 | Current use: Commercial | Permit id: 6210001 | |||||
SCORE 95 Date: March 24, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 29, 2009 | Expiration date: March 24, 2010 | Current use: Commercial | Permit id: 6210000 | |||||
SCORE 95 Date: January 7, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: January 15, 2009 | Expiration date: January 7, 2010 | Current use: Single family / duplex | Permit id: 6205045 | |||||
SCORE 95 Date: January 23, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 9, 2010 | Expiration date: January 23, 2010 | Current use: Commercial | Permit id: 6202443 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit closed | Completion date: February 3, 2010 | Expiration date: February 25, 2010 | Current use: Multifamily | Permit id: 6200668 | |||||
SCORE 95 Date: October 1, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 8, 2008 | Expiration date: October 1, 2009 | Current use: Multifamily | Permit id: 6196347 | |||||
SCORE 95 Date: June 30, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: July 8, 2008 | Expiration date: June 30, 2009 | Current use: Multifamily | Permit id: 6186111 | |||||
SCORE 95 Date: November 28, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: December 26, 2007 | Expiration date: December 28, 2007 | Current use: Commercial | Permit id: 6162488 | |||||
SCORE 95 Date: February 14, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2008 | Expiration date: February 14, 2009 | Current use: Commercial | Permit id: 6159615 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit finaled | Completion date: August 16, 2007 | Expiration date: August 7, 2008 | Current use: Commercial | Permit id: 6148918 | |||||
SCORE 95 4214 Stone Way N Seattle Wa Concrete encased electrode grounding for construction of mixed use bldg; construction permit 6094607 Date: July 23, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: July 24, 2007 | Expiration date: October 23, 2007 | Current use: Commercial | Permit id: 6147464 | |||||
SCORE 95 Date: July 20, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: March 12, 2008 | Expiration date: July 19, 2008 | Current use: Commercial | Permit id: 6147272 | |||||
SCORE 95 Date: May 18, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: May 22, 2007 | Expiration date: May 17, 2008 | Current use: Commercial | Permit id: 6139940 | |||||
SCORE 95 Date: April 26, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: July 19, 2007 | Expiration date: May 26, 2007 | Current use: Commercial | Permit id: 6137308 | |||||
SCORE 95 Date: March 7, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: March 9, 2007 | Expiration date: March 6, 2008 | Current use: Multifamily | Permit id: 6131428 | |||||
SCORE 95 Date: September 21, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: December 21, 2006 | Expiration date: September 21, 2007 | Current use: Single family / duplex | Permit id: 6113534 | |||||
SCORE 95 Date: August 18, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 2, 2006 | Expiration date: August 18, 2007 | Current use: Multifamily | Permit id: 6109818 | |||||
SCORE 95 Date: August 16, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: August 23, 2006 | Expiration date: August 16, 2007 | Current use: Single family / duplex | Permit id: 6109612 | |||||
SCORE 95 Date: July 28, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: August 4, 2006 | Expiration date: July 28, 2007 | Current use: Multifamily | Permit id: 6107468 | |||||
SCORE 95 Date: June 26, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 30, 2006 | Expiration date: June 26, 2007 | Current use: Multifamily | Permit id: 6103682 | |||||
SCORE 95 Date: May 25, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 2, 2007 | Expiration date: May 25, 2007 | Current use: Single family / duplex | Permit id: 6099888 | |||||
SCORE 95 Date: April 21, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Expiration date: April 21, 2007 | Current use: Multifamily | Permit id: 6095915 | |||||
SCORE 95 Date: March 31, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 7, 2006 | Expiration date: March 31, 2007 | Current use: Commercial | Permit id: 6093478 | |||||
SCORE 95 Date: February 14, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: February 15, 2006 | Expiration date: February 14, 2007 | Current use: Commercial | Permit id: 6088274 | |||||
SCORE 95 Date: January 12, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: January 17, 2006 | Expiration date: January 12, 2007 | Current use: Commercial | Permit id: 6084916 | |||||
SCORE 95 Date: January 3, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: November 13, 2006 | Expiration date: January 3, 2007 | Current use: Single family / duplex | Permit id: 6083788 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit finaled | Completion date: December 13, 2005 | Expiration date: November 21, 2006 | Current use: Commercial | Permit id: 6078896 | |||||
SCORE 95 Date: October 26, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 27, 2005 | Expiration date: October 26, 2006 | Current use: Commercial | Permit id: 6077105 | |||||
SCORE 95 Date: October 24, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: December 12, 2006 | Expiration date: October 24, 2006 | Current use: Commercial | Permit id: 6076819 | |||||
SCORE 95 Date: October 14, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 19, 2005 | Expiration date: October 14, 2006 | Current use: Commercial | Permit id: 6073908 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit finaled | Completion date: October 26, 2005 | Expiration date: September 27, 2006 | Current use: Commercial | Permit id: 6073746 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit finaled | Completion date: January 24, 2006 | Expiration date: October 17, 2006 | Current use: Commercial | Permit id: 6072332 | |||||
SCORE 95 Date: August 23, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 14, 2005 | Expiration date: August 23, 2006 | Current use: Single family / duplex | Permit id: 6070144 | |||||
SCORE 95 Date: August 12, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: August 16, 2005 | Expiration date: August 12, 2006 | Current use: Commercial | Permit id: 6069116 | |||||
SCORE 95 Date: April 13, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 13, 2005 | Expiration date: April 13, 2006 | Current use: Single family / duplex | Permit id: 6055588 | |||||
SCORE 95 Date: April 13, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 13, 2005 | Expiration date: April 13, 2006 | Current use: Single family / duplex | Permit id: 6055591 | |||||
SCORE 95 Date: April 13, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 13, 2005 | Expiration date: April 13, 2006 | Current use: Single family / duplex | Permit id: 6055583 | |||||
SCORE 95 Date: March 2, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 30, 2005 | Expiration date: March 2, 2006 | Current use: Commercial | Permit id: 6052953 | |||||
SCORE 95 43 Sw Southern St Seattle Wa Underground conduit for (3) houses; (1) cover inspection approved by bob mccormick Date: November 15, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: May 6, 2005 | Expiration date: November 15, 2005 | Current use: Single family / duplex | Permit id: 6046667 | |||||
SCORE 95 Date: November 5, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 22, 2005 | Expiration date: November 5, 2005 | Current use: Single family / duplex | Permit id: 6046132 | |||||
SCORE 95 Date: September 29, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 19, 2004 | Expiration date: September 29, 2005 | Current use: Single family / duplex | Permit id: 6043418 | |||||
SCORE 95 Date: August 19, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: September 13, 2004 | Expiration date: August 19, 2005 | Current use: Commercial | Permit id: 6040988 | |||||
SCORE 95 Date: July 30, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 28, 2005 | Expiration date: July 30, 2005 | Current use: Multifamily | Permit id: 6039731 | |||||
SCORE 95 Date: July 7, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 22, 2005 | Expiration date: July 7, 2005 | Current use: Multifamily | Permit id: 6038273 | |||||
SCORE 95 Date: March 11, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 5, 2004 | Expiration date: March 11, 2005 | Current use: Commercial | Permit id: 6031621 | |||||
SCORE 95 Date: March 5, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 6, 2004 | Expiration date: March 5, 2005 | Current use: Single family / duplex | Permit id: 6029101 | |||||
SCORE 95 Date: September 30, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 22, 2003 | Expiration date: September 30, 2004 | Current use: Multifamily | Permit id: 6022844 | |||||
SCORE 95 Date: September 19, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: February 10, 2004 | Expiration date: September 19, 2004 | Current use: Commercial | Permit id: 6022356 | |||||
SCORE 95 Date: September 23, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: February 10, 2004 | Expiration date: September 23, 2004 | Current use: Commercial | Permit id: 6022355 | |||||
SCORE 95 Date: August 13, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 28, 2006 | Expiration date: August 13, 2004 | Current use: Multifamily | Permit id: 6020243 | |||||
SCORE 95 Date: March 19, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: August 11, 2003 | Expiration date: March 19, 2004 | Current use: Multifamily | Permit id: 6012602 | |||||
SCORE 95 Date: March 19, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 8, 2003 | Expiration date: March 19, 2004 | Current use: Commercial | Permit id: 6012571 | |||||
SCORE 95 Date: March 6, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: March 7, 2003 | Expiration date: March 6, 2004 | Current use: Multifamily | Permit id: 6011935 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit finaled | Completion date: July 29, 2003 | Expiration date: March 25, 2004 | Current use: Multifamily | Permit id: 6011202 | |||||
SCORE 95 Date: February 6, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: February 19, 2003 | Expiration date: February 6, 2004 | Current use: Single family / duplex | Permit id: 6010521 | |||||
SCORE 95 Date: January 8, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: August 8, 2003 | Expiration date: January 8, 2004 | Current use: Commercial | Permit id: 6008001 | |||||
SCORE 95 Date: November 26, 2002 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: December 23, 2002 | Expiration date: November 26, 2003 | Current use: Commercial | Permit id: 6007450 | |||||
SCORE 95 Date: October 30, 2002 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: November 14, 2002 | Expiration date: October 30, 2003 | Current use: Multifamily | Permit id: 6006153 | |||||
SCORE 95 7116 Greenwood Ave N Seattle Wa Island video tenant improvement (original tenant build out comply with 1997 energy code) -light summary ok by kkh Date: September 24, 2002 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: November 12, 2002 | Expiration date: September 24, 2003 | Current use: Commercial | Permit id: 6004264 | |||||
SCORE 95 Date: July 16, 2002 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: September 17, 2002 | Expiration date: July 16, 2003 | Current use: Single family / duplex | Permit id: 6001085 | |||||
SCORE 95 4214 Stone Way N Seattle Wa Day "branch wiring only" get started permit for a p #6144853 - no distribution center, service feeder work covered under this permit per bob mccormick Date: June 28, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: September 7, 2007 | Expiration date: July 28, 2007 | Current use: Commercial | Permit id: 6144854 | |||||
SCORE 95 Date: October 28, 2010 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: November 1, 2010 | Expiration date: October 28, 2011 | Current use: Single family / duplex | Permit id: 6265187 | |||||
SCORE 95 12 E Pike St Seattle Wa Wire new mixed use apartment building; 30 amp service. 8/13/14, ec, revision. Ndm 12/8/14 revision submitted for 600amp main distribution panel. No change in job value. Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2015 | Expiration date: September 23, 2015 | Current use: Multifamily | Permit id: 6417706 | |||||
SCORE 95 12 E Pike St Seattle Wa Day get started for branch circuits only; plan review under 6417706. 6/18/14 laus (6/18/14 laus ... Ext. To 6/30/14 while under review)7/9/14 rrj extended to 7/30/14 Date: May 13, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2014 | Expiration date: July 30, 2015 | Current use: Multifamily | Permit id: 6417709 | |||||
SCORE 95 721 E Pine St Seattle Wa Day get started for branch circuits only plan review done under 6425788 extended to 10/22/14 rrj Date: July 3, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 22, 2014 | Expiration date: October 22, 2014 | Current use: Multifamily | Permit id: 6425796 | |||||
SCORE 95 721 E Pine St Seattle Wa Electrical work for new ti to install new electrical system; mixed use. 2/12/15 jcb; revisions submitted for fire pump addition; increase in job value 6500. 00. 7/13/15 sk revisions job value increased 12000. 00 Permit type: Electrical | Permit status: Permit closed | Completion date: July 31, 2015 | Expiration date: October 22, 2015 | Current use: Multifamily | Permit id: 6425788 | |||||
SCORE 95 8 Ne 67th St Seattle Wa (3) 2 amp temp power only drops on the same property all to be inspected on the same trip; if not they need separate permits - okay per tim rasmussen. Assoc bldg permit 6391699 8/6/14 tr this is for one temp power pole. Date: August 4, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 6, 2014 | Expiration date: August 4, 2015 | Current use: Multifamily | Permit id: 6430255 | |||||
SCORE 95 721 E Pine St Seattle Wa Install new fire alarm system; this is a joint venture w/ boone electric & linx integrated. Date: September 29, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 22, 2015 | Expiration date: September 29, 2015 | Current use: Commercial | Permit id: 6434540 | |||||
SCORE 95 605 15th Ave E Seattle Wa Day get started to witness conduit and for branch circuits only; plan review under 6440423 for [stream fifteen]. Assoc bldg permit #6391814. Sk 10/9/14 change address from 8 ne 67th st. To 605 15th ave e. 11-5-14 dwr extended get started for more days Date: October 8, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2014 | Expiration date: December 8, 2014 | Current use: Multifamily | Permit id: 6440424 | |||||
SCORE 95 605 15th Ave E Seattle Wa Inspection only/ufer - closed without final inspection, no known life safety issuesufer ground (associated permit 6391814). Date: October 15, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Expiration date: January 15, 2015 | Current use: Commercial | Permit id: 6441488 | |||||
SCORE 95 8 Ne 67th St Seattle Wa Closed - parent permit issued day get started for branch circuits only, plan review permit under 6443307. Extended to 1/22/15 rrj Date: October 27, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Expiration date: January 22, 2015 | Current use: Multifamily | Permit id: 6443310 | |||||
SCORE 95 132 Linden Ave N Seattle Wa 4 amp remporary power on north west corner of lot. 10 20 2016 paf address change from 13281 aurora ave n Permit type: Electrical | Permit status: Permit issued | Expiration date: October 31, 2017 | Current use: Commercial | Permit id: 6554762 | |||||
SCORE 95 Date: November 9, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: November 9, 2017 | Current use: Commercial | Permit id: 6566328 | |||||
SCORE 95 Date: November 9, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: November 16, 2016 | Expiration date: November 9, 2017 | Current use: Commercial | Permit id: 6566339 | |||||
SCORE 95 Date: November 9, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: November 18, 2016 | Expiration date: November 9, 2017 | Current use: Commercial | Permit id: 6566347 | |||||
SCORE 95 Permit type: Electrical | Permit status: Application accepted | Current use: Commercial | Permit id: 6576666 | |||||
SCORE 95 13281 Aurora Ave N Seattle Wa Day get started for branch circuits only. Plan review permit under 6576666. Date: January 18, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: February 18, 2017 | Current use: Commercial | Permit id: 6576668 | |||||
SCORE 95 Date: May 29, 2014 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: May 29, 2015 | Current use: Multifamily | Permit id: 6420170 | |||||
SCORE 95 Date: April 25, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 12, 2006 | Expiration date: May 25, 2006 | Current use: Commercial | Permit id: 6096201 | |||||
SCORE 95 6015 Phinney Ave N Seattle Wa Tenant improvement: install lights, switches, receptacles, and kitchen equiptment. Tenant improvement of less than 25 sq ft: add 2 amp subpanel. Date: February 25, 2005 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 30, 2005 | Expiration date: February 25, 2006 | Current use: Commercial | Permit id: 6052706 | |||||
SCORE 95 Date: June 9, 2010 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: November 3, 2010 | Expiration date: June 9, 2011 | Current use: Single family / duplex | Permit id: 6251396 | |||||
SCORE 95 1216 S Hill St Seattle Wa Structured cabling installation, audio installatin, and security system install. 7/2/09 mvc: renew for final inspection Date: October 29, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2009 | Expiration date: October 28, 2009 | Current use: Single family / duplex | Permit id: 6159065 | |||||
SCORE 95 2233 1st Ave Seattle Wa Install fire alarm system. Joint venture with custom electronics. 1/14/ bew renewal. 2/7/13 jcb; renew this time only per rich meell, expired in 2010. Date: February 14, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: February 13, 2013 | Expiration date: October 22, 2013 | Current use: Commercial | Permit id: 6159616 | |||||
SCORE 95 4214 Stone Way N Seattle Wa Core/shell and build out of new mixed use bldg - to include low voltage wiring for phone, tv, intercom & camera per plans. Ref #6094607 Permit type: Electrical | Permit status: Permit closed | Completion date: August 15, 2008 | Expiration date: September 10, 2008 | Current use: Commercial | Permit id: 6144853 | |||||
SCORE 95 1623 Bellevue Ave Seattle Wa 2 amp temp power for new construction; bldg permit #6169593, demo #6203382. 4 4 2012 jnl - about to expire letter mailed Date: April 25, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2012 | Expiration date: April 25, 2012 | Current use: Commercial | Permit id: 6281224 | |||||
SCORE 95 132 Linden Ave N Seattle Wa Day get started to be on site for fire alarm only, plan review permit under # #6588705 Date: April 13, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: May 13, 2017 | Current use: Commercial | Permit id: 6590406 | |||||
SCORE 95 Date: February 1, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: February 15, 2017 | Expiration date: February 1, 2018 | Current use: Commercial | Permit id: 6579200 | |||||
SCORE 95 531 Queen Anne Ave N Seattle Wa Install 2 amp temp feeder only; issued demo permit 6439526 / bldg permit (not yet issued) 6481236. 8/27/15 hkh; add 200a temp service Date: July 28, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 21, 2016 | Expiration date: July 28, 2016 | Current use: Commercial | Permit id: 6486733 | |||||
SCORE 95 403 Belmont Ave E Seattle Wa 12 amp service for new 47 unit aprtment building, per plan. 10 11 16 cpg applicant submitted a revision for new power pump 5 5 2017 trp revision to change voltage for elevator Permit type: Electrical | Permit status: Permit issued | Expiration date: August 16, 2017 | Current use: Multifamily | Permit id: 6543169 | |||||
SCORE 95 Date: June 27, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2017 | Expiration date: June 27, 2018 | Current use: Commercial | Permit id: 6605154 | |||||
SCORE 95 Date: August 18, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: September 25, 2017 | Expiration date: August 18, 2018 | Current use: Commercial | Permit id: 6614212 | |||||
SCORE 95 1601 N 45th St Seattle Wa Day get started to be on site for fire alarm only, plan review under 6592241 Date: May 5, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: September 25, 2017 | Expiration date: June 5, 2017 | Current use: Commercial | Permit id: 6595618 | |||||
SCORE 95 531 Queen Anne Ave N Seattle Wa Day get started to witness conduit and for branch circuits only; plan review under 6493975. 10-5-15 dwr extend get started for more days till 11-9-15. 10/7/15 jle changed parent to 6474221 Date: September 9, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: November 16, 2015 | Expiration date: November 9, 2015 | Current use: Commercial | Permit id: 6493976 | |||||
SCORE 95 Date: July 26, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 1, 2017 | Expiration date: July 26, 2018 | Current use: Commercial | Permit id: 6609894 | |||||
SCORE 95 1222 Ne 65th St Seattle Wa Install electrical for mixed use building 12 8 17 mwb: update primary from linx integrated to boone electric per j saldana Permit type: Electrical | Permit status: Permit issued | Expiration date: November 30, 2018 | Current use: Commercial | Permit id: 6620298 | |||||
SCORE 95 Date: February 7, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 13, 2017 | Expiration date: March 7, 2017 | Current use: Commercial | Permit id: 6580013 | |||||
SCORE 95 Date: August 17, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 23, 2017 | Expiration date: August 17, 2018 | Current use: Commercial | Permit id: 6613950 | |||||
SCORE 95 Date: August 17, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2017 | Expiration date: August 17, 2018 | Current use: Commercial | Permit id: 6613967 | |||||
SCORE 95 Date: April 17, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: May 30, 2017 | Expiration date: April 17, 2018 | Current use: Commercial | Permit id: 6592125 | |||||
SCORE 95 8 Ne 67th St Seattle Wa New 2 unit apartment building. 5/18/15 jcb; revision submitted for changes in the main service gear, going from 3 to 2, no change in job value. 9/4/15 hkh; revision submitted for changes. Remove 200a breaker and increase 600a to 800a breaker in mds increase ms-p1e from 600a to 800a, no change in job value. Permit type: Electrical | Permit status: Permit closed | Completion date: May 17, 2016 | Expiration date: January 29, 2016 | Current use: Multifamily | Permit id: 6443307 | |||||
SCORE 95 605 15th Ave E Seattle Wa Wire new mixed use bldg [stream fifteen]; assoc bldg permit #6391814 (11-12-14 dwr corrected bldg permit number). Sk 10/9/14 change address from 8 ne 67th st. To 605 15th ave e. 7/16/15 jle add 100amp service for fire pump increase value of 3000. 00 Permit type: Electrical | Permit status: Permit closed | Completion date: October 15, 2015 | Expiration date: December 16, 2015 | Current use: Multifamily | Permit id: 6440423 | |||||
SCORE 95 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Ready for intake | Current use: Single family / duplex | Permit id: 6311077 | |||||
SCORE 95 4528 44th Ave Sw Seattle Wa Days get started for branch circuits only. Plan review done under permit #6542091 7/27 2016 m. Lee, extend to 8/27/16, Date: June 22, 2016 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 22, 2016 | Expiration date: August 27, 2016 | Current use: Multifamily | Permit id: 6542120 | |||||
SCORE 95 3206 Harvard Ave E Seattle Wa Day get started to be on site for branch circuits only, plan review permit under #649798010-21-15 dwr extended get started for more days till 12-2-15. Date: October 2, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 8, 2015 | Expiration date: December 2, 2015 | Current use: Multifamily | Permit id: 6497983 | |||||
SCORE 95 3206 Harvard Ave E Seattle Wa 2 amp temp power only; issued demo permit 6431502 / not yet issued bldg permit 6428629. Date: May 18, 2015 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 10, 2015 | Expiration date: May 18, 2016 | Current use: Multifamily | Permit id: 6474631 | |||||
SCORE 95 Date: March 3, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 22, 2017 | Expiration date: March 3, 2018 | Current use: Commercial | Permit id: 6584177 | |||||
SCORE 95 132 Linden Ave N Seattle Wa Day get started for branch circuits only. Plan review permit under 6576666. 2 22 17,jas-extended until 3 18 17 3-23-17 dwr extedded till 4-30-17. 04 11 17 jk extended to expire on 05 12 17. 05 04 17 jk extended to expire on 05 19 17. Date: January 18, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: June 2, 2017 | Current use: Commercial | Permit id: 6576668 | |||||
SCORE 95 2037 Yale Ave E Seattle Wa Day get started permit for brach circuits only, plan review under permit 6615474 Date: August 31, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: September 30, 2017 | Current use: Multifamily | Permit id: 6616540 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit issued | Expiration date: June 13, 2018 | Current use: Commercial | Permit id: 6576666 | |||||
SCORE 95 Date: October 27, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 31, 2011 | Expiration date: January 27, 2012 | Current use: Multifamily | Permit id: 6300222 | |||||
SCORE 95 4455 7th Ave S Seattle Wa Replacing controllers on (4) circuits. 11 4 2011 bew added (6) 15-25 amp feeders (indust. Control panels) & (6) light fixtures Date: October 14, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: November 8, 2011 | Expiration date: October 14, 2012 | Current use: Commercial | Permit id: 6298722 | |||||
SCORE 95 2038 Nw Market St Seattle Wa Wiring for circuits for new tenant. 11 1 2011 bew address changed from 2032 nw market st Date: October 12, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2011 | Expiration date: October 12, 2012 | Current use: Commercial | Permit id: 6298561 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit closed | Completion date: October 17, 2011 | Expiration date: October 12, 2012 | Current use: Commercial | Permit id: 6298563 | |||||
SCORE 95 1312 N 39th St Seattle Wa Cancel per customer log 12-715200a service change9 21 2012 jnl - about to expire letter mailed Date: September 7, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: September 6, 2012 | Current use: Single family / duplex | Permit id: 6294746 | |||||
SCORE 95 5618 Sw Admiral Way Seattle Wa Lights, switches9 7 11 mvc: adding 3 lights, 2 receptacles & 1 range outlet. Date: August 24, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 9, 2012 | Expiration date: August 24, 2012 | Current use: Single family / duplex | Permit id: 6293568 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit closed | Completion date: August 19, 2011 | Expiration date: August 5, 2012 | Current use: Commercial | Permit id: 6287655 | |||||
SCORE 95 1903 17th Ave S Seattle Wa Fire restoration - altered repaired circuits8 10 11 mvc: adding 200a service. 6 21 2012 jnl - about to expire letter mailed Date: July 20, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 9, 2012 | Expiration date: July 19, 2012 | Current use: Single family / duplex | Permit id: 6289788 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2012 | Expiration date: July 19, 2012 | Current use: Commercial | Permit id: 6286760 | |||||
SCORE 95 531 Queen Anne Ave N Seattle Wa Cancel per customer log 15-1633 new 25 amp service to serve new mixed use building. Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2016 | Expiration date: August 31, 2017 | Current use: Commercial | Permit id: 6493975 | |||||
SCORE 95 1623 Bellevue Ave Seattle Wa Day get started for branch ckts only; okay per tim porter. Plan review under #6286760. Date: June 20, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 19, 2011 | Expiration date: July 20, 2011 | Current use: Commercial | Permit id: 6286761 | |||||
SCORE 95 77 34th Ave Sw Seattle Wa Day get started for u g conduits for portables at westside school pending plans 6287655. Authorized by mark gibbs Date: June 28, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2011 | Expiration date: July 28, 2011 | Current use: Commercial | Permit id: 6287656 | |||||
SCORE 95 2607 2nd Ave Seattle Wa Replace 40a air conditioner circuits. 6 14 11 jcb; address changed from 2633 eastlake av e. Date: June 15, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: September 9, 2011 | Expiration date: June 15, 2012 | Current use: Commercial | Permit id: 6285967 | |||||
SCORE 95 Date: May 26, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: May 27, 2011 | Expiration date: August 26, 2011 | Current use: Single family / duplex | Permit id: 6284421 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit issued | Completion date: July 6, 2017 | Expiration date: December 8, 2016 | Current use: Multifamily | Permit id: 6497980 | |||||
SCORE 95 Date: September 28, 2017 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: September 28, 2018 | Current use: Commercial | Permit id: 6621513 | |||||
SCORE 95 Date: April 14, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2011 | Expiration date: April 14, 2012 | Current use: Single family / duplex | Permit id: 6280128 | |||||
SCORE 95 6921 Roosevelt Way Ne Seattle Wa Electrical for 71 unit apartment complex. 10 09 2017 smr revision (no value change). 10-17-17 bz approved revision Permit type: Electrical | Permit status: Permit issued | Expiration date: March 13, 2018 | Current use: Commercial | Permit id: 6580011 | |||||
SCORE 95 39 Stone Way N Seattle Wa Wiring of new construction of a 5-story mixed occupancy bldg with apts bldg a p # 61122 2005 nec applies. 4 28 11 jcb; revision submitted to change service conductors from conduit and wire to busway, no change in job value, review waived per bob johnson. 10 31 11 mvc: revision = electrical room revised Permit type: Electrical | Permit status: Permit closed | Completion date: June 25, 2012 | Expiration date: March 22, 2012 | Current use: Commercial | Permit id: 6267405 | |||||
SCORE 95 Date: March 17, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2011 | Expiration date: March 17, 2012 | Current use: Single family / duplex | Permit id: 6277427 | |||||
SCORE 95 517 Union St Seattle Wa Closed as incompletewiring for ti of office space; construction permit 6072723. 10 25 06 jnl - about to expire letter sent Permit type: Electrical | Permit status: Permit closed | Expiration date: November 9, 2006 | Current use: Commercial | Permit id: 6077618 | |||||
SCORE 95 11332 Lake City Way Ne Seattle Wa Office addition & relocation of service 9 18 03 mvc: revision add ats 4 a main. Permit type: Electrical | Permit status: Permit finaled | Completion date: May 21, 2004 | Expiration date: August 25, 2004 | Current use: Commercial | Permit id: 6019974 | |||||
SCORE 95 1611 8th Ave N Seattle Wa Wire new mixed use bldg - ref #752828 8 10 07me-about to expire letter sent- 10 16 2007-trp-changed expiration date 11 8 07 jsbm - submitted revision no change to work value contact: 253-820-3086 Permit type: Electrical | Permit status: Permit finaled | Completion date: March 13, 2008 | Expiration date: September 7, 2008 | Current use: Multifamily | Permit id: 6096197 | |||||
SCORE 95 Date: March 14, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit issued | Expiration date: March 14, 2009 | Current use: Commercial | Permit id: 6173704 | |||||
SCORE 95 Date: July 6, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: June 25, 2012 | Expiration date: July 6, 2012 | Current use: Commercial | Permit id: 6282250 | |||||
SCORE 95 Date: March 11, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 28, 2005 | Expiration date: March 11, 2005 | Current use: Multifamily | Permit id: 6029100 | |||||
SCORE 95 401 Ne Northgate Way Seattle Wa Tenant improvement space 511a 4 16 04 mvc: adding 100a main breaker panel. Date: March 4, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 20, 2004 | Expiration date: March 4, 2005 | Current use: Commercial | Permit id: 6031182 | |||||
SCORE 95 222 Queen Anne Ave N Seattle Wa Install access control, phone, tv ,7 10 09 m. Lee, 10 23 09 mvc: contractor request renewal Date: November 14, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 5, 2010 | Expiration date: November 14, 2010 | Current use: Commercial | Permit id: 6201006 | |||||
SCORE 95 39 Stone Way N Seattle Wa 6 amp temp power for construction of multi-family; retail structure; restaurant live work units; bldg permit 6155610 Permit type: Electrical | Permit status: Permit closed | Completion date: August 23, 2012 | Expiration date: January 28, 2012 | Current use: Commercial | Permit id: 6272985 | |||||
SCORE 95 2233 1st Ave Seattle Wa Install fire alarm. 1 6 09 mvc: renew per contractors request. 7 10 09 bew reinstated permit and changed scope of work to lv communications systems and modified devices. 7 16 09 bew adddress correction from 2233 1st av s. 1 14 bew renewed 1 4 2011 jnl - about to expire letter sent Date: January 15, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: February 13, 2013 | Expiration date: January 14, 2011 | Current use: Multifamily | Permit id: 6166969 | |||||
SCORE 95 2233 1st Ave Seattle Wa Move an existing temp service - previously reviewed & inspected under #6148918 - plan review not required per gibbs. 12 29 08 mvc: renew. Date: November 19, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: January 26, 2009 | Expiration date: November 19, 2009 | Current use: Multifamily | Permit id: 6161647 | |||||
SCORE 95 Date: May 22, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: March 6, 2008 | Expiration date: May 22, 2008 | Current use: Commercial | Permit id: 6131587 | |||||
SCORE 95 Permit type: Electrical | Permit status: Permit finaled | Completion date: May 19, 2008 | Expiration date: June 12, 2008 | Current use: Commercial | Permit id: 6137304 | |||||
SCORE 95 167 Prospect St Seattle Wa Wiring a single family residence. 1 20 mvc: adding 4 furnace circuits, 5 heaters & 100a subpanel. Date: March 19, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: January 20, 2010 | Expiration date: March 19, 2010 | Current use: Single family / duplex | Permit id: 6211189 | |||||
SCORE 95 6009 Phinney Ave N Seattle Wa Wire new construction - 36 dwelling units & 2 commercial spaces; install (2) 6 amp services & (1) 125 amp service 6 23 05 mvc: submitted revision - adding fire pump service. Permit type: Electrical | Permit status: Permit finaled | Completion date: July 19, 2005 | Expiration date: March 31, 2005 | Current use: Multifamily | Permit id: 6026747 | |||||
SCORE 95 31 Ne 123rd St Seattle Wa Tenant improvement: 1st floor tenant space 9 4 03 mvc: adding 1 30a hvac & 1 50a hvac circuit. Date: July 8, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: September 5, 2003 | Expiration date: July 8, 2004 | Current use: Commercial | Permit id: 6018180 | |||||
SCORE 95 Date: December 14, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2011 | Expiration date: December 14, 2012 | Current use: Commercial | Permit id: 6305098 | |||||
SCORE 95 2827 14th Ave W Seattle Wa Add apartment unit to existing building in basement, relocate exsiting house panel. Date: September 12, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2008 | Expiration date: September 12, 2009 | Current use: Multifamily | Permit id: 6194389 | |||||
SCORE 95 39 Stone Way N Seattle Wa 2 amp temp power for construction of new mixed use bldg; bldg permit 6155610 Date: February 3, 2011 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: February 17, 2011 | Expiration date: February 3, 2012 | Current use: Commercial | Permit id: 6273693 | |||||
SCORE 95 Date: September 10, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 17, 2009 | Expiration date: September 9, 2008 | Current use: Single family / duplex | Permit id: 6153293 | |||||
SCORE 95 Date: July 5, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: March 5, 2008 | Expiration date: July 5, 2007 | Current use: Multifamily | Permit id: 6096516 | |||||
SCORE 95 9631 42nd Ave Sw Seattle Wa Over head temporary pole ufer ground, need ufer inspection 1st was told to get permit like this, and if more is needed for temp inspection will add. Thank you 1@001-125 amp Date: July 1, 2010 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2010 | Expiration date: July 1, 2011 | Current use: Single family / duplex | Permit id: 6253612 | |||||
SCORE 95 Date: November 7, 2002 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: November 8, 2002 | Expiration date: November 7, 2003 | Current use: Commercial | Permit id: 6006528 | |||||
SCORE 95 1536 Nw Market St Seattle Wa Wire new mixed use bldg - ref #753351 - gs #6096201 6 18 07 bew submitted revisions to service; no increase in value of job 4 8 08 jnl - about to expire letter sent Permit type: Electrical | Permit status: Permit closed | Completion date: August 19, 2008 | Expiration date: May 26, 2008 | Current use: Commercial | Permit id: 6096200 | |||||
SCORE 95 Date: May 9, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: September 3, 2003 | Expiration date: May 9, 2004 | Current use: Commercial | Permit id: 6014928 | |||||
SCORE 95 Date: May 21, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: September 3, 2003 | Expiration date: May 21, 2004 | Current use: Commercial | Permit id: 6015838 | |||||
SCORE 95 Date: June 20, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: December 16, 2003 | Expiration date: June 20, 2004 | Current use: Single family / duplex | Permit id: 6017370 | |||||
SCORE 95 Date: October 3, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 21, 2003 | Expiration date: October 3, 2004 | Current use: Commercial | Permit id: 6023108 | |||||
SCORE 95 Date: October 3, 2003 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: October 15, 2003 | Expiration date: October 3, 2004 | Current use: Multifamily | Permit id: 6023105 | |||||
SCORE 95 17 N Northlake Way Seattle Wa Tenant improvement. 3/11/04 cpg add low voltage (1) controller and (11) devices, (1) 1 amp feeder Date: March 8, 2004 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: April 5, 2004 | Expiration date: March 8, 2005 | Current use: Commercial | Permit id: 6031345 | |||||
SCORE 95 Date: February 14, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: February 15, 2006 | Expiration date: February 14, 2007 | Current use: Commercial | Permit id: 6088250 | |||||
SCORE 95 1536 Nw Market St Seattle Wa Get started f/a permit; reference plan review 6095616. 7/5/06 mvc: correction ref review #6096516 Date: April 27, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: July 19, 2007 | Expiration date: April 27, 2007 | Current use: Multifamily | Permit id: 6096518 | |||||
SCORE 95 Date: July 5, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: February 14, 2007 | Expiration date: July 5, 2007 | Current use: Multifamily | Permit id: 6096519 | |||||
SCORE 95 Date: May 30, 2006 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 16, 2006 | Expiration date: May 30, 2007 | Current use: Commercial | Permit id: 6100283 | |||||
SCORE 95 Date: March 22, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: May 11, 2007 | Expiration date: March 22, 2008 | Current use: Commercial | Permit id: 6133208 | |||||
SCORE 95 Date: April 2, 2007 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit finaled | Completion date: June 5, 2008 | Expiration date: April 2, 2008 | Current use: Multifamily | Permit id: 6134350 | |||||
SCORE 95 2233 1st Ave Seattle Wa Wiring new mixed use condominium. 1/11/ mvc: renew. 6/8/12 mvc: reinstate & finish work in existing building, updated owner info - ok by meell. Permit type: Electrical | Permit status: Permit closed | Completion date: February 25, 2013 | Expiration date: June 28, 2013 | Current use: Multifamily | Permit id: 6155434 | |||||
SCORE 95 Date: October 7, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: October 8, 2008 | Expiration date: January 7, 2009 | Current use: Commercial | Permit id: 6196881 | |||||
SCORE 95 Date: November 7, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: December 11, 2008 | Expiration date: November 7, 2009 | Current use: Commercial | Permit id: 6200265 | |||||
SCORE 95 222 Queen Anne Ave N Seattle Wa Day get started permit: conduit for lights in p. T. Deck - ok by porter, ref #6200668 1/13/09trp extended expiration date Date: November 12, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: February 25, 2009 | Expiration date: February 12, 2008 | Current use: Multifamily | Permit id: 6200671 | |||||
SCORE 95 4222 Stone Way N Seattle Wa Teneat improvement, adding lights, switches and outlets. 12/9/08 bew added (2) feeders Date: November 20, 2008 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 11, 2010 | Expiration date: November 20, 2009 | Current use: Commercial | Permit id: 6201582 | |||||
SCORE 95 167 Prospect St Seattle Wa U/g conduit inspection for future connection to service to new sfr; bldg permit 6174164 Date: March 16, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 22, 2010 | Expiration date: March 16, 2010 | Current use: Single family / duplex | Permit id: 6210873 | |||||
SCORE 95 507 Ne Northgate Way Seattle Wa Add one 1 amp 4 volt disconnect to existing service 1-75 kva transformer and one 225 amp 120/208 volt panel. Circuits for lighting and receptacles in tenant space Date: December 29, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: March 10, 2010 | Expiration date: December 29, 2010 | Current use: Commercial | Permit id: 6236719 | |||||
SCORE 95 Date: January 16, 2009 Contractor: Boone Electric Construction Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2009 | Expiration date: April 16, 2009 | Current use: Single family / duplex | Permit id: 6205826 |