Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 69 Georgia Ave Nw, Washington, Dc 20307 Removal of below grade piping associate with former no. 2 fuel usts. The referenced usts were removed in 1997 and supplied the building 15 boiler plant. The piping that transferred the no. 2 fuel oil from usts to the boiler plant was left in place when the usts were removed. A detailed work plans that has been approved by ddo-ust division is attached and site plan, for the army chief of staff installation management. Date: March 25, 2013 Client: Army Chief Of Staff Installation Management. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1300045 |