Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 63 776 N Terminal Dr Salt Lake City, Ut 84116 00 This project will replace the existing apron high mast lighting around the airport concourses a, b, c, and d. Work will include removal and replacement with new efficient apron lighting, poles, bases, wiring and controls. Date: March 30, 2015 Contractor: Apron Mast Lighting Replacementclarence Allred Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-00596 | |||||
SCORE 63 776 N Terminal Dr Salt Lake City, Ut 84116 The airport is requesting plan check. The actual building permit will be paid for and aquired by the contractor Date: March 30, 2015 Contractor: Apron Mast Lighting Replacementclarence Allred Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-00596 | |||||
SCORE 63 Salt Lake City Ut 84116 The airport is requesting plan check. The actual building permit will be paid for and aquired by the contractor Date: January 19, 2017 Contractor: Apron Mast Lighting Replacementclarence Allred Permit status: Closed | Current use: Commercial | Permit id: Bld2014-00596 |