Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 25 Q St Nw, Washington, Dc 20007 Remove one 8,000-gallon heating oil underground storage tank. Initially the tank will be opened, disturbing less than ft2, cleaned and soil samples collected through the bottom of the tank. Then the ddoe will decide if any additional activities are needed, possibly including removing the tank. ![]() ![]() Client: Andrew Gateway Georgetown Condo Association | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1600078 |