Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 17 Euclid St Nw, Washington, Dc 20009 A hollow stem auger will install 8 temporary dewatering wells by advancing a 12 inch od / 8 1/4 inch id borehole to a depth of feet. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 1 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharge to the location detailed on the temporary discharge authorization permit. Date: February 23, 2015 Contractor: Adams Morgan Hotel Llc; Steve Harloe Client: Adams Morgan Hotel, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500131 |