Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 11 15th St Nw, Washington, Dc 20005 Construction of new office space for fannie mae at midtown center on the 5th thru 14th floors, with employee cafeteria for 6 located on the 13th and 14th floors, 2 large conference rooms located on the 13th floor, 1 multipurpose room and a board room located on the 14th floor, mail room, broadcast studio, distributed antenna systems and network switches room, storage, ups, tenant electrical rooms located on p1 level, a new 12k gal. Diesel oil tank located on the p2 level, 2 emg. Generators with 2 - 325 gal. Diesel day tanks located on 14th fl. Tenant will also install 6 convenience stairs between the 7th and 14th floors. Additionally tenant will install 1 stair as a component of the horizontal egress as per code sheet i1. 023, 3 spaces spanning 3 stories between floors 7 and 9, 9 and 11, and 11 and 13 with a 2 hr rated glass and water curtain on levels 9, 11, and 13. All as per the electronically submitted third party reviewed and approved mech., plumb., elect., fire protection, structu Date: May 16, 2017 Contractor: 11 15th Street Llc; John Giusepperamco Permit type: Tenant layout | Permit status: Permit issued | Permit id: Tl1700028 |