Building Permits at Theodore Roosevelt Bridge Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with Theodore Roosevelt Bridge Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Connect 1 theodore roosevelt bridge nw with underground service by building 65 of service conduit from an existing manhole; west of constitution avenue nw as indicated on the attached prints. Wr3435341 tcp 1,11,12 cut#28565 (akargbo@pepco. Com 202-388-2563) d. Moody 202-388-2556
Date:  October 21, 2014
Value:   $300

Client: Pepco | Permit type: Excavation; electric | Permit id: Pa91675-R4
2014/10/2130095Theodore Roosevelt Bridge Washington Dc
The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads.
Date:  February 4, 2015

Permit type: Fixture; traffic sig
2015/02/04095Theodore Roosevelt Bridge Washington Dc
SCORE
95
Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op
Date:  January 11, 2013

Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: June 20, 2013 | Permit id: Pa78515
2013/01/11095Theodore Roosevelt Bridge Washington DcPepco Phi Holdings Inc
SCORE
95
Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op
Date:  June 5, 2013

Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: August 19, 2013 | Permit id: Pa78515-R1
2013/06/05095Theodore Roosevelt Bridge Washington DcPepco Phi Holdings Inc
SCORE
76
Elite will remove 2 variable message signs on theodore roosevelt bridge for vdot, after signs have been refurbished with new compoinents they will be scheduled for reinstallation.
Date:  June 9, 2013
Contractor: Mitch Upton

Permit type: Fixture; sign (w/footings)(exception) | Permit status: Cancel/withdrawn | Expiration date: September 18, 2013
2013/06/09076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
95
Connect 1 theodore roosevelt bridge nw with underground service by building 65 of service conduit from an existing manhole; west of constitution avenue nw as indicated on the attached prints. Wr3435341 tcp 1,11,12 cut#28565 (akargbo@pepco. Com 202-388-2563) d. Moody 202-388-2556
Date:  February 5, 2014
Contractor: Pepco

Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: May 7, 2014 | Permit id: Pa91675
2014/02/05095Theodore Roosevelt Bridge Washington DcPepco
SCORE
78
The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads.
Date:  February 4, 2015
Contractor: Angel Pagan

Permit type: Fixture; traffic signal installation | Permit status: Cancel/withdrawn | Expiration date: June 30, 2015
2015/02/04078Theodore Roosevelt Bridge Washington DcAngel Pagan
SCORE
95
Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op
Date:  January 11, 2013

Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: June 20, 2013 | Permit id: Pa78515
2013/01/11095Theodore Roosevelt Bridge Washington DcPepco Phi Holdings, Inc
SCORE
95
Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op
Date:  June 5, 2013

Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: August 19, 2013 | Permit id: Pa78515-R1
2013/06/05095Theodore Roosevelt Bridge Washington DcPepco Phi Holdings, Inc
SCORE
95
Construction staging area
Date:  April 12, 2014
Contractor: Pepco

Permit status: Expired | Expiration date: May 22, 2014 | Permit id: Pa10132363-R1
2014/04/12095Theodore Roosevelt Bridge Washington DcPepco
SCORE
96
Enp for ddot contractors
Date:  June 13, 2013
Contractor: M.C. Dean, Inc

Permit status: Expired | Expiration date: July 19, 2013 | Permit id: Pa10101134
2013/06/13096Theodore Roosevelt Bridge Washington DcM.C. Dean, Inc
SCORE
76
Construction staging area
Contractor: Mitch Upton

Permit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
79
Other work related occupancy

Permit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0
079Theodore Roosevelt Bridge Washington DcFederal Highway Administration
SCORE
95
Construction staging area
Date:  July 10, 2013
Contractor: Pepco

Permit status: Expired | Expiration date: August 10, 2013 | Permit id: Pa10104439
2013/07/10095Theodore Roosevelt Bridge Washington DcPepco
SCORE
79
Tv & film
Date:  May 2, 2013

Permit status: Expired | Expiration date: May 4, 2013 | Permit id: Pa10095352
2013/05/02079Theodore Roosevelt Bridge Washington DcVitaray Productions Ii
SCORE
78
Fixture; traffic signal installation
Contractor: Angel Pagan

Permit status: 3 | Expiration date: June 30, 2015 | Permit id: 0
078Theodore Roosevelt Bridge Washington DcAngel Pagan
SCORE
79
Tv & film
Date:  March 14, 2012
Contractor: Digital Kitchen

Permit status: Expired | Expiration date: March 27, 2012 | Permit id: Pa10052573
2012/03/14079Theodore Roosevelt Bridge Washington DcDigital Kitchen
SCORE
63
Enp for ddot contractors
Date:  October 7, 2014

Permit status: Expired | Expiration date: January 30, 2015 | Permit id: Pa10162702
2014/10/07063Theodore Roosevelt Bridge Washington DcTy Lin International
SCORE
95
Construction staging area
Date:  May 9, 2014
Contractor: Pepco

Permit status: Expired | Expiration date: June 22, 2014 | Permit id: Pa10132363-R2
2014/05/09095Theodore Roosevelt Bridge Washington DcPepco
SCORE
66
Construction staging area

Permit status: Notpaid | Expiration date: July 3, 2013 | Permit id: 0
066Theodore Roosevelt Bridge Washington DcVirginia Department Of Transportation
SCORE
95
Construction staging area
Contractor: Pepco

Permit status: Notpaid | Expiration date: January 4, 2014 | Permit id: 0
095Theodore Roosevelt Bridge Washington DcPepco
SCORE
76
Fixture; sign (w footings)(exception)
Contractor: Mitch Upton

Permit status: 3 | Expiration date: September 18, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
63
Enp for ddot contractors
Date:  October 28, 2016

Permit status: Expired | Expiration date: December 13, 2016 | Permit id: Pa10353178
2016/10/28063Theodore Roosevelt Bridge Washington DcTy Lin International
SCORE
76
Elite will remove 2 variable message signs on theodore roosevelt bridge for vdot, after signs have been refurbished with new compoinents they will be scheduled for reinstallation.
Contractor: Mitch Upton

Permit status: Cancel/withdrawn | Expiration date: September 18, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
78
The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads.
Contractor: Angel Pagan

Permit status: Cancel/withdrawn | Expiration date: June 30, 2015 | Permit id: 0
078Theodore Roosevelt Bridge Washington DcAngel Pagan
SCORE
76
Construction staging area
Contractor: Mitch Upton

Permit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
66
Construction staging area

Permit status: Not paid | Expiration date: July 3, 2013 | Permit id: 0
066Theodore Roosevelt Bridge Washington DcVirginia Department Of Transportation
SCORE
95
Construction staging area
Contractor: Pepco

Permit status: Not paid | Expiration date: January 4, 2014 | Permit id: 0
095Theodore Roosevelt Bridge Washington DcPepco
SCORE
95
Construction staging area
Date:  March 11, 2014
Contractor: Pepco

Permit status: Permit expired | Expiration date: April 22, 2014 | Permit id: Pa10132363
2014/03/11095Theodore Roosevelt Bridge Washington DcPepco
SCORE
79
Other work related occupancy

Permit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0
079Theodore Roosevelt Bridge Washington DcFederal Highway Administration
SCORE
95
Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op
Date:  March 28, 2013

Permit status: Permit expired | Expiration date: June 20, 2013 | Permit id: Pa78515
2013/03/28095Theodore Roosevelt Bridge Washington DcPepco Phi Holdings, Inc
SCORE
76
Fixture; sign (w footings)(exception)
Contractor: Mitch Upton

Permit status: 3 | Expiration date: September 18, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
95
Connect 1 theodore roosevelt bridge nw with underground service by building 65 of service conduit from an existing manhole; west of constitution avenue nw as indicated on the attached prints. Wr3435341 tcp 1,11,12 cut#28565 (akargbo@pepco. Com 202-388-2563) d. Moody 202-388-2556
Date:  February 24, 2014
Contractor: Pepco

Permit status: Permit expired | Expiration date: May 7, 2014 | Permit id: Pa91675
2014/02/24095Theodore Roosevelt Bridge Washington DcPepco
SCORE
78
Fixture; traffic signal installation
Contractor: Angel Pagan

Permit status: 3 | Expiration date: June 30, 2015 | Permit id: 0
078Theodore Roosevelt Bridge Washington DcAngel Pagan
SCORE
79
Other work related occupancy

Permit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0
079Theodore Roosevelt Bridge Washington DcFederal Highway Administration
SCORE
76
Construction staging area
Contractor: Mitch Upton

Permit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
95
Construction staging area
Contractor: Pepco

Permit status: Notpaid | Expiration date: January 4, 2014 | Permit id: 0
095Theodore Roosevelt Bridge Washington DcPepco
SCORE
66
Construction staging area

Permit status: Notpaid | Expiration date: July 3, 2013 | Permit id: 0
066Theodore Roosevelt Bridge Washington DcVirginia Department Of Transportation
SCORE
76
Elite will remove 2 variable message signs on theodore roosevelt bridge for vdot, after signs have been refurbished with new compoinents they will be scheduled for reinstallation.
Contractor: Mitch Upton

Permit status: Cancel/withdrawn | Expiration date: September 18, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
78
The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads.
Contractor: Angel Pagan

Permit status: Cancel/withdrawn | Expiration date: June 30, 2015 | Permit id: 0
078Theodore Roosevelt Bridge Washington DcAngel Pagan
SCORE
95
Construction staging area
Date:  May 2, 2013
Contractor: Pepco

Permit status: Permit expired | Expiration date: June 11, 2013 | Permit id: Pa10094728
2013/05/02095Theodore Roosevelt Bridge Washington DcPepco
SCORE
79
Tv & film
Date:  April 30, 2013

Permit status: Permit expired | Expiration date: May 5, 2013 | Permit id: Pa10091105
2013/04/30079Theodore Roosevelt Bridge Washington DcVitaray Productions Ii
SCORE
66
Construction staging area

Permit status: Not paid | Expiration date: July 3, 2013 | Permit id: 0
066Theodore Roosevelt Bridge Washington DcVirginia Department Of Transportation
SCORE
76
Construction staging area
Contractor: Mitch Upton

Permit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0
076Theodore Roosevelt Bridge Washington DcMitch Upton
SCORE
66
Construction staging area
Date:  August 5, 2013

Permit status: Permit expired | Expiration date: October 31, 2013 | Permit id: Pa10107466
2013/08/05066Theodore Roosevelt Bridge Washington DcVirginia Department Of Transportation
SCORE
95
Construction staging area
Contractor: Pepco

Permit status: Not paid | Expiration date: January 4, 2014 | Permit id: 0
095Theodore Roosevelt Bridge Washington DcPepco
SCORE
79
Other work related occupancy

Permit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0
079Theodore Roosevelt Bridge Washington DcFederal Highway Administration
SCORE
84
Tv & film
Date:  November 11, 2016
Contractor: Thinkfilm, Inc

Permit status: Permit expired | Expiration date: November 13, 2016 | Permit id: Pa10354979
2016/11/11084Theodore Roosevelt Bridge Washington DcThinkfilm, Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.