Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Bfd smoke/co inspection and Date: June 25, 2013 Expiration date: August 24, 2013 | Current use: 1unit | Permit id: Smk241674 | |||||
Bfd smoke/co inspection and Date: January 13, 2016 Expiration date: March 13, 2016 | Current use: 1unit | Permit id: Smk552038 | |||||
SCORE 59 Proposed work: improving rear egress. Present egress does not meet code and was determined that it was improperly sized and unsafe as an emergency form of egress for the occupants of the building. Improving rear egress by building a new exterior wood framed exit stair.) last action: ready to issue Date: July 15, 2013 Contractor: Peter Bagarella Permit type: Long form/alteration permit | Expiration date: January 15, 2014 | Current use: 1-3fam | Permit id: Alt7441 | |||||
SCORE 89 Proposed work: improving rear egress. Present egress does not meet code and was determined that it was improperly sized and unsafe as an emergency form of egress for the occupants of the building. Improving rear egress by building a new exterior wood framed exit stair.) last action: ready to issue Date: July 15, 2013 Contractor: Robert Pasquale Permit type: Long form/alteration permit | Expiration date: January 15, 2014 | Current use: 1-3fam | Permit id: Alt7441 |